288 permits since 2000: 174 completed, 6 in progress, 64 never finaled, 44 expired or cancelled.
Of the 64 never-finaled permits, 6 are 3 to 5 years old, 13 are 5 to 10 years old, 45 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 288.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 100 Hooper St | 1/fl- install of (n) electronic lab equipment for suite 15. install (n) branch electrical circuits and receptacles. (e) panel to be used.Details
1/fl- install of (n) electronic lab equipment for suite 15. install (n) branch electrical circuits and receptacles. (e) panel to be used. | $58,500 |
| Mar 10, 2026 | In progress issued Mar 2026 | 3838 California St | remove of the existing rooftop generator on the existing equipment pad per ab017Details
remove of the existing rooftop generator on the existing equipment pad per ab017 | $15,000 |
| Oct 24, 2025 | Completed final sign-off Jul 2026 | 2350 Turk Bl | ref ti 202503041492- modernization of (e) electrical distribution of theater . (n) lighting, power devices. replace electrical panels and distributionDetails
ref ti 202503041492- modernization of (e) electrical distribution of theater . (n) lighting, power devices. replace electrical panels and distribution | $510,650 |
| Aug 4, 2025 | Completed final sign-off Nov 2025 | 111 Pine St | deferred electrical for office ti permit 202505307634. floor 18, suite 1815; minor lighting and power upgrades in four offices.Details
deferred electrical for office ti permit 202505307634. floor 18, suite 1815; minor lighting and power upgrades in four offices. | $39,700 |
| Jul 23, 2025 | In progress issued Aug 2025 | 3838 California St | provide/replace emergency lighting to existing high rise building built pre- original non-conforming emergency light provided by natural gas generator that is no longer acceptable.Details
provide/replace emergency lighting to existing high rise building built pre- original non-conforming emergency light provided by natural gas generator that is no longer acceptable. | $120,000 |
| Jul 9, 2025 | In progress issued Jul 2025 | 400 Howard St | 4th floor:modifications to existing fire alarm sytem 80 devices . fire alarm only 2025.0602.7719 202504023527Details
4th floor:modifications to existing fire alarm sytem 80 devices . fire alarm only 2025.0602.7719 202504023527 | $55,000 |
| Jun 23, 2025 | Completed final sign-off Oct 2025 | 111 Pine St | 13th fl suite 1300 & 1305 ref pa # 2025-0509-6192: rewiring/relocating (e) light fixtures affected by new demising wall. adding receptacles for conversion of larger suite to smaller suite ref 202505096192Details
13th fl suite 1300 & 1305 ref pa # 2025-0509-6192: rewiring/relocating (e) light fixtures affected by new demising wall. adding receptacles for conversion of larger suite to smaller suite ref 202505096192 | $39,700 |
| Apr 7, 2025 | Completed final sign-off Jun 2025 | 111 Pine St | minor electrical modifications and lighting additions for stair project for l2 and l3. ref permit pa#202502210874Details
minor electrical modifications and lighting additions for stair project for l2 and l3. ref permit pa#202502210874 | $55,000 |
| Jul 25, 2024 | Completed final sign-off Oct 2024 | 2222 Broadway | lighting upgrades. lighting controls upgrades. power upgrades.Details
lighting upgrades. lighting controls upgrades. power upgrades. | $63,000 |
| Apr 8, 2024 | Completed final sign-off Aug 2024 | 1140 07th St | installl emergency responder radio coverage system.Details
installl emergency responder radio coverage system. | $50,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 111 Pine St | replacement of 2 condenser units on roof. breaker replacement for updated loads. ref 202312202826Details
replacement of 2 condenser units on roof. breaker replacement for updated loads. ref 202312202826 | $28,000 |
| Nov 29, 2023 | In progress issued Jan 2024 | 888 Howard St | installation of power to a tritium rtm75 elecrical vehicle charger.Details
installation of power to a tritium rtm75 elecrical vehicle charger. | $70,000 |
| Aug 25, 2023 | Completed final sign-off Apr 2024 | 1 Market St | install 2 life safety 2 way communication sytem call stations. add to existing system.Details
install 2 life safety 2 way communication sytem call stations. add to existing system. | $20,000 |
| Jul 14, 2023 | Completed final sign-off Mar 2024 | 940 Laguna Honda Bl | power new ada lift and door. power new drinking fountains. lighting modifications. exterior modifications are within private school property and not visible from the street.Details
power new ada lift and door. power new drinking fountains. lighting modifications. exterior modifications are within private school property and not visible from the street. | $24,000 |
| Jun 15, 2023 | Never finaled issued Jun 2023, no final | 1 Dr Carlton B Goodlett Pl | electrical connections for replacement of mechanical heatpumps.Details
electrical connections for replacement of mechanical heatpumps. | $450,000 |
| Apr 27, 2023 | Completed final sign-off Sep 2023 | 2567 Mission St | 1&2/f:furnish and install new lights and lighting controls, new receptacles and poke-thru devices.Details
1&2/f:furnish and install new lights and lighting controls, new receptacles and poke-thru devices. | $179,500 |
| Apr 27, 2023 | Completed final sign-off Sep 2023 | 2567 Mission St | b&3/f:furnish and install new lights and lighting controls, new receptacles and poke-thru devices.Details
b&3/f:furnish and install new lights and lighting controls, new receptacles and poke-thru devices. | $179,500 |
| Apr 11, 2023 | Completed final sign-off Jul 2023 | 1 Market St | 39th flr - furnish and install 2 fire life safety 2-way communication call stations. ref 201605258242.Details
39th flr - furnish and install 2 fire life safety 2-way communication call stations. ref 201605258242. | $23,000 |
| Feb 2, 2023 | Completed final sign-off Aug 2023 | 1 Market St | add 2 way communication cell stations on the 23rd flDetails
add 2 way communication cell stations on the 23rd fl | $21,262 |
| Feb 2, 2023 | Completed final sign-off Aug 2023 | 1 Market St | add 2 way communication station on the 24th flDetails
add 2 way communication station on the 24th fl | $21,262 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 1 Market St | add 2 way communication call station on the 17th flDetails
add 2 way communication call station on the 17th fl | $22,500 |
| Sep 28, 2022 | Never finaled issued Sep 2022, no final | 1 Front St | 8/f: replace all light fixture (1 for 1) with new led. replace all lighting controls to meet t-24 requirements, and re-circuit lighting as necessary.Details
8/f: replace all light fixture (1 for 1) with new led. replace all lighting controls to meet t-24 requirements, and re-circuit lighting as necessary. | $140,000 |
| Sep 28, 2022 | Completed final sign-off Mar 2023 | 1 Front St | 6/f: replace all light fixture (1 for 1) with new led. replace all lighting controls to meet t-24 requirements, and re-circuit lighting as necessary.Details
6/f: replace all light fixture (1 for 1) with new led. replace all lighting controls to meet t-24 requirements, and re-circuit lighting as necessary. | $170,000 |
| Aug 23, 2022 | Completed final sign-off Feb 2024 | 111 Pine St | install emergency responder radio coverage system. (errcs)Details
install emergency responder radio coverage system. (errcs) | $50,000 |
| Aug 16, 2022 | Never finaled issued Aug 2022, no final | 185 Berry St | demo and replacement of boiler equipment on the roof. wharfside bldg. addition of vfds for e pumps in street side bldg, basement , boiler rm. new equip to be reconnected to e mcc. new panels for 120/240 v controls, circulating pumps. arch ref 202206156409Details
demo and replacement of boiler equipment on the roof. wharfside bldg. addition of vfds for e pumps in street side bldg, basement , boiler rm. new equip to be reconnected to e mcc. new panels for 120/240 v controls, circulating pumps. arch ref 202206156409 | $95,000 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 1 Market St | 42nd/fl: install 2 2-way communication cell stationsDetails
42nd/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 22, 2022 | Completed final sign-off Feb 2023 | 1 Market St | 40st/fl: install 2 2-way communication cell stationsDetails
40st/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 1 Market St | 36th/fl: install 2 2-way communication cell stationsDetails
36th/fl: install 2 2-way communication cell stations | $21,525 |
| Jun 17, 2022 | Never finaled issued Jul 2022, no final | 1 De Haro St | revision to pa# 202110210928. scope changes to 1st fl, mezzanine and 2nd flr includes addition of smoke detectors at stair 2 due to addition of door hold open adds.Details
revision to pa# 202110210928. scope changes to 1st fl, mezzanine and 2nd flr includes addition of smoke detectors at stair 2 due to addition of door hold open adds. | $25,000 |
| Apr 27, 2022 | Completed final sign-off Mar 2023 | 111 Pine St | 2nd fl: furnish & install (92) 2x2 fixtures, (8) 4" downlights. 100' core lighting, (3) decorative doom lights.Details
2nd fl: furnish & install (92) 2x2 fixtures, (8) 4" downlights. 100' core lighting, (3) decorative doom lights. | $175,000 |
| Dec 10, 2021 | Completed final sign-off Apr 2022 | 49 South Van Ness Av | landloard improvement to existing parking area with added security, entry & exit stations, and pay stations.Details
landloard improvement to existing parking area with added security, entry & exit stations, and pay stations. | $75,000 |
| Dec 1, 2021 | Never finaled issued Dec 2021, no final | 185 Berry St | new parking valet power and lighting. new lighting at bike room. replace drive aisle fixtures. ref bldg #202107144334Details
new parking valet power and lighting. new lighting at bike room. replace drive aisle fixtures. ref bldg #202107144334 | $105,000 |
| Oct 21, 2021 | Completed final sign-off Jan 2023 | 1 De Haro St | all levels: fire alarm changes due to t.i. new duct smoke dtectors at fan coil units. new notification devices shall be installand powered by (e) and new booster power supplies. ref 202012221573, 202012221574, 202012221578, 202012231605.Details
all levels: fire alarm changes due to t.i. new duct smoke dtectors at fan coil units. new notification devices shall be installand powered by (e) and new booster power supplies. ref 202012221573, 202012221574, 202012221578, 202012231605. | $250,000 |
| Oct 5, 2021 | Never finaled issued Oct 2021, no final | 1 South Van Ness Av | 2/f: add 2 recessed fixtures for interior wall sign. add dimmer switch, connect to existing lighting control time clock.Details
2/f: add 2 recessed fixtures for interior wall sign. add dimmer switch, connect to existing lighting control time clock. | $6,900 |
| Sep 15, 2021 | Completed final sign-off Oct 2023 | 580 Sutter St | eletrical for t.i. 202106172693. upgrade electrical services. new 600 amp main services switch board. 2 100 amp panel boards. 4 225 amp panel boards. 10 led strip linesDetails
eletrical for t.i. 202106172693. upgrade electrical services. new 600 amp main services switch board. 2 100 amp panel boards. 4 225 amp panel boards. 10 led strip lines | $150,000 |
| Jul 19, 2021 | Completed final sign-off Dec 2021 | 1 Dr. Carlton B. Goodlett Pl | replacement of interior lighting on level 4 and colonnade for city hall. surface mounted light fixtures.Details
replacement of interior lighting on level 4 and colonnade for city hall. surface mounted light fixtures. | $200,000 |
| Jul 6, 2021 | Completed final sign-off Sep 2021 | 1100 Ellis St | hvac power upgrades for the floor classrooms.Details
hvac power upgrades for the floor classrooms. | $200,000 |
| Jun 23, 2021 | Never finaled issued Jul 2021, no final | 1400 Minnesota St | furnish and install (12) new lights,install (9)new circuits,install(9)new receiptables.Details
furnish and install (12) new lights,install (9)new circuits,install(9)new receiptables. | $45,000 |
| Jan 22, 2021 | Never finaled issued Feb 2021, no final | 1 Market St | 18/19th floors: addition of 4 new two-way communication call stations. 2 per floor at freight & main elevator lobbies. connect stations to (e) backbones. ref t.i. pa 201912190043 & 201912190040.Details
18/19th floors: addition of 4 new two-way communication call stations. 2 per floor at freight & main elevator lobbies. connect stations to (e) backbones. ref t.i. pa 201912190043 & 201912190040. | $40,000 |
| Jan 21, 2021 | Completed final sign-off Dec 2021 | 4705 03rd St | installation of facade lighting & controls. title 24 compliance.Details
installation of facade lighting & controls. title 24 compliance. | $25,000 |
| Sep 28, 2020 | Never finaled issued Nov 2020, no final | 100 Hooper St | unit #8: addition of lighting below a new mezzanine (201906113160) within an exisitng space. connect new light fixtures to existing panel.Details
unit #8: addition of lighting below a new mezzanine (201906113160) within an exisitng space. connect new light fixtures to existing panel. | $40,000 |
| Jun 30, 2020 | Never finaled issued Sep 2020, no final | 1625 Post St | remove extg elevator feeders. re-install elevator feeders, bypassing elevator load center.Details
remove extg elevator feeders. re-install elevator feeders, bypassing elevator load center. | $50,000 |
| Jun 12, 2020 | Completed final sign-off Oct 2020 | 2620 Jones St | as-built fire alarm permit for previously approved pa#201904057260Details
as-built fire alarm permit for previously approved pa#201904057260 | |
| Jan 21, 2020 | Completed final sign-off Oct 2020 | 1 Market St | steuart tower fls 20, 21, 22: installation of 2-way communicatoin call station at elevator lobbies. connecting them to building existing backbone system.Details
steuart tower fls 20, 21, 22: installation of 2-way communicatoin call station at elevator lobbies. connecting them to building existing backbone system. | $20,000 |
| Nov 18, 2019 | Never finaled issued Nov 2019, no final | 185 Berry St | 1st floor suite #180: install new lighting and receptables for relocated engineering office. work on 1st floor only.Details
1st floor suite #180: install new lighting and receptables for relocated engineering office. work on 1st floor only. | $65,000 |
| Sep 18, 2019 | Never finaled issued Sep 2019, no final | 50 Beale St | add emergency 2-way communication system call stations to new riser to serve future tenants locked elevator lobby locations per cbc 1008.1.9.12 item 5. maher naDetails
add emergency 2-way communication system call stations to new riser to serve future tenants locked elevator lobby locations per cbc 1008.1.9.12 item 5. maher na | $100,000 |
| Aug 28, 2019 | Completed final sign-off Oct 2019 | 1 Market St | install of (3) 2-way communications call stations, connect to (e) backbone. work to occur on 24th floor only.Details
install of (3) 2-way communications call stations, connect to (e) backbone. work to occur on 24th floor only. | $15,000 |
| Jul 1, 2019 | Completed final sign-off Oct 2019 | 1 Market St | installation of 2-way com system in main & freight elevator lobbies or 34th flrDetails
installation of 2-way com system in main & freight elevator lobbies or 34th flr | $17,000 |
| Dec 7, 2018 | Completed final sign-off Mar 2019 | 185 Berry St | as builts for 201710060646 change 1 fuses from 1200a to 900aDetails
as builts for 201710060646 change 1 fuses from 1200a to 900a | $1,000 |
| Oct 31, 2018 | Completed final sign-off Dec 2018 | 1661 Tennessee St | ref pa# 201807245359; add new power & lighting for warehouse space (electrical permit ew201809245874) n/a for maher.Details
ref pa# 201807245359; add new power & lighting for warehouse space (electrical permit ew201809245874) n/a for maher. | $25,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 185 Berry St | install power at 3 new car chargers. electrical drawings only ref pa 2017-0727-3111Details
install power at 3 new car chargers. electrical drawings only ref pa 2017-0727-3111 | $19,500 |
| Mar 2, 2018 | Completed final sign-off Nov 2019 | 1 Dr Carlton B Goodlett Pl | add exterior lights at playground structure and driveway ramp maher naDetails
add exterior lights at playground structure and driveway ramp maher na | $9,250 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 185 Berry St | wharf side building: electrical - restrooms upgrade - replace light fixtures with new in the following restrooms: (1) in 6th fl lobby #1 and (1) in 6th fl lobby #3. ref ti #201705176861. maher naDetails
wharf side building: electrical - restrooms upgrade - replace light fixtures with new in the following restrooms: (1) in 6th fl lobby #1 and (1) in 6th fl lobby #3. ref ti #201705176861. maher na | $35,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 185 Berry St | berry st building: electrical - lighting upgrades for restrooms: (7) restrooms total: level 3 - lobby 4 & lobby 6, level 2 - lobby 4 and lobby 6, level 1 - lobby 2, 4 & 6. ref ti #201705176865. maher naDetails
berry st building: electrical - lighting upgrades for restrooms: (7) restrooms total: level 3 - lobby 4 & lobby 6, level 2 - lobby 4 and lobby 6, level 1 - lobby 2, 4 & 6. ref ti #201705176865. maher na | $115,000 |
| Nov 17, 2017 | Never finaled issued Nov 2017, no final | 1050 Mcallister St | replacement of existing light fixtures on property. install new lighting control panel includes tennis court fixture. for existing community center, park, and tennis court.Details
replacement of existing light fixtures on property. install new lighting control panel includes tennis court fixture. for existing community center, park, and tennis court. | $90,000 |
| Sep 18, 2017 | Never finaled issued Sep 2017, no final | 1563 Mission St | revision to pa#201705187028 add life safety control at all stairwell exits, add new door hardware at all doors in exit egress path of travel.Details
revision to pa#201705187028 add life safety control at all stairwell exits, add new door hardware at all doors in exit egress path of travel. | $15,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2018 | 185 Berry St | suite 1510 installation of 4 2x2 type f6 fixtures, add in switch locations, rough in of 2 teledata outlets. ref app#201706219952 n/a for maherDetails
suite 1510 installation of 4 2x2 type f6 fixtures, add in switch locations, rough in of 2 teledata outlets. ref app#201706219952 n/a for maher | $6,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 2500 16th St | exterior lighting at new dog park maher na ref ti 201408184057Details
exterior lighting at new dog park maher na ref ti 201408184057 | $125,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 2500 16th St | 1st & 2nd flr: lighting & power installation maher na ref ti 201408184035Details
1st & 2nd flr: lighting & power installation maher na ref ti 201408184035 | $300,000 |
| Jan 26, 2017 | Never finaled issued Jan 2017, no final | 3003 03rd St | title 24 only. ref 201612134820 maher not reqDetails
title 24 only. ref 201612134820 maher not req | |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 275 Battery St | relocate (1) light fixture, add power at newly reconfigurated offices (2 total), add title 24 compliance for new office. ref. to pa# 201601066412. n/a ordinance #155-13Details
relocate (1) light fixture, add power at newly reconfigurated offices (2 total), add title 24 compliance for new office. ref. to pa# 201601066412. n/a ordinance #155-13 | $8,000 |
| Sep 1, 2015 | Never finaled issued Sep 2015, no final | 1355 Sansome St | 2nd & 3rd floor ti modifications deleting and adding receptacles and tele/data. ref pa 2015-0609-8453 and 2015-0609-8477Details
2nd & 3rd floor ti modifications deleting and adding receptacles and tele/data. ref pa 2015-0609-8453 and 2015-0609-8477 | $9,000 |
| Aug 21, 2015 | Never finaled issued Aug 2015, no final | 600 Harrison St | 1st flr/suite 130: modification of (e) ti; upgrades, new lighting controls, light fixtures and recptacles. ref pa 2015 0727 2573 maher naDetails
1st flr/suite 130: modification of (e) ti; upgrades, new lighting controls, light fixtures and recptacles. ref pa 2015 0727 2573 maher na | $72,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | classroom upgrades including new light fixtures, lighting control and receptacles, ref 201506249812 er lightingDetails
classroom upgrades including new light fixtures, lighting control and receptacles, ref 201506249812 er lighting | $13,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | classroom upgrades including new light fixtures, lighting control and receptacles, mnor hvac equipment connections ref 201506249820 er exit signs and lighting.Details
classroom upgrades including new light fixtures, lighting control and receptacles, mnor hvac equipment connections ref 201506249820 er exit signs and lighting. | $75,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | classroom upgrades new light fixtures, lighting control and plugs, minor hvac equip connections ref 201506249809 er lightingDetails
classroom upgrades new light fixtures, lighting control and plugs, minor hvac equip connections ref 201506249809 er lighting | $20,000 |
| Jul 10, 2015 | Never finaled issued Jul 2015, no final | 2201 Vallejo St | classroom upgrades including new light fixtures, lighting control and receptacles. minor hvac equip connections er lighting ref pa#201506249771Details
classroom upgrades including new light fixtures, lighting control and receptacles. minor hvac equip connections er lighting ref pa#201506249771 | $30,000 |
| Jun 9, 2015 | Never finaled issued Jun 2015, no final | 600 Harrison St | disconnect existing furniture power in open offices, relocate poke-thru devices for new furniture, add power receptacles to digital lab room. install 9100 13w dimmable recessed downlights and install new lighting control. n/a ordinance #155-13Details
disconnect existing furniture power in open offices, relocate poke-thru devices for new furniture, add power receptacles to digital lab room. install 9100 13w dimmable recessed downlights and install new lighting control. n/a ordinance #155-13 | $40,000 |
| Mar 30, 2015 | Completed final sign-off Aug 2015 | 1 Dr Carlton B Goodlett Pl | replace (e) exterior light fixtures with new at (e) locations with (e) conduit. (e) exterior lights are facade lighting. maher - not req'dDetails
replace (e) exterior light fixtures with new at (e) locations with (e) conduit. (e) exterior lights are facade lighting. maher - not req'd | $820,000 |
| Feb 20, 2015 | Never finaled issued Feb 2015, no final | 888 Brannan St | basement & 1st floor - upgrade lighting in corridors, replace exisitng lights with t-24 led at existing location. ref to pa #2014.1021.9497. no life safety work @ scope of work.Details
basement & 1st floor - upgrade lighting in corridors, replace exisitng lights with t-24 led at existing location. ref to pa #2014.1021.9497. no life safety work @ scope of work. | $272,000 |
| Jan 28, 2015 | Never finaled issued Jan 2015, no final | 1 Maritime Pz | as built fire alarm to pa#201412194096. n/a ordinance #155-13Details
as built fire alarm to pa#201412194096. n/a ordinance #155-13 | |
| Dec 29, 2014 | Completed final sign-off Jan 2015 | 1 Maritime Pz | 1 smoke detector 2 speaker strobes added to exsiting notifier intilligent, addressable ufs2-3030 networked voice system fire alarm per ti 16th refDetails
1 smoke detector 2 speaker strobes added to exsiting notifier intilligent, addressable ufs2-3030 networked voice system fire alarm per ti 16th ref | $5,000 |
| Dec 19, 2014 | Completed final sign-off Feb 2015 | 1 Maritime Pz | 23rd floor: 1 smoke detector, 3 addressable relay modules, 5 speaker/strobes, and 19 strobes added to the (e) nofifier intelligent, addressable, nfs2-3030 fire alarm system. 1 speaker/strobe and 6 strobes relocated and 1 strobe is replaced. ref. t.i.# 2014.1020.9310. maher n/a.Details
23rd floor: 1 smoke detector, 3 addressable relay modules, 5 speaker/strobes, and 19 strobes added to the (e) nofifier intelligent, addressable, nfs2-3030 fire alarm system. 1 speaker/strobe and 6 strobes relocated and 1 strobe is replaced. ref. t.i.# 2014.1020.9310. maher n/a. | $34,000 |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 1 South Van Ness Av | 2nd floor - occupant load verification for change of use assembly from 'b' to 'b & a-3". no work to be performed.maher n/aDetails
2nd floor - occupant load verification for change of use assembly from 'b' to 'b & a-3". no work to be performed.maher n/a | |
| May 23, 2014 | Never finaled issued Jun 2014, no final | 50 Fremont St | on 2nd floor - addition of (7) speaker/strobes to tie into existing power supplies and existing speaker circuits, add (1) duct detector, (1) control relay and (1) pr for ahu, add (1) control relay. t.i. pa#201309096317 & 201404072640. n/a ordinance #155-13Details
on 2nd floor - addition of (7) speaker/strobes to tie into existing power supplies and existing speaker circuits, add (1) duct detector, (1) control relay and (1) pr for ahu, add (1) control relay. t.i. pa#201309096317 & 201404072640. n/a ordinance #155-13 | $7,500 |
| May 23, 2014 | Never finaled issued Jun 2014, no final | 601 California St | install new emergency push to exit button. approval of locks on elevator lobby doors. fa to be submitted under seperate permit, requested by fire inspector francis sperisen.Details
install new emergency push to exit button. approval of locks on elevator lobby doors. fa to be submitted under seperate permit, requested by fire inspector francis sperisen. | $4,500 |
| Apr 22, 2014 | Completed final sign-off Jun 2014 | 1 Maritime Pz | addition of 1 smoke detector and 3 speaker strobes to the existing notifier fire alarm system. relocate 1 existing speaker strobe. ti 201404032340; compliance with ord 155-13 not required.Details
addition of 1 smoke detector and 3 speaker strobes to the existing notifier fire alarm system. relocate 1 existing speaker strobe. ti 201404032340; compliance with ord 155-13 not required. | $3,500 |
| Apr 10, 2014 | Completed final sign-off May 2014 | 425 Market St | 33rd floor:addition of 3 new duct detectors at new fan coil units locations. new devices to be connected to extg loop 2:53 and tied into the fire alarm system. n/a for the maher ordinance #155-13Details
33rd floor:addition of 3 new duct detectors at new fan coil units locations. new devices to be connected to extg loop 2:53 and tied into the fire alarm system. n/a for the maher ordinance #155-13 | $2,000 |
| Mar 14, 2014 | Completed final sign-off Feb 2015 | 201 Alabama St | electrical drawings to be submitted as building alteration to application 201311202436. electrical work including new lighting and power upgrades. compliance with ordinance no 155-13 not required.Details
electrical drawings to be submitted as building alteration to application 201311202436. electrical work including new lighting and power upgrades. compliance with ordinance no 155-13 not required. | $300,000 |
| Mar 10, 2014 | Completed final sign-off May 2014 | 3 Embarcadero Center | fire alarm t.i.: 21st,23rd floors: updated fire alarm as built drawings. ref app#201312244939.Details
fire alarm t.i.: 21st,23rd floors: updated fire alarm as built drawings. ref app#201312244939. | |
| Mar 3, 2014 | Completed final sign-off Apr 2014 | 1 Post St | ground floor:replace extg lobby turnstiles(security) at ground floor and lower level with new security turnstiles.Details
ground floor:replace extg lobby turnstiles(security) at ground floor and lower level with new security turnstiles. | $114,000 |
| Feb 28, 2014 | Completed final sign-off Mar 2014 | 1 Maritime Pz | 7th floor:one extg speaker/strobe will be replaced with new high condela speaker/strobe in same location as part of this small 7th floor tenant improvement project. ref app#201401075694. n/a for the maher ordinance #155-13Details
7th floor:one extg speaker/strobe will be replaced with new high condela speaker/strobe in same location as part of this small 7th floor tenant improvement project. ref app#201401075694. n/a for the maher ordinance #155-13 | $500 |
| Feb 14, 2014 | Never finaled issued Feb 2014, no final | 275 Battery St | building alteration work. electrical only to consist of lighting and power upgrades. ref 201310179582. oridance no 155-13 not required.Details
building alteration work. electrical only to consist of lighting and power upgrades. ref 201310179582. oridance no 155-13 not required. | $160,000 |
| Feb 11, 2014 | Completed final sign-off Mar 2014 | 275 Battery St | 21st floor suite 2100 fire alarm system upgrade to include (1) smoke detector for fsd, (12) strobes, (23) speaker strobes, (8) speakers tied into existing l/s system. ref pa #2013.12.11.3927. compliance with ordinance 155-13 not requiredDetails
21st floor suite 2100 fire alarm system upgrade to include (1) smoke detector for fsd, (12) strobes, (23) speaker strobes, (8) speakers tied into existing l/s system. ref pa #2013.12.11.3927. compliance with ordinance 155-13 not required | $28,000 |
| Feb 11, 2014 | Completed final sign-off Sep 2014 | 555 California St | 52/f common area- fire alarm system upgrade to include (2) smoke detectors, (11) speaker strobes and (4) door holders.Details
52/f common area- fire alarm system upgrade to include (2) smoke detectors, (11) speaker strobes and (4) door holders. | $9,000 |
| Jan 24, 2014 | Completed final sign-off Feb 2014 | 1 Maritime Pz | 16th floor, room 1650- add 1 strobe & 1 speaker to (e) notifier fire alarm system and relocate 1 (e) strobe as part of small 16/f t.i.project. t.i. pa# 201312204720Details
16th floor, room 1650- add 1 strobe & 1 speaker to (e) notifier fire alarm system and relocate 1 (e) strobe as part of small 16/f t.i.project. t.i. pa# 201312204720 | $7,500 |
| Jan 24, 2014 | Never finaled issued Jan 2014, no final | 1 Maritime Pz | as part of asbestos abatement project, remove 18 speaker/strobes, 10 speakers, 3 smoke detectors & 2 duct detectors from (e) notifier, intelligent, addressable notifier nfs2-3030 voice fire alarm system as part of demo project on 16/f. demo pa# 201312023135Details
as part of asbestos abatement project, remove 18 speaker/strobes, 10 speakers, 3 smoke detectors & 2 duct detectors from (e) notifier, intelligent, addressable notifier nfs2-3030 voice fire alarm system as part of demo project on 16/f. demo pa# 201312023135 | $7,500 |
| Jan 24, 2014 | Completed final sign-off Mar 2014 | 1 Maritime Pz | add 2 addressable smoke detectors to (e) notifier intelligent, addressable nfs2-3030 fire alarm system as part of 11/f tenant improvement. t.i. pa# 201306119252. compliance with ordinance #155-13 not required.Details
add 2 addressable smoke detectors to (e) notifier intelligent, addressable nfs2-3030 fire alarm system as part of 11/f tenant improvement. t.i. pa# 201306119252. compliance with ordinance #155-13 not required. | $7,500 |
| Dec 23, 2013 | Never finaled issued Jan 2014, no final | 1 Maritime Pz | one speaker/strobe is being added to the extg notifier alarm system as part of the 12th floor t.i. this is room use change only. no bldg permit.Details
one speaker/strobe is being added to the extg notifier alarm system as part of the 12th floor t.i. this is room use change only. no bldg permit. | $1,500 |
| Dec 23, 2013 | Completed final sign-off Feb 2015 | 2500 16th St | electrical lighting & power upgrade to (e) space. electrical submission only. f.a. submitted under separate permit. reference ti#2013-1121-2519.Details
electrical lighting & power upgrade to (e) space. electrical submission only. f.a. submitted under separate permit. reference ti#2013-1121-2519. | $25,000 |
| Nov 6, 2013 | Completed final sign-off Aug 2015 | 275 Battery St | 24th floor-electrical drawings add to pa# 2013-0910-6433Details
24th floor-electrical drawings add to pa# 2013-0910-6433 | $48,000 |
| Sep 10, 2013 | Completed final sign-off Nov 2013 | 1455 Market St | 17th floor - add 5 speaker/strobes. t.i pa #2013.09.06.6173 under review)Details
17th floor - add 5 speaker/strobes. t.i pa #2013.09.06.6173 under review) | $10,000 |
| Aug 22, 2013 | Never finaled issued Aug 2013, no final | 650 California St | electrical drawings. includes new lights and switches. life safety and plumbing submitted separately. ref 201307111576Details
electrical drawings. includes new lights and switches. life safety and plumbing submitted separately. ref 201307111576 | $25,000 |
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 1455 Market St | 18th floor:8 smoke detectors, 3 duct smoke detectors, 7 modules, 5 speakers, 44 speaker/strobes, 1 booster. ref app#201305217533Details
18th floor:8 smoke detectors, 3 duct smoke detectors, 7 modules, 5 speakers, 44 speaker/strobes, 1 booster. ref app#201305217533 | $35,000 |
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 1455 Market St | 19th floor:4 smoke detectors, 4 duct smoke detectors, 9 modules, 4 speakers, 45 speaker/strobes, 1 booster. ref app#201305217533Details
19th floor:4 smoke detectors, 4 duct smoke detectors, 9 modules, 4 speakers, 45 speaker/strobes, 1 booster. ref app#201305217533 | $35,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 3 Embarcadero Center | 2/f- t.i. for ropes and gray, add new fire alarm devices to be connected to existing bldg. fire alarm system. total devices to be added: 2 strobes and relocate 4. t.i pa# 201306250449Details
2/f- t.i. for ropes and gray, add new fire alarm devices to be connected to existing bldg. fire alarm system. total devices to be added: 2 strobes and relocate 4. t.i pa# 201306250449 | $4,000 |
| Aug 2, 2013 | Completed final sign-off Aug 2013 | 2345 Golden Gate Av | phelan hall 1st & 2nd floor:install 31 horn/strobes, 27 horns, 4 strobes, 11 smoke detectors, 2 control relays, 2 interposing relays. 1 booster supply. 1 synchronization module. all additions are tied into the extg system.Details
phelan hall 1st & 2nd floor:install 31 horn/strobes, 27 horns, 4 strobes, 11 smoke detectors, 2 control relays, 2 interposing relays. 1 booster supply. 1 synchronization module. all additions are tied into the extg system. | $25,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 250 Clay St | 2 horn/strobes are being added and 3 horn/strobes & 1 strobe are being relocated as part of this t.i. project 2013.0517.7216Details
2 horn/strobes are being added and 3 horn/strobes & 1 strobe are being relocated as part of this t.i. project 2013.0517.7216 | $5,700 |
| Jul 29, 2013 | Never finaled issued Jul 2013, no final | 1 Maritime Pz | relocate 2 existing speaker/strobes and 2 existing speakers being added to existing systemDetails
relocate 2 existing speaker/strobes and 2 existing speakers being added to existing system | $7,500 |
| Jul 18, 2013 | Completed final sign-off Feb 2014 | 1111 Gough St | lighting control repairs. add emergency lighting to main floor level. add emergency generator in the basement.Details
lighting control repairs. add emergency lighting to main floor level. add emergency generator in the basement. | $600,000 |