Pascual Construction Inc Dba Sure Line P
- Based in
- Daly City
- On San Francisco permits
- Jan 2011 to Nov 2024
- Last 24 months
- 1 permit filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2024 | Completed final sign-off Nov 2025 | 198 02nd St | to comply with nov 202426716 - sidewalk adjacent to the bldg is supported by steel framing in basement level of structure. preventative maintenance repair of underside of sidewalk in limited areas where the underside of slab is experiencing efflorescence. additionally, @ (e) construction joint,Details
to comply with nov 202426716 - sidewalk adjacent to the bldg is supported by steel framing in basement level of structure. preventative maintenance repair of underside of sidewalk in limited areas where the underside of slab is experiencing efflorescence. additionally, @ (e) construction joint, | $13,500 |
| Dec 12, 2023 | Completed final sign-off Mar 2024 | 690 Guerrero St | unit #6: bathroom renovation - replace tub, vanity, toilet, and electrical. kitchen renovation - replace cabinets, plumbing, electrical. electrical - rewire the whole unit, new 60 amp panel.Details
unit #6: bathroom renovation - replace tub, vanity, toilet, and electrical. kitchen renovation - replace cabinets, plumbing, electrical. electrical - rewire the whole unit, new 60 amp panel. | $30,000 |
| Sep 15, 2023 | Completed final sign-off Nov 2023 | 690 Guerrero St | unit#4: 1-bathroom-replace tub, vanity cbinet, faucet, lights,switches, fan; 1-kitchen-replace, cabinet, countertop, sink faucet, appliances; electrical-rewire entire unit, new subpanel 60 ampDetails
unit#4: 1-bathroom-replace tub, vanity cbinet, faucet, lights,switches, fan; 1-kitchen-replace, cabinet, countertop, sink faucet, appliances; electrical-rewire entire unit, new subpanel 60 amp | $30,000 |
| Sep 23, 2021 | Completed final sign-off Dec 2021 | 2563 38th Av | revision to pa 202009124027. relocate a door and add a window at rear wall.Details
revision to pa 202009124027. relocate a door and add a window at rear wall. | $200 |
| Jun 18, 2021 | Completed final sign-off May 2022 | 4340 Ulloa St | revision to pa# 201902273966 & pa# 201812057557; re-configuration of access to rooms downstairs. non struct.Details
revision to pa# 201902273966 & pa# 201812057557; re-configuration of access to rooms downstairs. non struct. | $750 |
| May 18, 2021 | Completed final sign-off May 2022 | 956 Ashbury St | 1 kitchen renovation: new cabinets, countertop, 12 outlets and 8 lights. relocate sink. 1 bathroom renovation: remove claw foot tub. install new shower pan, replace outlet, install 2 lights, upgrade electrical panel.Details
1 kitchen renovation: new cabinets, countertop, 12 outlets and 8 lights. relocate sink. 1 bathroom renovation: remove claw foot tub. install new shower pan, replace outlet, install 2 lights, upgrade electrical panel. | $23,000 |
| Oct 31, 2020 | Completed final sign-off Jul 2021 | 1946 18th Av | to comply with board of appears #19-066, dated 10/30/2020 by julie rosenbergDetails
to comply with board of appears #19-066, dated 10/30/2020 by julie rosenberg | |
| Sep 12, 2020 | Completed final sign-off Dec 2021 | 2563 38th Av | add a family room, bedroom. full bathroom on 1st floor. remove storage room at the backyard.Details
add a family room, bedroom. full bathroom on 1st floor. remove storage room at the backyard. | $80,000 |
| Jun 12, 2019 | Completed final sign-off Jul 2021 | 1946 18th Av | to comply w/ n.o.v 201956051. reinforced (e) fence, added new posts and install (n) fence boards.Details
to comply w/ n.o.v 201956051. reinforced (e) fence, added new posts and install (n) fence boards. | $10,000 |
| Feb 27, 2019 | Completed final sign-off May 2022 | 4340 Ulloa St | remodel kitchen & (e) stairs bath. new full bath upstairs. repair & replace dryrot. new down stair window at rear.Details
remodel kitchen & (e) stairs bath. new full bath upstairs. repair & replace dryrot. new down stair window at rear. | $45,000 |
| Dec 5, 2018 | Completed final sign-off May 2022 | 4340 Ulloa St | reconfigure upstairs hallway; remove kitchen wall and repair and replace dryrotDetails
reconfigure upstairs hallway; remove kitchen wall and repair and replace dryrot | $25,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2019 | 350 Ney St | kitchen and bathroom renovation. no structural work. same layout.Details
kitchen and bathroom renovation. no structural work. same layout. | $25,000 |
| May 25, 2018 | Completed final sign-off Jun 2018 | 9 Regent St | to obtain final inspection for work approved under pa#201708013853. all work is complete.Details
to obtain final inspection for work approved under pa#201708013853. all work is complete. | |
| Oct 6, 2017 | Completed final sign-off Oct 2017 | 168 Clinton Pk | comply with nov 201774411: replace fireplace insert, furnace no exterior workDetails
comply with nov 201774411: replace fireplace insert, furnace no exterior work | $2,500 |
| Aug 30, 2017 | Completed final sign-off Jun 2018 | 9 Regent St | revision to pa #201608013853. relocation half bath at ground fl to full bath at top level. new egress at rear (sub-standard). replace & repair dryrot/improper framing in kind. replace section of (e) fondation.Details
revision to pa #201608013853. relocation half bath at ground fl to full bath at top level. new egress at rear (sub-standard). replace & repair dryrot/improper framing in kind. replace section of (e) fondation. | $30,000 |
| Aug 11, 2017 | Completed final sign-off Oct 2017 | 168 Clinton Pk | remove obsolete (7c) heat service, patch hole on floor/ceiling in garage, replacement heat source under separate permit. partial compliance with nov #201774411, 7cDetails
remove obsolete (7c) heat service, patch hole on floor/ceiling in garage, replacement heat source under separate permit. partial compliance with nov #201774411, 7c | $1,000 |
| Apr 13, 2017 | Completed final sign-off May 2017 | 170 Clinton Pk | kitchen remodel - new cabinets & countertop. new window at rear. repatch ceiling & walls, paint. light, plum, new appliancesDetails
kitchen remodel - new cabinets & countertop. new window at rear. repatch ceiling & walls, paint. light, plum, new appliances | $6,295 |
| Oct 19, 2015 | Completed final sign-off Jan 2016 | 2750 38th Av | eliminate water closet & sink i n bedroom closet at 2nd floor, patch walls & floor, replace ceiling lights, paint & refinish floor. no structural work. all repairs in-kindDetails
eliminate water closet & sink i n bedroom closet at 2nd floor, patch walls & floor, replace ceiling lights, paint & refinish floor. no structural work. all repairs in-kind | $5,000 |
| Jul 28, 2014 | Completed final sign-off Sep 2014 | 82 Getz St | complete bathroom renovation, no structural workDetails
complete bathroom renovation, no structural work | $7,000 |
| Jul 2, 2014 | Never finaled issued Sep 2014, no final | 1830 Clay St | work in unit #2. remodel bathroom, kitchen in existing apt. work include new pocket door, removal of sliding door, add new doors and add bathroom window per plan. upgrade electrical system. install new heating. maher n/a.Details
work in unit #2. remodel bathroom, kitchen in existing apt. work include new pocket door, removal of sliding door, add new doors and add bathroom window per plan. upgrade electrical system. install new heating. maher n/a. | $14,000 |
| Mar 12, 2014 | Completed final sign-off Jun 2014 | 267 San Jose Av | unit 1 - remodel kitchen and bathroom; to comply with cec150(k) 8 & 10. no new openings, no windows.Details
unit 1 - remodel kitchen and bathroom; to comply with cec150(k) 8 & 10. no new openings, no windows. | $18,000 |
| Aug 24, 2011 | Completed final sign-off Nov 2011 | 1177 California St | unit #1401: kitchen and bathroom renovationDetails
unit #1401: kitchen and bathroom renovation | $45,000 |
| Feb 7, 2011 | Completed final sign-off Jun 2011 | 245 Joost Av | bathroom renovation on 2nd flrDetails
bathroom renovation on 2nd flr | $6,500 |
| Jan 3, 2011 | Completed final sign-off Jan 2011 | 5630 Fulton St | reroofingDetails
reroofing | $7,500 |