On Time On Budget, Inc.
- Based in
- La Honda
- On San Francisco permits
- Mar 2007 to May 2010
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2010 | Completed final sign-off Aug 2010 | 101 Lombard St | kitchen remodel to include closing an opening from hallway to kitchen, remove upper half of wall between dining room and kitchen. close doorway between inner hall and kitchen. replace cabinets, counters, appliances, sink, waste disposal, faucet.Details
kitchen remodel to include closing an opening from hallway to kitchen, remove upper half of wall between dining room and kitchen. close doorway between inner hall and kitchen. replace cabinets, counters, appliances, sink, waste disposal, faucet. | $35,000 |
| Mar 23, 2009 | Expired or cancelled expired Oct 2010 | 101 Lombard St | kitchen remodel, replace cabinets, appliances, sink & faucet and kitchen floor.Details
kitchen remodel, replace cabinets, appliances, sink & faucet and kitchen floor. | $32,000 |
| Mar 18, 2009 | Completed final sign-off Mar 2009 | 1914 Fillmore St | revision to appl #200810144162 - original plans said building has fire alram and sprinklers. this corrects that to state no alarm and sprinkelr.Details
revision to appl #200810144162 - original plans said building has fire alram and sprinklers. this corrects that to state no alarm and sprinkelr. | |
| Jan 30, 2009 | Completed final sign-off Mar 2009 | 1914 Fillmore St | revision to 2008/1014/4162 - widen hallway for ada bathroom door at ground floor per plan.Details
revision to 2008/1014/4162 - widen hallway for ada bathroom door at ground floor per plan. | $200 |
| Oct 14, 2008 | Completed final sign-off Mar 2009 | 1914 Fillmore St | remodel existing restaurant space for a new restaurant. minor wall relocation, ada bathroom, restaurant fixtures and equipment as indicated, move interior stairway, add new window at storefront.foundation works.Details
remodel existing restaurant space for a new restaurant. minor wall relocation, ada bathroom, restaurant fixtures and equipment as indicated, move interior stairway, add new window at storefront.foundation works. | $150,000 |
| Sep 30, 2008 | Completed final sign-off Mar 2009 | 1914 Fillmore St | termite / dryrot repair at plate & sutds on exterior wall. approx 15'. include 5/8" bolts & studs. work in restaurant space. foundation.Details
termite / dryrot repair at plate & sutds on exterior wall. approx 15'. include 5/8" bolts & studs. work in restaurant space. foundation. | $1,000 |
| Aug 7, 2007 | Completed final sign-off Sep 2007 | 3640 17th St | replace 7 non front facing windows in kind. 0.67 u factor minimum.Details
replace 7 non front facing windows in kind. 0.67 u factor minimum. | $3,000 |
| Mar 12, 2007 | Completed final sign-off Sep 2007 | 3640 17th St | interior remodel repair old plumb and elec. renew kitchen and bath. repair and relocate partitions and finishes.Details
interior remodel repair old plumb and elec. renew kitchen and bath. repair and relocate partitions and finishes. | $25,000 |