Pallari Construction General Contracting
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Sep 2026
- Last 24 months
- 9 permits filed
19 permits since 2000: 10 completed, 8 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 154 San Pablo Av | revision to permit#202603127445 to remove water heater replacement.Details
revision to permit#202603127445 to remove water heater replacement. | |
| Mar 25, 2026 | In progress filed Mar 2026, not yet issued | 154 San Pablo Av | construct deck at rear , off ground level and main level. not connected with stairs. approved w signed letters by neighbors.Details
construct deck at rear , off ground level and main level. not connected with stairs. approved w signed letters by neighbors. | $40,000 |
| Mar 25, 2026 | In progress issued Mar 2026 | 154 San Pablo Av | replace 34 windows w/ only 3 changes to size. all others are like for like.Details
replace 34 windows w/ only 3 changes to size. all others are like for like. | $50,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 154 San Pablo Av | renovating 3 bathrooms, creating a half bath,kitchen, updating electrical & cleaning up plumbing during bathroom remodels.Details
renovating 3 bathrooms, creating a half bath,kitchen, updating electrical & cleaning up plumbing during bathroom remodels. | $300,000 |
| Nov 20, 2025 | Completed final sign-off Sep 2026 | 139 Garcia Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). installing gas line. | $100,000 |
| Oct 16, 2025 | Completed final sign-off Oct 2025 | 255 Crestlake Dr | interior remodel of existing s.f.d.: demolition of non loading bearing interior wall. to comply with violation 202544201. new partition walls, minor framing modification to create new door openings & infill existing. no changes to building foot print, height, exterior envelope, egress pathDetails
interior remodel of existing s.f.d.: demolition of non loading bearing interior wall. to comply with violation 202544201. new partition walls, minor framing modification to create new door openings & infill existing. no changes to building foot print, height, exterior envelope, egress path | $15,000 |
| May 5, 2025 | In progress issued May 2025 | 18 30th St | revise/expand the scope of p/a 2025-0205-9731 to include the removal and replacement of (9) front windows with vinyl, single hung. max u-factor 0.30; if <75 sqft glazing replaced max 0.40 u-factor.Details
revise/expand the scope of p/a 2025-0205-9731 to include the removal and replacement of (9) front windows with vinyl, single hung. max u-factor 0.30; if <75 sqft glazing replaced max 0.40 u-factor. | $10,000 |
| Feb 5, 2025 | In progress issued Feb 2025 | 18 30th St | replace 9 front windows in kind. aluminum clad wood on wood clad single hungDetails
replace 9 front windows in kind. aluminum clad wood on wood clad single hung | $10,000 |
| Jan 8, 2025 | In progress issued Jan 2025 | 18 30th St | revision to pa#202308285415. replace 20 windows located in side (8) and back (12)Details
revision to pa#202308285415. replace 20 windows located in side (8) and back (12) | $8,000 |
| Nov 7, 2023 | Completed final sign-off Nov 2024 | 85 Eastwood Dr | remodel (e) kitchen, remodel/reconfigure (e) bath to create new ensuite bath & walk-in closet, remodel/reconfigure (e) hall closet to create new full bath.Details
remodel (e) kitchen, remodel/reconfigure (e) bath to create new ensuite bath & walk-in closet, remodel/reconfigure (e) hall closet to create new full bath. | $85,000 |
| Oct 23, 2023 | Completed final sign-off Nov 2023 | 2407 23rd St | stairway siding to be replaced (facing front toward street) approx 20 sfDetails
stairway siding to be replaced (facing front toward street) approx 20 sf | $500 |
| Aug 28, 2023 | In progress issued Dec 2023 | 18 30th St | repair fire damage per complaint 202304937. return 1st and 2nd floor in kind. rebuilt kitchens & bathrooms. new sheetrock in two units.Details
repair fire damage per complaint 202304937. return 1st and 2nd floor in kind. rebuilt kitchens & bathrooms. new sheetrock in two units. | $100,000 |
| Jan 20, 2023 | Completed final sign-off Aug 2023 | 1056 Page St | interior alteration to e condo. no change in floor area or expansion. add new bathroom. new shower, lavatory, water closet. new closet in primary bedroom. skylight.Details
interior alteration to e condo. no change in floor area or expansion. add new bathroom. new shower, lavatory, water closet. new closet in primary bedroom. skylight. | $50,000 |
| Dec 19, 2022 | Completed final sign-off May 2024 | 3138 Moraga St | revision to permit #202109077888. reduction of scope from (2) bath to (1) bath, double patio door to single door.Details
revision to permit #202109077888. reduction of scope from (2) bath to (1) bath, double patio door to single door. | |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 418 College Av | interior remodeling of a single dwelling house to: add a bathroom and one bedroom @ 1st floor.Details
interior remodeling of a single dwelling house to: add a bathroom and one bedroom @ 1st floor. | $20,000 |
| Dec 13, 2021 | Completed final sign-off Mar 2023 | 166 Springfield Dr | interior alteration to (e)sfd.consist of kitchen remodel,(n)exterior windows & door. new(e) deck at rear yard @ 2nd fl level.height of deck surface is 6'-8" above grade with height of guardrail 10'-2"Details
interior alteration to (e)sfd.consist of kitchen remodel,(n)exterior windows & door. new(e) deck at rear yard @ 2nd fl level.height of deck surface is 6'-8" above grade with height of guardrail 10'-2" | $95,000 |
| Sep 7, 2021 | Completed final sign-off Apr 2024 | 3138 Moraga St | 585 sf of the basement storage area will be converted into a 1 bedroom adu.Details
585 sf of the basement storage area will be converted into a 1 bedroom adu. | $75,000 |
| Nov 10, 2020 | Completed final sign-off Oct 2023 | 595 Buckingham Wy | unit #532: new partition walls, outlets, & modify lighting & hvac to work w/ revised layout. addition of one operators by taking away staff area.Details
unit #532: new partition walls, outlets, & modify lighting & hvac to work w/ revised layout. addition of one operators by taking away staff area. | $10,000 |
| Apr 2, 2019 | Completed final sign-off Sep 2019 | 95 Warren Dr | remodel 1 kitchen and 2 bathroom. no wall to be modified. no alteration of wall, window or door.Details
remodel 1 kitchen and 2 bathroom. no wall to be modified. no alteration of wall, window or door. | $45,000 |