Patrick Construction
- Based in
- Brentwood
- On San Francisco permits
- Jul 2020 to Apr 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2021 | Expired or cancelled withdrawn Mar 2024 | 122 Tucker Av | add a deck off 2nd floor master bedroom. 10'x25'.Details
add a deck off 2nd floor master bedroom. 10'x25'. | $15,000 |
| Jul 7, 2020 | Completed final sign-off Feb 2021 | 122 Tucker Av | fire damage repair/replace, all interior 2nd fl. electrical, minor plumbing, insulation (walls and ceiling) sheet rock, flooring, interior trim, kitchen, 2 baths. all works like for like fire damage repair, no alteration to existing framing or layout.Details
fire damage repair/replace, all interior 2nd fl. electrical, minor plumbing, insulation (walls and ceiling) sheet rock, flooring, interior trim, kitchen, 2 baths. all works like for like fire damage repair, no alteration to existing framing or layout. | $100,000 |