Owens Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Jan 2025
- Last 24 months
- 1 permit filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2025 | Completed final sign-off Jan 2025 | 31 Coleridge St | to obtain final inspection for work approved under 202110291484. all work is completeDetails
to obtain final inspection for work approved under 202110291484. all work is complete | |
| Mar 27, 2024 | Completed final sign-off Jan 2025 | 31 Coleridge St | to obtain final inspection for work approved under pa# 2021-1115-2369, and 2021-1001-9624. all work is complete.Details
to obtain final inspection for work approved under pa# 2021-1115-2369, and 2021-1001-9624. all work is complete. | |
| Mar 27, 2024 | Completed final sign-off Jan 2025 | 31 Coleridge St | to obtain final inspection for work approved under pa# 2021-0903-7839 and 2021-0817-6534. all work is complete.Details
to obtain final inspection for work approved under pa# 2021-0903-7839 and 2021-0817-6534. all work is complete. | |
| Dec 30, 2022 | Completed final sign-off Oct 2025 | 31 Coleridge St | revision to 202109077839 to comply with planning case 2021-010118enf, legalize widening garage door to 7'6, new brick planter, widen driveway, paint gate,facade stucco, work at site wall. legalize widening of garage dr to 7'6, brick planter widen drive way paint gate.Details
revision to 202109077839 to comply with planning case 2021-010118enf, legalize widening garage door to 7'6, new brick planter, widen driveway, paint gate,facade stucco, work at site wall. legalize widening of garage dr to 7'6, brick planter widen drive way paint gate. | $1,500 |
| Oct 4, 2022 | Completed final sign-off Mar 2023 | 446 27th St | in kind window replacement (18) in total. (6) windows @ front not on this proposal. no visible windows from the street.Details
in kind window replacement (18) in total. (6) windows @ front not on this proposal. no visible windows from the street. | $20,000 |
| Oct 19, 2021 | Completed final sign-off Oct 2025 | 31 Coleridge St | restoration of rear shed in response to nov 202182671/202182672: new front facade and sistering of existing framing. fnd workDetails
restoration of rear shed in response to nov 202182671/202182672: new front facade and sistering of existing framing. fnd work | $50,000 |
| Nov 14, 2017 | Completed final sign-off May 2018 | 47 Casa Wy | remodel 2 (e) bathrooms in-kind. 2shower pans to be installed. new tile, floor and shower walls.Details
remodel 2 (e) bathrooms in-kind. 2shower pans to be installed. new tile, floor and shower walls. | $15,000 |
| Jul 24, 2017 | Completed final sign-off Oct 2017 | 208 Kenwood Wy | replace 2 windows in the front façade with marvin wood interior aluminum clad exterior to match existing in size and shape. repair replace dryrot damage surrounding windows visible to the street.Details
replace 2 windows in the front façade with marvin wood interior aluminum clad exterior to match existing in size and shape. repair replace dryrot damage surrounding windows visible to the street. | $8,000 |
| Jun 29, 2017 | Completed final sign-off Jan 2018 | 3009 Webster St | per field inspector: rev. to pa#201609127396 change of room occupancy from office to cellar on 1/f. remove (e) gate from scope which was included on pa#201611303754.Details
per field inspector: rev. to pa#201609127396 change of room occupancy from office to cellar on 1/f. remove (e) gate from scope which was included on pa#201611303754. | |
| Jun 14, 2017 | Completed final sign-off Oct 2017 | 208 Kenwood Wy | replace 250 sq ft roofing membrane beneath tile roofing. open up stucco facade to migitate water intrusion. replace damaged materials, replace stucco to match existing.Details
replace 250 sq ft roofing membrane beneath tile roofing. open up stucco facade to migitate water intrusion. replace damaged materials, replace stucco to match existing. | $8,000 |
| May 2, 2017 | Completed final sign-off May 2017 | 47 Casa Wy | partial bolt down of garage foundation 24 ft in length w/ 5/8" x 7" embedoment.Details
partial bolt down of garage foundation 24 ft in length w/ 5/8" x 7" embedoment. | $2,000 |
| Dec 30, 2016 | Completed final sign-off Jan 2018 | 4049 25th St | kitchen & 2 bathroom remodel, remove new load bearing wall.Details
kitchen & 2 bathroom remodel, remove new load bearing wall. | $75,000 |
| Nov 30, 2016 | Completed final sign-off Jan 2018 | 3009 Webster St | revision to 201609127396: addition of 1 window facade. creation of den on 1st fl. facade upgradeDetails
revision to 201609127396: addition of 1 window facade. creation of den on 1st fl. facade upgrade | $20,000 |
| Sep 12, 2016 | Completed final sign-off Aug 2021 | 3009 Webster St | interior remodel - relocate corridor & office & create laundry/storage on 1st floor; adding/changing windows on rear on both levels; infill floor at rear 2nd floor to create master bedroom. n/a maher ordinanceDetails
interior remodel - relocate corridor & office & create laundry/storage on 1st floor; adding/changing windows on rear on both levels; infill floor at rear 2nd floor to create master bedroom. n/a maher ordinance | $200,000 |
| Jul 11, 2016 | Completed final sign-off Nov 2016 | 3009 Webster St | exploratory demo, remove wall covering. remove flooring and slab approx. 700 sq. ft. wall covering removal. all work is non-structural - no walal/floor removal.Details
exploratory demo, remove wall covering. remove flooring and slab approx. 700 sq. ft. wall covering removal. all work is non-structural - no walal/floor removal. | $7,500 |
| May 12, 2016 | Completed final sign-off Aug 2016 | 49 Casa Wy | replace (5) windows on rear of bldg. replace dry rot siding. window can not be seen from street. revision 2 201693191677; n/a maher ord 155-13Details
replace (5) windows on rear of bldg. replace dry rot siding. window can not be seen from street. revision 2 201693191677; n/a maher ord 155-13 | $7,000 |
| Mar 10, 2016 | Completed final sign-off Aug 2016 | 49 Casa Wy | replace 6 windows facing the backyard w/marvin casement windows. windows cannot be seen from street. n/a maher ordinanceDetails
replace 6 windows facing the backyard w/marvin casement windows. windows cannot be seen from street. n/a maher ordinance | $9,000 |
| Jun 26, 2015 | Completed final sign-off Mar 2017 | 180 Idora Av | revision to 201405135599. add/extend 2 (e) bedrooms, build deck abovve bedroom. add circular stairs & wooden stairs from 1/f to ground. remodel partial bedrooms & dining room.Details
revision to 201405135599. add/extend 2 (e) bedrooms, build deck abovve bedroom. add circular stairs & wooden stairs from 1/f to ground. remodel partial bedrooms & dining room. | $150,000 |