Pacific Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2024 to Aug 2026
- Last 24 months
- 12 permits filed
15 permits since 2000: 12 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 437 Pennsylvania Av | replace handrail, waterproofing and tile like to like in the back of the house. replace bottom panels at handrail plywood for laminated glass.Details
replace handrail, waterproofing and tile like to like in the back of the house. replace bottom panels at handrail plywood for laminated glass. | $15,500 |
| Feb 9, 2026 | Completed final sign-off Mar 2026 | 134 Haight St | work at garage level only. bathroom remodel. like for like with new plumbing fixtures. new lights, new fan. new shower pan & paint.Details
work at garage level only. bathroom remodel. like for like with new plumbing fixtures. new lights, new fan. new shower pan & paint. | $20,000 |
| Jan 2, 2026 | Completed final sign-off Apr 2026 | 867 Vermont St | remodeling bathroom like for like. replace lights, exhaust fan, vanity, soak-in bathtub and new shower pan. no removal of wallsDetails
remodeling bathroom like for like. replace lights, exhaust fan, vanity, soak-in bathtub and new shower pan. no removal of walls | $29,890 |
| Jan 2, 2026 | Completed final sign-off Apr 2026 | 2015 Judah St | top floor -upgrade kitchen like to like same layout, upgrade fixtures. upgrade bathroom like to like layout, upgrade fixtures. no removal of wallsDetails
top floor -upgrade kitchen like to like same layout, upgrade fixtures. upgrade bathroom like to like layout, upgrade fixtures. no removal of walls | $35,815 |
| Dec 12, 2025 | Completed final sign-off Jun 2026 | 1237 Clayton St | expansion of (e) closet into garage space. replace (e) two rise steps at rear and propertry line wall. stairs are no more than 30" above grade.Details
expansion of (e) closet into garage space. replace (e) two rise steps at rear and propertry line wall. stairs are no more than 30" above grade. | $15,000 |
| Sep 4, 2025 | Completed final sign-off Feb 2026 | 48 Sharon St | enlarge 1 swing door opening into a large sliding door; bathroom remodeling, upgrade fan, electrical, fxitures and shower pan same layout like to likeDetails
enlarge 1 swing door opening into a large sliding door; bathroom remodeling, upgrade fan, electrical, fxitures and shower pan same layout like to like | $28,960 |
| Jul 11, 2025 | In progress issued Sep 2025 | 300 Yerba Buena Av | reroofing - replace existing shingles and waterproofing in kind. no hot works. no work to (e) roof structural sheathing. ref to 202507110600 (interrior remodel & new skylight)Details
reroofing - replace existing shingles and waterproofing in kind. no hot works. no work to (e) roof structural sheathing. ref to 202507110600 (interrior remodel & new skylight) | $15,000 |
| Jul 11, 2025 | Completed final sign-off Jun 2026 | 300 Yerba Buena Av | remodel 2 bathrooms and 1 kitchen. upgrade electrical wires around work and upgrade panel. replace exhaust frame in bathrooms and kitchen. new skylight, replace skylight (invisible from st)Details
remodel 2 bathrooms and 1 kitchen. upgrade electrical wires around work and upgrade panel. replace exhaust frame in bathrooms and kitchen. new skylight, replace skylight (invisible from st) | $100,000 |
| Jul 7, 2025 | Completed final sign-off Aug 2025 | 683 Edinburgh St | replace exhaust fan. upgrade electrical in bathroom only. replace fiberglass shower door with a new one, like for like.Details
replace exhaust fan. upgrade electrical in bathroom only. replace fiberglass shower door with a new one, like for like. | $20,000 |
| May 14, 2025 | In progress issued May 2025 | 1053 Treat Av | unit 1053b: replace 1 window at the bottom unit. like for like. rear facing.Details
unit 1053b: replace 1 window at the bottom unit. like for like. rear facing. | $1,500 |
| May 13, 2025 | Completed final sign-off Aug 2025 | 1049 Treat Av | replace siding on the south side of building like for like, not visible from street.Details
replace siding on the south side of building like for like, not visible from street. | $75,500 |
| Mar 24, 2025 | Completed final sign-off Sep 2025 | 447 Orizaba Av | replace water heater with new tankless. upgrade main electrical panel 200 amp same location. replace insulation. replace drywall (5/8 gyp-x) half of garage walls and ceiling.(mud, taping, and paint)Details
replace water heater with new tankless. upgrade main electrical panel 200 amp same location. replace insulation. replace drywall (5/8 gyp-x) half of garage walls and ceiling.(mud, taping, and paint) | $18,730 |
| Sep 25, 2024 | Completed final sign-off Jan 2025 | 866 Rhode Island St | bathroom remodeling with new layout. new toilet, bathtub, vanity, walkin shower, new exhaust fan and lights.Details
bathroom remodeling with new layout. new toilet, bathtub, vanity, walkin shower, new exhaust fan and lights. | $50,000 |
| Apr 30, 2024 | Completed final sign-off May 2024 | 1979 45th Av | replace all siding in rear of house in like kind. replace 4 windows in like kind in rear of house. replace 1 exterior door in the back of the house in like kind.Details
replace all siding in rear of house in like kind. replace 4 windows in like kind in rear of house. replace 1 exterior door in the back of the house in like kind. | $55,000 |
| Mar 4, 2024 | Completed final sign-off Mar 2024 | 3744 22nd St | install new plywood, new siding and paint. less than 50%, not to exceed 600 square feet work located at the rear side not facing street. all exterior work.Details
install new plywood, new siding and paint. less than 50%, not to exceed 600 square feet work located at the rear side not facing street. all exterior work. | $34,900 |