Owr Mechanical Dba Monarch Mechanical
- Based in
- Rio Vista
- On San Francisco permits
- Dec 2013 to Aug 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2015 | Completed final sign-off Oct 2015 | 888 Turk St | as per request for information #80 monarch mechanical will delete (eliminate) 2 fire smoke dampers on m2.1a. ref pa 2015-0417-3886 and 201508285495Details
as per request for information #80 monarch mechanical will delete (eliminate) 2 fire smoke dampers on m2.1a. ref pa 2015-0417-3886 and 201508285495 | |
| Jun 16, 2015 | Never finaled issued Jul 2015, no final | 128 King St | modification to existing ductwork, furnish and install new hydronic fan coil unit. n/a maher ordinanceDetails
modification to existing ductwork, furnish and install new hydronic fan coil unit. n/a maher ordinance | $76,000 |
| Apr 17, 2015 | Completed final sign-off Aug 2015 | 888 Turk St | revise ductwork, no new floor/root opening, with permit 201502138311, use change 201406208993.Details
revise ductwork, no new floor/root opening, with permit 201502138311, use change 201406208993. | |
| Feb 13, 2015 | Completed final sign-off Aug 2015 | 930 Gough St | installation of new hvac to include duct, units, controls,supply fans, exhaust fans, mechanical fire stopping, heat pumps, and final air balance. ref app#201406208999Details
installation of new hvac to include duct, units, controls,supply fans, exhaust fans, mechanical fire stopping, heat pumps, and final air balance. ref app#201406208999 | $335,300 |
| Dec 26, 2013 | Never finaled issued Jun 2015, no final | 401 Duboce Av | new mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n).Details
new mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n). | $124,000 |