Papago Engineering Inc.
- Based in
- Santa Rosa
- On San Francisco permits
- Apr 2011 to Apr 2011
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2011 | Never finaled issued Apr 2011, no final | 200 Brannan St | tile installation, remove outlets above sink, install light fixtures, install stove 220 volt cable, relocation of wine fridge outet, relocate sink plumbing, modify 16 in.x16in. tile into 8in.x3in. kitchen remodel, non-structural, in-kind. min. 50% of kitchen light wattage shall be of high efficacyDetails
tile installation, remove outlets above sink, install light fixtures, install stove 220 volt cable, relocation of wine fridge outet, relocate sink plumbing, modify 16 in.x16in. tile into 8in.x3in. kitchen remodel, non-structural, in-kind. min. 50% of kitchen light wattage shall be of high efficacy | $7,500 |