Ore-Con
- Based in
- Martinez
- On San Francisco permits
- Dec 2011 to Sep 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2025 | Completed final sign-off Jan 2026 | 1327 Columbus Av | (e) retail to (n) cafe to include divider wall between cafe and animal (bunny area) , (n) 2x floor sinks in the cafe bar, (n) 120v only outlets. and counter top. mep included.Details
(e) retail to (n) cafe to include divider wall between cafe and animal (bunny area) , (n) 2x floor sinks in the cafe bar, (n) 120v only outlets. and counter top. mep included. | $30,000 |
| Jan 19, 2024 | In progress issued Aug 2024 | 1288 Howard St | space 4: convert vacant commercial space to a full service restaurant. mep deferred.Details
space 4: convert vacant commercial space to a full service restaurant. mep deferred. | $200,000 |
| Sep 3, 2019 | Completed final sign-off Jun 2021 | 918 Noe St | revision to app#201905100352. beam repair at 1st floor(ground level)Details
revision to app#201905100352. beam repair at 1st floor(ground level) | $7,500 |
| Aug 20, 2019 | Completed final sign-off May 2021 | 918 Noe St | repair existing rear deck & stairs, less than 50% in-kind workDetails
repair existing rear deck & stairs, less than 50% in-kind work | $2,000 |
| May 10, 2019 | Completed final sign-off Jun 2021 | 918 Noe St | kitchen bedrms, bathrms, alterations; new masterbath; windows replacement. no change to bld footprint, ht or facade. upgrade electrical service. to comply w/nov 201952822.Details
kitchen bedrms, bathrms, alterations; new masterbath; windows replacement. no change to bld footprint, ht or facade. upgrade electrical service. to comply w/nov 201952822. | $50,000 |
| Dec 5, 2011 | Completed final sign-off Feb 2012 | 578 08th Av | install new tile in bath shower, floor & walls, install 3- 20 amp circuits for kitchen counter, relocate kitchen sink & add a wet bar sink to comply with nov #201173873, 201173874 & 20117383. kitchen lighting per cec 150(k)8 & bathroom lighting per cec150(k)10.Details
install new tile in bath shower, floor & walls, install 3- 20 amp circuits for kitchen counter, relocate kitchen sink & add a wet bar sink to comply with nov #201173873, 201173874 & 20117383. kitchen lighting per cec 150(k)8 & bathroom lighting per cec150(k)10. | $5,000 |