Pegasus Builders
- Based in
- San Francisco
- On San Francisco permits
- Nov 2011 to Jan 2018
- Last 24 months
- 0 permits filed
26 permits since 2000: 22 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2018 | Completed final sign-off Feb 2018 | 3615 Market St | to obtain fifnal inspection for work approved under pa#201504083124. all work is complete.Details
to obtain fifnal inspection for work approved under pa#201504083124. all work is complete. | |
| Apr 26, 2017 | Completed final sign-off May 2017 | 1237 Rhode Island St | replace rotten portion of handrails on rear deck terraces as is 50%. to comply with nov 201767751, items no. # 3 only. less than 50% repair.Details
replace rotten portion of handrails on rear deck terraces as is 50%. to comply with nov 201767751, items no. # 3 only. less than 50% repair. | $3,500 |
| Mar 21, 2017 | Completed final sign-off Jan 2018 | 192 Yerba Buena Av | remodel (e) kitchen on main (2nd) floor. new doors at rear of building.Details
remodel (e) kitchen on main (2nd) floor. new doors at rear of building. | $30,000 |
| Jan 19, 2017 | Completed final sign-off Jun 2018 | 1401 Monterey Bl | sheetrock, wire plumbing on 2.5 existing baths and 3 existing bedrooms. 2.5 bathroom remodels (in kind) non structural.Details
sheetrock, wire plumbing on 2.5 existing baths and 3 existing bedrooms. 2.5 bathroom remodels (in kind) non structural. | $30,000 |
| Nov 7, 2016 | Completed final sign-off Jun 2018 | 1401 Monterey Bl | under construction. revision to approved bpa #201412022874-s1. relocate sliding door & window @ ground fl, (n) posts under 2nd fl balcony, remove chimney @ 3rd fl south facade, minor interior changes to layout. ** maher: n/a **Details
under construction. revision to approved bpa #201412022874-s1. relocate sliding door & window @ ground fl, (n) posts under 2nd fl balcony, remove chimney @ 3rd fl south facade, minor interior changes to layout. ** maher: n/a ** | |
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 842 Shotwell St | kitchen and bathroom remodel as is. new sink, tub cabinets, reinstall sheetrock in unit.Details
kitchen and bathroom remodel as is. new sink, tub cabinets, reinstall sheetrock in unit. | $62,000 |
| Apr 19, 2016 | Completed final sign-off Feb 2018 | 3615 Market St | revision to pa #201504083124 - revise heating from forced air to water radiant, structural revision s for exisitng conditions.Details
revision to pa #201504083124 - revise heating from forced air to water radiant, structural revision s for exisitng conditions. | $5,000 |
| Sep 16, 2015 | Completed final sign-off Feb 2017 | 4380 24th St | replace siding patches, right side east side, replace in kind, no structural work.Details
replace siding patches, right side east side, replace in kind, no structural work. | $4,500 |
| Aug 24, 2015 | Completed final sign-off Feb 2016 | 575 Panorama Dr | creative living space at extg garage level: new bedroom, bath, office and media room.Details
creative living space at extg garage level: new bedroom, bath, office and media room. | $70,000 |
| Aug 5, 2015 | Expired or cancelled cancelled Feb 2020 | 60 27th Av | excavation of (e) driveway @ rear (east) property to easement level. construction of new garage extension toward rear of property. construction of new deck above proposed garage, new patio. new bathroom @ basement. new exercise room to replace (e) garage.Details
excavation of (e) driveway @ rear (east) property to easement level. construction of new garage extension toward rear of property. construction of new deck above proposed garage, new patio. new bathroom @ basement. new exercise room to replace (e) garage. | $125,000 |
| Jul 16, 2015 | Completed final sign-off Jul 2017 | 4376 24th St | structural revision to g/f level to pa#201301168071Details
structural revision to g/f level to pa#201301168071 | |
| Jun 5, 2015 | Completed final sign-off Feb 2017 | 244 Grafton Av | build a new retaining wall in the rear yard of the building.Details
build a new retaining wall in the rear yard of the building. | $16,000 |
| Apr 8, 2015 | Completed final sign-off Feb 2018 | 3615 Market St | seismice strengthening; new roof membrane; rebuild of stair at interior; renovation of kitchen, bathroom, conversion of portion of garage/laundry to bedroom; conversion of bedroom to closet & powder room. replace 1 rear window - not visible from street no expansion of existing building envelope.Details
seismice strengthening; new roof membrane; rebuild of stair at interior; renovation of kitchen, bathroom, conversion of portion of garage/laundry to bedroom; conversion of bedroom to closet & powder room. replace 1 rear window - not visible from street no expansion of existing building envelope. | $97,500 |
| Feb 4, 2015 | Never finaled issued Aug 2015, no final | 129 De Soto St | altered site permit; reference pa# 2013/0925/7690-s. extend 3rd story upper living space over patio. enlarge bedroom and bath.Details
altered site permit; reference pa# 2013/0925/7690-s. extend 3rd story upper living space over patio. enlarge bedroom and bath. | $20,000 |
| Dec 2, 2014 | Completed final sign-off Jun 2018 | 1401 Monterey Bl | rear addition of 39 sf @ 1st & 2nd fl w/ a additional 39 sf balcony off 2nd fl. garage addition is expande 95 sf @ side of home. garage door is moved to side of house & 1 2nd garage door is added. kitchen remodel w/ bathroom & stair.Details
rear addition of 39 sf @ 1st & 2nd fl w/ a additional 39 sf balcony off 2nd fl. garage addition is expande 95 sf @ side of home. garage door is moved to side of house & 1 2nd garage door is added. kitchen remodel w/ bathroom & stair. | $120,000 |
| Nov 7, 2014 | Completed final sign-off May 2015 | 250 Molimo Dr | convert garage storage area into 1 bedroom, office, 1 bath, install new furnace, replace water heater, replace washer and dryerDetails
convert garage storage area into 1 bedroom, office, 1 bath, install new furnace, replace water heater, replace washer and dryer | $60,000 |
| Sep 18, 2014 | Expired or cancelled expired Mar 2022 | 130 Lenox Wy | remodel existing 2nd bathroom first floor.Details
remodel existing 2nd bathroom first floor. | $10,000 |
| Aug 25, 2014 | Completed final sign-off May 2018 | 129 De Soto St | construct (n) 1-story detached private garage.Details
construct (n) 1-story detached private garage. | $20,000 |
| May 28, 2014 | Completed final sign-off Jun 2014 | 684 30th Av | replace all windows in kind. windows made with ultrex fiberglass. street visible. no structural work.Details
replace all windows in kind. windows made with ultrex fiberglass. street visible. no structural work. | $14,000 |
| Sep 25, 2013 | Never finaled issued Oct 2014, no final | 129 De Soto St | construct horizontal addition 8 renovate building interior construct (n) rear yard garage. add kitchen, bath & living to (e) first floor.Details
construct horizontal addition 8 renovate building interior construct (n) rear yard garage. add kitchen, bath & living to (e) first floor. | $375,000 |
| Sep 10, 2013 | Completed final sign-off Mar 2014 | 2674 15th Av | interior renovation to repair flood damage, new slab on grade, minor reconfiguration of second level to create code compliant interior stair, reconfiguration of lower level, infill lightwell.Details
interior renovation to repair flood damage, new slab on grade, minor reconfiguration of second level to create code compliant interior stair, reconfiguration of lower level, infill lightwell. | $158,000 |
| Jun 5, 2013 | Completed final sign-off Dec 2014 | 720 27th St | renovate (e) 2 story single family residence to include a horizontal addition & interior remodel including (n) master bed & bath, enlarge (e) garage, (e) living & dining & (n) deck above addition.Details
renovate (e) 2 story single family residence to include a horizontal addition & interior remodel including (n) master bed & bath, enlarge (e) garage, (e) living & dining & (n) deck above addition. | $160,497 |
| Apr 5, 2013 | Completed final sign-off May 2017 | 295 Sanchez St | vertical addition - (n) 4th floor; interior remodel throughout; (n) deck @ rear. horizontal addition to ground floor. add 1 off street parking.Details
vertical addition - (n) 4th floor; interior remodel throughout; (n) deck @ rear. horizontal addition to ground floor. add 1 off street parking. | $265,000 |
| Jan 16, 2013 | Completed final sign-off Jul 2017 | 4376 24th St | erect to 3 stories of one single family.Details
erect to 3 stories of one single family. | $900,000 |
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 637 Noe St | remodel upstairs bath/laundry room.Details
remodel upstairs bath/laundry room. | $18,000 |
| Nov 1, 2011 | Completed final sign-off Oct 2014 | 339 Kirkham St | remodel rear of house: remove 2bedrm, add (n) dining, kitchen & living rm & rear yard deck. relocate (e) bath & storage on level 2. remodel level 1 (garage), raise garage ceiling 2ft. add (n) family rm, bedrm & bath. add (n) level 3 in attic space in front, new fl in back w/ 3bedrm, 2bathrm. upgradeDetails
remodel rear of house: remove 2bedrm, add (n) dining, kitchen & living rm & rear yard deck. relocate (e) bath & storage on level 2. remodel level 1 (garage), raise garage ceiling 2ft. add (n) family rm, bedrm & bath. add (n) level 3 in attic space in front, new fl in back w/ 3bedrm, 2bathrm. upgrade | $150,000 |