Pacific Weathershield
- Based in
- Santa Clara
- On San Francisco permits
- Apr 2022 to Jul 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2022 | Completed final sign-off Oct 2022 | 460 Ellis St | installing a unistrut racking to facilitate 2 heat pumps at roof. is located at central light well not visible from the public right of way.install 4 new water tanks and one electic water heater in basement.Details
installing a unistrut racking to facilitate 2 heat pumps at roof. is located at central light well not visible from the public right of way.install 4 new water tanks and one electic water heater in basement. | $13,398 |
| Apr 5, 2022 | Completed final sign-off Sep 2022 | 180 Turk St | installing a platform and roofing it in while installing sleepers for equipment on the roof. infill existing skylight opening. roof at rear, not visible from public right of way.Details
installing a platform and roofing it in while installing sleepers for equipment on the roof. infill existing skylight opening. roof at rear, not visible from public right of way. | $13,734 |