Pacific Crest Construction
- Based in
- Mountain View
- On San Francisco permits
- Oct 2008 to Sep 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2010 | Completed final sign-off Dec 2010 | 3620 19th St | demolition of 2 existing walls, non structural and full height cabinet at kitchen. new flooring to match existing. relocation of light switches.Details
demolition of 2 existing walls, non structural and full height cabinet at kitchen. new flooring to match existing. relocation of light switches. | $2,000 |
| Sep 8, 2010 | Completed final sign-off Dec 2010 | 3620 19th St | remove non bearing wall btw kitchen and hallway. replace hardwood fl, drywall, moving wall switch. install 2 ceilinh lights. install 3 electrical recepticalsDetails
remove non bearing wall btw kitchen and hallway. replace hardwood fl, drywall, moving wall switch. install 2 ceilinh lights. install 3 electrical recepticals | $3,000 |
| Sep 3, 2010 | Completed final sign-off Oct 2010 | 29 Oakwood St | unit #16 - replace existing plumbing fixtures w/new plumbing fixtures @ 1st floor; remove tub & shower make into 1 walk-in shower & remove tile floor & replace w/new tile @ 2nd floor.Details
unit #16 - replace existing plumbing fixtures w/new plumbing fixtures @ 1st floor; remove tub & shower make into 1 walk-in shower & remove tile floor & replace w/new tile @ 2nd floor. | $14,000 |
| Oct 24, 2008 | Completed final sign-off Mar 2009 | 3620 19th St | work @ unit# 24 only. demolish existing tub & all existing floor & wall tile. add shower pan. add new blocking for shower pan / curb. add 2nd shower head. install new lavtory sink. install tile back splash in kitchen area.Details
work @ unit# 24 only. demolish existing tub & all existing floor & wall tile. add shower pan. add new blocking for shower pan / curb. add 2nd shower head. install new lavtory sink. install tile back splash in kitchen area. | $18,000 |