Pascal Liope
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Mar 2026
- Last 24 months
- 2 permits filed
29 permits since 2000: 27 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2026 | Completed final sign-off Sep 2026 | 688 Capp St | 2nd story -kitchen remodel: replace(e) cabinets and tile floor. install(n) range, range hood and sink. relocate one door by 14 inches. install new lighting & controls. like to like. back porch: replace water damaged subfloor. install new linoleum tiles. complete minor dry rot repairsDetails
2nd story -kitchen remodel: replace(e) cabinets and tile floor. install(n) range, range hood and sink. relocate one door by 14 inches. install new lighting & controls. like to like. back porch: replace water damaged subfloor. install new linoleum tiles. complete minor dry rot repairs | $60,000 |
| Oct 28, 2025 | Completed final sign-off Aug 2026 | 674 Castro St | front building - conversion of an existing hallway space and a part of a laundry room to the 2nd bathroom. addition of heated tile floor to existing bathroomDetails
front building - conversion of an existing hallway space and a part of a laundry room to the 2nd bathroom. addition of heated tile floor to existing bathroom | $45,000 |
| Mar 13, 2023 | Completed final sign-off Jul 2023 | 2034 22nd Av | revision to pa #201909272918-s1. reduce scope of work. all work to be done on upper floor, bath remodel, (6) windows, (1) skylight, electrical upgrade in (2) bedrooms, (6) doors (3 pockets/3 regular)Details
revision to pa #201909272918-s1. reduce scope of work. all work to be done on upper floor, bath remodel, (6) windows, (1) skylight, electrical upgrade in (2) bedrooms, (6) doors (3 pockets/3 regular) | |
| Nov 14, 2022 | Completed final sign-off Jun 2023 | 324 Pacheco St | guest bathroom complete remodel, move/replace (e) window. no work is visible from street.Details
guest bathroom complete remodel, move/replace (e) window. no work is visible from street. | $37,500 |
| Sep 27, 2019 | Never finaled issued Sep 2021, no final | 2034 22nd Av | single story rear yard addition & renovation of existing two story building. reconstruct existing interior stair. reconfigure upper floor bathroom and closet.Details
single story rear yard addition & renovation of existing two story building. reconstruct existing interior stair. reconfigure upper floor bathroom and closet. | $274,043 |
| Sep 10, 2018 | Completed final sign-off Jan 2019 | 129 Retiro Wy | install new french door in place of single door in basement accessing backyardDetails
install new french door in place of single door in basement accessing backyard | $32,000 |
| Feb 26, 2018 | Completed final sign-off Aug 2018 | 3033 Irving St | complete kitchen remodel, upgrade electrical and plumbing. replace (e) kitchen window in kind (replacement window not visible from stree) u-factor < 0.32. all new light should be led. no change to walls or doors.Details
complete kitchen remodel, upgrade electrical and plumbing. replace (e) kitchen window in kind (replacement window not visible from stree) u-factor < 0.32. all new light should be led. no change to walls or doors. | $40,000 |
| Oct 24, 2017 | Completed final sign-off Jan 2018 | 1627 18th Av | install new 4x4 posts (2), 4x12 beam at 2nd fl to support ceiling joists. shear wall section. revision to 201708235652Details
install new 4x4 posts (2), 4x12 beam at 2nd fl to support ceiling joists. shear wall section. revision to 201708235652 | $3,000 |
| Aug 23, 2017 | Completed final sign-off Jan 2018 | 1627 18th Av | complete kitchen remodel, new electrical, plumbing, remove section of non-bearing wall. all new lites shall be led.Details
complete kitchen remodel, new electrical, plumbing, remove section of non-bearing wall. all new lites shall be led. | $61,000 |
| Apr 7, 2017 | Completed final sign-off Aug 2017 | 1811 29th Av | bathroom remodel, replace 1 window(awning) not visible from street. u factor .32Details
bathroom remodel, replace 1 window(awning) not visible from street. u factor .32 | $30,000 |
| Oct 28, 2016 | Completed final sign-off Mar 2017 | 324 Pacheco St | 2nd floor guest bathroom, complete remodel. move (e) window, add fanDetails
2nd floor guest bathroom, complete remodel. move (e) window, add fan | $41,000 |
| Jun 15, 2015 | Completed final sign-off Mar 2016 | 324 Pacheco St | master bath complete remodel, move 1 existing window. master closet remodel. fill in 1 existing window. guest bath/partial remodel (tub surround, toilet). no work street visible.Details
master bath complete remodel, move 1 existing window. master closet remodel. fill in 1 existing window. guest bath/partial remodel (tub surround, toilet). no work street visible. | $55,000 |
| Jun 15, 2015 | Completed final sign-off Dec 2015 | 74 Brady St | unit 10: kitchen remodel, change cabinets in-kind, led lighting.Details
unit 10: kitchen remodel, change cabinets in-kind, led lighting. | $22,000 |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 993 Tennessee St | unit 1 - remove bath tub & tiles surrond; replace with shower basin- install blocking for glass door (shower); replace (e) basin. n/a maher ord. # 155-13Details
unit 1 - remove bath tub & tiles surrond; replace with shower basin- install blocking for glass door (shower); replace (e) basin. n/a maher ord. # 155-13 | $12,000 |
| Jan 30, 2015 | Completed final sign-off Apr 2015 | 512 Gennessee St | remodel bathroom - replace tub, tile, vanity, relocate/replace toilet, finishes only. no walls to be moved/no structural work.Details
remodel bathroom - replace tub, tile, vanity, relocate/replace toilet, finishes only. no walls to be moved/no structural work. | $10,000 |
| Dec 30, 2014 | Completed final sign-off Jun 2015 | 33 Sotelo Av | addition of bedroom/bath 280 sf within existing garage. e 2 car parking maintained. elec/plumbing/mech under sep permit. e gas furnace /wter heaters to remainDetails
addition of bedroom/bath 280 sf within existing garage. e 2 car parking maintained. elec/plumbing/mech under sep permit. e gas furnace /wter heaters to remain | $20,000 |
| Nov 3, 2014 | Completed final sign-off Feb 2015 | 1920 Ocean Av | #3a: partial remodeling, change cabinets, new drywall. kitchen remodel. no structural work.Details
#3a: partial remodeling, change cabinets, new drywall. kitchen remodel. no structural work. | $8,900 |
| Feb 10, 2014 | Completed final sign-off Jun 2014 | 57 Joost Av | remodel bathroom & kitchen, enlarge doorway to dining room, new skylight in kitchen, new hood vented through roof.Details
remodel bathroom & kitchen, enlarge doorway to dining room, new skylight in kitchen, new hood vented through roof. | $45,750 |
| Nov 14, 2013 | Completed final sign-off Jun 2014 | 2034 22nd Av | partial remodeling (change of cabinets), no change of wall, door & windowDetails
partial remodeling (change of cabinets), no change of wall, door & window | $15,500 |
| Sep 23, 2013 | Completed final sign-off Apr 2014 | 172 Precita Av | kitchen remodel, window in-fill, enlarge doorway to dining room, change french door in kind, install new hood vent through wall.Details
kitchen remodel, window in-fill, enlarge doorway to dining room, change french door in kind, install new hood vent through wall. | $31,750 |
| Mar 20, 2013 | Completed final sign-off Sep 2013 | 4201 21st St | kitchen remodeling: non bearing wall remodel. replace 3 extg windows, wood & aluminum clad, double hung, u-factor 0.40 max. no change in wondow size location.Details
kitchen remodeling: non bearing wall remodel. replace 3 extg windows, wood & aluminum clad, double hung, u-factor 0.40 max. no change in wondow size location. | $21,625 |
| Jan 26, 2012 | Never finaled issued Jan 2012, no final | 180 Mallorca Wy | replace one kitchen cabinets, install counter top, dishwasher, new oak floor, lighting to comply with cec 150(k); no change to window wiall or doorsDetails
replace one kitchen cabinets, install counter top, dishwasher, new oak floor, lighting to comply with cec 150(k); no change to window wiall or doors | $17,092 |
| Feb 11, 2011 | Completed final sign-off Jan 2012 | 2017 14th Av | construct a new deck 8' x 15' and landing and stair in back of house on 2nd floor. new landing and stairs.Details
construct a new deck 8' x 15' and landing and stair in back of house on 2nd floor. new landing and stairs. | $47,000 |
| Jul 29, 2010 | Completed final sign-off Feb 2011 | 2017 14th Av | remodel (e) kitchen & bathroom. new water lines, upgrade electrical, upgrade mechanical, remove/replace skylights, legalize (e) full bathroom & office on garage levelDetails
remodel (e) kitchen & bathroom. new water lines, upgrade electrical, upgrade mechanical, remove/replace skylights, legalize (e) full bathroom & office on garage level | $50,000 |
| Aug 6, 2009 | Completed final sign-off Sep 2009 | 2006 Lyon St | replace (e) shingles on back wall on 2 upper floors in kind. (no structural framing or plywood changes). not visible from street.Details
replace (e) shingles on back wall on 2 upper floors in kind. (no structural framing or plywood changes). not visible from street. | $8,300 |
| Apr 9, 2009 | Completed final sign-off Jul 2009 | 512 Gennessee St | kitchen remodel, remove section of wall, changing flooring, cabinet & appliances.Details
kitchen remodel, remove section of wall, changing flooring, cabinet & appliances. | $40,600 |
| Apr 14, 2008 | Completed final sign-off Sep 2008 | 1521 Rivera St | old non-structural part. to be removed. building new part. new skylight (2x4'). repalce/enlarge door opening in basement. new window - partial electrical - all work @ ground level. add bedroom.Details
old non-structural part. to be removed. building new part. new skylight (2x4'). repalce/enlarge door opening in basement. new window - partial electrical - all work @ ground level. add bedroom. | $30,000 |
| May 11, 2007 | Completed final sign-off Jul 2007 | 512 Gennessee St | replace wood siding to weatherproof south side of house.install red cedar,primed,cove siding(similar to current).add 5/8 gypsum-type x for fire retardant(currently 3/8 between studs)&new moisture barrier(currently installed).add insulation(currently none).replace trim as needed.rot repair as needed.Details
replace wood siding to weatherproof south side of house.install red cedar,primed,cove siding(similar to current).add 5/8 gypsum-type x for fire retardant(currently 3/8 between studs)&new moisture barrier(currently installed).add insulation(currently none).replace trim as needed.rot repair as needed. | $35,000 |
| Aug 14, 2006 | Completed final sign-off Apr 2007 | 1524 Rivera St | kitchen remodel , new sink drainboard stove refri, dishwash and new cabinets. some sheetrock, finishes to matche (e). no structural work.Details
kitchen remodel , new sink drainboard stove refri, dishwash and new cabinets. some sheetrock, finishes to matche (e). no structural work. | $30,000 |