Pacific Coast Construction
- Based in
- Daly City
- On San Francisco permits
- Jun 2022 to Nov 2025
- Last 24 months
- 2 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 106 Aptos Av | 1)add new bathroom at 2nd floor. 2) convert 257 sq ft to habitable space at rear of garage.Details
1)add new bathroom at 2nd floor. 2) convert 257 sq ft to habitable space at rear of garage. | $75,000 |
| Jul 29, 2025 | Completed final sign-off Mar 2026 | 3345 22nd St | in-kind bathroom remodel (no change to the floor plan or walls. replace old hvac furnice. no exterior work.Details
in-kind bathroom remodel (no change to the floor plan or walls. replace old hvac furnice. no exterior work. | $25,000 |
| Jun 15, 2022 | Never finaled issued Jun 2022, no final | 638 19th St | unit 15: bathroom remodeling, repairint interior walls. covert bathrub to shower tub, same layout. no layout change, no structral work.Details
unit 15: bathroom remodeling, repairint interior walls. covert bathrub to shower tub, same layout. no layout change, no structral work. | $45,000 |