Oriental Construction & Metal Corp.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Jun 2013
- Last 24 months
- 0 permits filed
26 permits since 2000: 24 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2013 | Completed final sign-off Jun 2013 | 1526 La Playa | to comply with his nov #201306201 dated 5/24/2013: alterations made to staircase will not exceed changes to 50% of staircase (repair in kind). rotten wood at front of staircase to be replaced.Details
to comply with his nov #201306201 dated 5/24/2013: alterations made to staircase will not exceed changes to 50% of staircase (repair in kind). rotten wood at front of staircase to be replaced. | $1,100 |
| Nov 16, 2012 | Completed final sign-off Aug 2019 | 10 De Soto St | remodeling of (e) interior, 1st floor design kitchen provide opening to dining room and nook. 2nd floor remodel (e) bathroom, provide new master bathroom adjacent to master bedroom when completed this floor is to have 3 bedrooms & 2 baths, provide storage in basementDetails
remodeling of (e) interior, 1st floor design kitchen provide opening to dining room and nook. 2nd floor remodel (e) bathroom, provide new master bathroom adjacent to master bedroom when completed this floor is to have 3 bedrooms & 2 baths, provide storage in basement | $33,000 |
| Dec 23, 2011 | Completed final sign-off Jun 2012 | 264 Dalewood Wy | remodel kitchen at 2nd floor, enchange 3 windows, not visible from the street. replace kitchen windodw, no structural work, u-factorDetails
remodel kitchen at 2nd floor, enchange 3 windows, not visible from the street. replace kitchen windodw, no structural work, u-factor | $12,500 |
| Oct 31, 2011 | Never finaled issued Oct 2011, no final | 254 26th Av | repair stairs - less than 50%. repair in kind (damaged wood in stairs replaced) not visible from street.Details
repair stairs - less than 50%. repair in kind (damaged wood in stairs replaced) not visible from street. | $3,000 |
| Jul 20, 2011 | Completed final sign-off Feb 2012 | 94 Judah St | accessibility upgrade of ext restaurant.upgrade of e restaurant.raise floor for dining area.Details
accessibility upgrade of ext restaurant.upgrade of e restaurant.raise floor for dining area. | $42,000 |
| Jun 30, 2011 | Completed final sign-off Feb 2012 | 1967 30th Av | repair stairs - less than 50%. repair in kind.Details
repair stairs - less than 50%. repair in kind. | $2,000 |
| May 26, 2010 | Completed final sign-off Oct 2010 | 355 Valdez Av | fix front & rear exterior wall, about 400 sq ftno structural work and repair in kindDetails
fix front & rear exterior wall, about 400 sq ftno structural work and repair in kind | $2,000 |
| May 26, 2010 | Completed final sign-off Oct 2010 | 355 Valdez Av | add 1 family room, 1 bedroom, 1 full bathroom, 1 laundry room, legalize 1 bedroom on (e) ground floor. add 1 full bathroom, remodel (e) kitchen & bathroom on 2nd floor per planDetails
add 1 family room, 1 bedroom, 1 full bathroom, 1 laundry room, legalize 1 bedroom on (e) ground floor. add 1 full bathroom, remodel (e) kitchen & bathroom on 2nd floor per plan | $58,000 |
| Jun 20, 2008 | Completed final sign-off Jul 2008 | 850 Holloway Av | stucco replacement 40'x10' side of building. replace in kind.Details
stucco replacement 40'x10' side of building. replace in kind. | $5,000 |
| Mar 10, 2008 | Completed final sign-off Jun 2008 | 921 Cabrillo St | repair (e) rear deck, less than 50%. repairs in kind.Details
repair (e) rear deck, less than 50%. repairs in kind. | $900 |
| Feb 21, 2008 | Completed final sign-off May 2008 | 344 Pacheco St | new 1 bathroom on ground floor.Details
new 1 bathroom on ground floor. | $8,500 |
| Nov 2, 2007 | Completed final sign-off Feb 2008 | 2590 47th Av | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $7,000 |
| Aug 27, 2007 | Completed final sign-off Oct 2007 | 538 Valencia St | replace existing damaged rear stairs (2nd egress) in kind per plan.Details
replace existing damaged rear stairs (2nd egress) in kind per plan. | $5,000 |
| Jul 26, 2007 | Completed final sign-off Aug 2007 | 4433 Anza St | replace rotten wood less than 50% of stair in rear of building. stepping only.Details
replace rotten wood less than 50% of stair in rear of building. stepping only. | $700 |
| Jul 24, 2007 | Completed final sign-off Dec 2007 | 843 Avalon Av | add two bedroom, one full bath, one laundry and storage in ground floor per plan.Details
add two bedroom, one full bath, one laundry and storage in ground floor per plan. | $20,000 |
| Jun 22, 2007 | Completed final sign-off Sep 2007 | 344 Pacheco St | fix front stairs (less than 50%)Details
fix front stairs (less than 50%) | $1,500 |
| Dec 22, 2006 | Completed final sign-off Aug 2009 | 344 Pacheco St | horizontal addition of single family dwellingDetails
horizontal addition of single family dwelling | $150,000 |
| Nov 20, 2006 | Expired or cancelled expired Jul 2007 | 344 Pacheco St | legalize basement with laundry room and storage area with new window.Details
legalize basement with laundry room and storage area with new window. | $7,000 |
| Nov 3, 2006 | Completed final sign-off Feb 2007 | 344 Pacheco St | comply nov 200680727.3 bedrooms,living room and dining room old dry wall. replace & install insulation and new electrical.replace gas fireplace in livingroom.replace basement stairs.only studs in back wall of garage floor needs replacing.Details
comply nov 200680727.3 bedrooms,living room and dining room old dry wall. replace & install insulation and new electrical.replace gas fireplace in livingroom.replace basement stairs.only studs in back wall of garage floor needs replacing. | $20,000 |
| Oct 2, 2006 | Completed final sign-off Sep 2007 | 344 Pacheco St | fix stucco wall. 50 sq. ft. approx. at front & side in kind.Details
fix stucco wall. 50 sq. ft. approx. at front & side in kind. | $2,000 |
| Jun 20, 2006 | Completed final sign-off Oct 2006 | 930 Holloway Av | to add one playroom, one bedroom, one full bathroom & one laundry room/utility room, on existing ground floorDetails
to add one playroom, one bedroom, one full bathroom & one laundry room/utility room, on existing ground floor | $18,000 |
| Jun 20, 2006 | Completed final sign-off Oct 2006 | 930 Holloway Av | install 1 new window at rear home.Details
install 1 new window at rear home. | $400 |
| Jun 6, 2006 | Completed final sign-off Oct 2006 | 930 Holloway Av | all the old walls insulation new drywalls. revision to 200604269980. ceilings/walls & insulation @ 3 bedrooms, dining room, living room & hallway.Details
all the old walls insulation new drywalls. revision to 200604269980. ceilings/walls & insulation @ 3 bedrooms, dining room, living room & hallway. | $10,000 |
| May 10, 2006 | Completed final sign-off Oct 2006 | 930 Holloway Av | wood windows in front rid pattern all upper sash to be maintained. vinyl windows for side not visible from street.Details
wood windows in front rid pattern all upper sash to be maintained. vinyl windows for side not visible from street. | $20,000 |
| Apr 26, 2006 | Completed final sign-off Oct 2006 | 930 Holloway Av | remodel kitchen & bathroom. upgrade electrical panel wiring. (existing no change to partition or windows)Details
remodel kitchen & bathroom. upgrade electrical panel wiring. (existing no change to partition or windows) | $13,000 |
| Apr 12, 2005 | Completed final sign-off Aug 2005 | 72 Merced Av | add 1 bedroom,1 playroom,1 full bath,1 storage on (e)g/f.add 2 full bath on (e)3/f.alter (e)2/f 3/fDetails
add 1 bedroom,1 playroom,1 full bath,1 storage on (e)g/f.add 2 full bath on (e)3/f.alter (e)2/f 3/f | $26,000 |