Permit GraphShortlistSan Francisco building permits since 2000

Onsite Construx

Contractor license
905588
State license record
Based in
Half Moon Bay
On San Francisco permits
Jul 2008 to Jun 2023
Last 24 months
0 permits filed

9 permits since 2000: 9 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllKitchen remodel 2Bathroom remodel 2
FiledOutcomeAddressWork described on the permitDeclared cost
Jun 12, 2023Completed
final sign-off May 2025
1245 04th Stdeferred mep for permit 202302131874
Details
Permit
202306129890
Status
complete
Filed
Jun 12, 2023
Permit issued
Aug 30, 2023
Final sign-off
May 14, 2025
Declared cost
$187,488
Address
1245 04th St

deferred mep for permit 202302131874

Open the permit page

$187,488
Feb 13, 2023Completed
final sign-off May 2025
1245 04th Sttenant improvement. adding children's restroom and kitchenette. establishing e occupancy in vacant retail suite. mep deferred.
Details
Permit
202302131874
Status
complete
Filed
Feb 13, 2023
Permit issued
Aug 30, 2023
Final sign-off
May 14, 2025
Declared cost
$180,000
Address
1245 04th St

tenant improvement. adding children's restroom and kitchenette. establishing e occupancy in vacant retail suite. mep deferred.

Open the permit page

$180,000
Nov 18, 2016Completed
final sign-off May 2017
1216 Sanchez Streframe back dining west & south wall due to dry rot damage & fix/replace siding around windows/door; revision to building permit 201610039428
Details
Permit
201611183163
Status
complete
Filed
Nov 18, 2016
Permit issued
Nov 18, 2016
Final sign-off
May 17, 2017
Declared cost
$1,500
Address
1216 Sanchez St

reframe back dining west & south wall due to dry rot damage & fix/replace siding around windows/door; revision to building permit 201610039428

Open the permit page

$1,500
Oct 3, 2016Completed
final sign-off May 2017
1216 Sanchez Streframe back dining area north wall in kind due to dry rot damage. revision to building permit # 201607223056. center window. additional work to permit #201607223056.
Details
Permit
201610039428
Status
complete
Filed
Oct 3, 2016
Permit issued
Oct 3, 2016
Final sign-off
May 17, 2017
Declared cost
$1,000
Address
1216 Sanchez St

reframe back dining area north wall in kind due to dry rot damage. revision to building permit # 201607223056. center window. additional work to permit #201607223056.

Open the permit page

$1,000
Sep 21, 2016Completed
final sign-off Sep 2017
129 Acadia Stcreating a separate study room in a n (e) living room area and adding a powder room where the coat closet currently is
Details
Permit
201609218317
Status
complete
Filed
Sep 21, 2016
Permit issued
Sep 21, 2016
Final sign-off
Sep 5, 2017
Declared cost
$8,000
Address
129 Acadia St

creating a separate study room in a n (e) living room area and adding a powder room where the coat closet currently is

Open the permit page

$8,000
Sep 16, 2016Completed
final sign-off May 2017
1216 Sanchez Streplace all windows - revision to permit application no. 201607223056 - front exterior being wood hung alumimum clad with og lugs within the existing openings. windows to be replaced in-like-kind.
Details
Permit
201609168026
Status
complete
Filed
Sep 16, 2016
Permit issued
Sep 30, 2016
Final sign-off
May 17, 2017
Declared cost
$15,000
Address
1216 Sanchez St

replace all windows - revision to permit application no. 201607223056 - front exterior being wood hung alumimum clad with og lugs within the existing openings. windows to be replaced in-like-kind.

Open the permit page

$15,000
Jul 22, 2016Completed
final sign-off May 2017
1216 Sanchez Stbasement - new electrical, add shear wall; level one - remodel kitchen, add powder, new elec, relocate washer; level two - remodel kitchen, bath, add powder, new elect, relocate washer
Details
Permit
201607223056
Status
complete
Filed
Jul 22, 2016
Permit issued
Jul 22, 2016
Final sign-off
May 17, 2017
Declared cost
$30,000
Address
1216 Sanchez St

basement - new electrical, add shear wall; level one - remodel kitchen, add powder, new elec, relocate washer; level two - remodel kitchen, bath, add powder, new elect, relocate washer

Open the permit page

$30,000
Dec 27, 2013Completed
final sign-off Jun 2014
2534 31st Avremove extg closet wall to expand master bathroom. demolish master bath interior finishes and install all new fixture and tile.
Details
Permit
201312275169
Status
complete
Filed
Dec 27, 2013
Permit issued
Dec 27, 2013
Final sign-off
Jun 2, 2014
Declared cost
$4,500
Address
2534 31st Av

remove extg closet wall to expand master bathroom. demolish master bath interior finishes and install all new fixture and tile.

Open the permit page

$4,500
Jul 18, 2008Completed
final sign-off Oct 2008
15 Entrada Ctwest side elevation cut down existing wall to 14", install 28" wrought iron rail, 15% dry rot on balcony will be replaced, water proof membrane and 4" concrete install.
Details
Permit
200807187080
Status
complete
Filed
Jul 18, 2008
Permit issued
Jul 18, 2008
Final sign-off
Oct 21, 2008
Declared cost
$6,745
Address
15 Entrada Ct

west side elevation cut down existing wall to 14", install 28" wrought iron rail, 15% dry rot on balcony will be replaced, water proof membrane and 4" concrete install.

Open the permit page

$6,745