Oscar Hoyos Construction
- Based in
- Richmond
- On San Francisco permits
- Jul 2010 to Mar 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 35 Zampa Ln | unit 5 - remove bath tub lto convert it to a shower; replace tiles on walls and install (n) floor ceramic tiles; replace toilet and vanity & lsink. install new shower pan; to comply with cec150.0(k)5Details
unit 5 - remove bath tub lto convert it to a shower; replace tiles on walls and install (n) floor ceramic tiles; replace toilet and vanity & lsink. install new shower pan; to comply with cec150.0(k)5 | $10,000 |
| Jul 28, 2010 | Completed final sign-off Aug 2010 | 908 Corbett Av | comply with nov 201053739, replace (e) sliding glass door and 1 (e)window. remodel 1 bath, no wall changes, unit #2Details
comply with nov 201053739, replace (e) sliding glass door and 1 (e)window. remodel 1 bath, no wall changes, unit #2 | $3,000 |