P H Construction And Painting
- Based in
- Daly City
- On San Francisco permits
- Jan 2006 to Sep 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 30 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 39 Marne Av | replace appr 100 sq ft of damage stucco on south side of the house in kind, and dry-rot repairs as needed (100sqft max), not facing the street.Details
replace appr 100 sq ft of damage stucco on south side of the house in kind, and dry-rot repairs as needed (100sqft max), not facing the street. | $25,000 |
| Jul 14, 2026 | Completed final sign-off Sep 2026 | 32 Melrose Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $28,750 |
| Sep 6, 2024 | Completed final sign-off Nov 2024 | 719 Joost Av | replace 750sf of damage siding in back of the house and replace 6 windows in-kind in back of the house. not visible from street.Details
replace 750sf of damage siding in back of the house and replace 6 windows in-kind in back of the house. not visible from street. | $32,500 |
| Apr 10, 2024 | Completed final sign-off Apr 2024 | 130 Melrose Av | replace 100 sq ft of damage siding in kind at the front bay window above the garageDetails
replace 100 sq ft of damage siding in kind at the front bay window above the garage | $14,500 |
| Nov 28, 2022 | Completed final sign-off Feb 2023 | 2537 Vallejo St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $40,000 |
| Aug 29, 2022 | Completed final sign-off Nov 2022 | 719 Joost Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $30,000 |
| Jan 6, 2022 | Completed final sign-off Mar 2022 | 37 Prospect Av | kitchen remodel: no structural workDetails
kitchen remodel: no structural work | $33,000 |
| Feb 3, 2021 | Completed final sign-off Feb 2021 | 127 Romain St | repair damage small tucco wall in kind on the right side of front stairs.Details
repair damage small tucco wall in kind on the right side of front stairs. | $8,650 |
| May 26, 2020 | Completed final sign-off Aug 2020 | 131 Melrose Av | replace 6 windows in kind with andersen fiberx windows in back of the house and replace 750 sq.ft of siding in back of the house with james hardie fiber cement lap sidingDetails
replace 6 windows in kind with andersen fiberx windows in back of the house and replace 750 sq.ft of siding in back of the house with james hardie fiber cement lap siding | $35,000 |
| Feb 21, 2020 | Completed final sign-off Aug 2020 | 37 Prospect Av | replace aprox 50-feet of lywood under roof overhang and 50 feet of facia. replace aprox 9 sq feet of stucco damage at front of house.Details
replace aprox 50-feet of lywood under roof overhang and 50 feet of facia. replace aprox 9 sq feet of stucco damage at front of house. | $16,500 |
| Sep 18, 2019 | Completed final sign-off Oct 2019 | 127 Romain St | replace approx 150 sq ft of damage siding in back of the house and repair existing deck less than 50%. repair in kind. not visible from the street.Details
replace approx 150 sq ft of damage siding in back of the house and repair existing deck less than 50%. repair in kind. not visible from the street. | $25,000 |
| Sep 9, 2019 | Completed final sign-off Aug 2020 | 131 Melrose Av | remove master bedroom window and replace with a sliding door. install a pre manufactured deck to the rear of the building at master bedroom (n) sliding doorDetails
remove master bedroom window and replace with a sliding door. install a pre manufactured deck to the rear of the building at master bedroom (n) sliding door | $15,000 |
| May 3, 2018 | Completed final sign-off Jun 2018 | 322 Scott St | bathroom remodel - no wall modeficiation,, new fixtures & finishes.Details
bathroom remodel - no wall modeficiation,, new fixtures & finishes. | $18,750 |
| Jan 2, 2018 | Completed final sign-off Feb 2018 | 2535 Vallejo St | guest bathroom remodel. no structural work. fixtures & finishes. no wall modification. n/a for maher.Details
guest bathroom remodel. no structural work. fixtures & finishes. no wall modification. n/a for maher. | $20,000 |
| Oct 16, 2015 | Completed final sign-off Nov 2015 | 620 Joost Av | kitchen cabinet replacement counter top floor coverings, new appliance, electrical & plumbing upgrade.Details
kitchen cabinet replacement counter top floor coverings, new appliance, electrical & plumbing upgrade. | $16,000 |
| Mar 11, 2015 | Completed final sign-off May 2015 | 719 Joost Av | kitchen remodel - no structural workDetails
kitchen remodel - no structural work | $30,000 |
| Sep 2, 2014 | Completed final sign-off Oct 2014 | 131 Melrose Av | bathroom remodel, no structural workDetails
bathroom remodel, no structural work | $12,700 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 119 Melrose Av | kitchen remodel, no structural change.Details
kitchen remodel, no structural change. | $18,000 |
| Jul 19, 2013 | Never finaled issued Jul 2013, no final | 54 Winfield St | kitchen remodel.Details
kitchen remodel. | $20,000 |
| May 30, 2013 | Completed final sign-off Jun 2013 | 126 Justin Dr | additional dry rot repairs to south hall and back of the house approx. 250 sq. ft. replace side and back doors in same openings with steel doors.Details
additional dry rot repairs to south hall and back of the house approx. 250 sq. ft. replace side and back doors in same openings with steel doors. | $10,000 |
| May 2, 2013 | Completed final sign-off Jun 2013 | 126 Justin Dr | dryrot repair in front, sides and back window bay approx. 50 sq.ft. per bay. replace 29 windows in kind wood windows vsiable from street, windows not visable from the street to be replaced with vinyl windows.Details
dryrot repair in front, sides and back window bay approx. 50 sq.ft. per bay. replace 29 windows in kind wood windows vsiable from street, windows not visable from the street to be replaced with vinyl windows. | $18,000 |
| Nov 4, 2011 | Completed final sign-off Feb 2012 | 127 Romain St | master bathroom remodel. no structural work. all (n) lighting must cmply with cec 105 (k) 10Details
master bathroom remodel. no structural work. all (n) lighting must cmply with cec 105 (k) 10 | $15,000 |
| Jun 9, 2011 | Completed final sign-off Jul 2011 | 37 Prospect Av | dry rot repairs in front & restore original appearance of stuccoDetails
dry rot repairs in front & restore original appearance of stucco | $20,000 |
| Sep 27, 2010 | Completed final sign-off Nov 2010 | 1446 45th Av | one bathroom remodel, no structural work, lighting to comply w/cec 150(k)Details
one bathroom remodel, no structural work, lighting to comply w/cec 150(k) | $8,000 |
| Jun 23, 2010 | Completed final sign-off Sep 2010 | 115 Melrose Av | kitchen remodel - no structural work; new lighting comply cec 150 (k)Details
kitchen remodel - no structural work; new lighting comply cec 150 (k) | $10,000 |
| Sep 23, 2008 | Completed final sign-off Feb 2009 | 719 10th Av | kitchen and batroom alteration. new cabinets, countertop,and sink. new vanity and tub/shower.minimum 50 % of kitchen light watt fluorescent provide fluorecscent light for occupancy sensor in bathrroom. new paint and finishes throughout.Details
kitchen and batroom alteration. new cabinets, countertop,and sink. new vanity and tub/shower.minimum 50 % of kitchen light watt fluorescent provide fluorecscent light for occupancy sensor in bathrroom. new paint and finishes throughout. | $20,000 |
| Sep 12, 2008 | Completed final sign-off Nov 2008 | 206 Edna St | no change wall, doors or windows 1 bathroom remodel.Details
no change wall, doors or windows 1 bathroom remodel. | $10,000 |
| Mar 30, 2007 | Completed final sign-off Dec 2007 | 160 23rd Av | remodel of kitchen & bathroom in house keeping unit. no structural change. kitchen: at least 50% lighting wattage must be fluorescent. bathoorm: fluorescent or controlled by motion sensor. no window replacement.Details
remodel of kitchen & bathroom in house keeping unit. no structural change. kitchen: at least 50% lighting wattage must be fluorescent. bathoorm: fluorescent or controlled by motion sensor. no window replacement. | $40,000 |
| Mar 8, 2007 | Completed final sign-off Dec 2007 | 160 23rd Av | two kitchen and two bathrooms remodel. no structural work. min 50% of kitchen light wattage shall be flourescent. flourescent or occupany sensor in bathroom.Details
two kitchen and two bathrooms remodel. no structural work. min 50% of kitchen light wattage shall be flourescent. flourescent or occupany sensor in bathroom. | $10,000 |
| Jun 19, 2006 | Completed final sign-off Jul 2006 | 219 Edna St | kitchen remodel-no structural-counters, cabinets, flooring, walls, counters, fixtures. install 4 replacement windows-visible from street.Details
kitchen remodel-no structural-counters, cabinets, flooring, walls, counters, fixtures. install 4 replacement windows-visible from street. | $18,000 |
| Mar 9, 2006 | Completed final sign-off Jul 2006 | 710 Page St | kitchen renovation unit 710 no change to partion or add blocking for sink in #(708) no exterior windows.Details
kitchen renovation unit 710 no change to partion or add blocking for sink in #(708) no exterior windows. | $40,000 |
| Jan 17, 2006 | Completed final sign-off Mar 2014 | 708 Page St | two kitchens & two bathrooms remodelingDetails
two kitchens & two bathrooms remodeling | $12,000 |