Pan Geo Construction
- Based in
- Oakland
- On San Francisco permits
- Apr 2014 to Dec 2022
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2022 | Completed final sign-off Apr 2023 | 150 Andover St | revision to pa#202211086083. minor structural alterations for kitchen and bath remodeling, including: combine a door and adjacent pass through into one wider opening, and widening the opening to the kitchen.Details
revision to pa#202211086083. minor structural alterations for kitchen and bath remodeling, including: combine a door and adjacent pass through into one wider opening, and widening the opening to the kitchen. | $8,500 |
| Nov 8, 2022 | Completed final sign-off Apr 2023 | 150 Andover St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). | $35,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 1712 Noe St | revision to appl #2015.0127.6762 - replace (e) wall heater at back building. replace (e) rotted siding wherever necessary at front & rear ground floor area at front building.Details
revision to appl #2015.0127.6762 - replace (e) wall heater at back building. replace (e) rotted siding wherever necessary at front & rear ground floor area at front building. | $5,000 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 561 Elizabeth St | revision to 201410158927. add cantilevered balcony approx 24 sf off 2nd fl. tie to 2 2x8 joist framing okay. reframe e skylights in kitchen at celing. not visible from street. indicate size of beam to 4x12 at ceiling 2nd flDetails
revision to 201410158927. add cantilevered balcony approx 24 sf off 2nd fl. tie to 2 2x8 joist framing okay. reframe e skylights in kitchen at celing. not visible from street. indicate size of beam to 4x12 at ceiling 2nd fl | $1,940 |
| Feb 3, 2015 | Completed final sign-off Mar 2015 | 343 16th Av | replace 8 windows at rear bathrooms, remodel (3) kitchen. remodel no layout changes. comply with nov# 201522011. u =0.32Details
replace 8 windows at rear bathrooms, remodel (3) kitchen. remodel no layout changes. comply with nov# 201522011. u =0.32 | $28,000 |
| Jan 29, 2015 | Completed final sign-off Mar 2015 | 343 16th Av | comply with nov# 201522011. replace 5 front windows with aluminium wood clad windows in kind.Details
comply with nov# 201522011. replace 5 front windows with aluminium wood clad windows in kind. | $2,000 |
| Dec 5, 2014 | Completed final sign-off Jul 2015 | 517 Mississippi St | revision to permit application # 2014-1016-9080. garage framing design.Details
revision to permit application # 2014-1016-9080. garage framing design. | $8,000 |
| Oct 16, 2014 | Completed final sign-off Jul 2015 | 517 Mississippi St | interior renovation of (e) kitchen, (e) 1st floor bathroom, and (e) 2nd flr master bathroom, relocate (e) master bathroom, demo (e) 1st flr bedroom and convert to living room.Details
interior renovation of (e) kitchen, (e) 1st floor bathroom, and (e) 2nd flr master bathroom, relocate (e) master bathroom, demo (e) 1st flr bedroom and convert to living room. | $48,500 |
| Apr 23, 2014 | Completed final sign-off Oct 2015 | 1712 Noe St | back rear building:tile extg bathroom, handrail, new steps.Details
back rear building:tile extg bathroom, handrail, new steps. | $1,000 |
| Apr 15, 2014 | Completed final sign-off Jun 2016 | 1712 Noe St | comply with nov 201450862: front bldg: remodel e kitchen, new tile 1 bath.Details
comply with nov 201450862: front bldg: remodel e kitchen, new tile 1 bath. | $9,000 |