Pechonis Construction
- Based in
- Concord
- On San Francisco permits
- Aug 2008 to Aug 2008
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2008 | Completed final sign-off Sep 2008 | 326 Anderson St | replace siding around stair case as its dry rotted, stair treads + risers rotten members, repair decking with new rise of stairs is 9 in and no way to alter cosmetics less than 50% of stairway: @ front.Details
replace siding around stair case as its dry rotted, stair treads + risers rotten members, repair decking with new rise of stairs is 9 in and no way to alter cosmetics less than 50% of stairway: @ front. | $10,500 |