On Square Corporation
- Based in
- Daly City
- On San Francisco permits
- Mar 2023 to Sep 2026
- Last 24 months
- 12 permits filed
14 permits since 2000: 7 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | Completed final sign-off Sep 2026 | 3270 20th St | in kind repairs to less than 50% of existing deck and stairs per sb-326 and sf-604 inspection reports to replace rotten wood. common areas for condo building - not visible from street.Details
in kind repairs to less than 50% of existing deck and stairs per sb-326 and sf-604 inspection reports to replace rotten wood. common areas for condo building - not visible from street. | $5,824 |
| Aug 21, 2026 | In progress issued Aug 2026 | 927 Vallejo St | revision to pa 202607165134 follwing on-site inspection with sfdbi, revision to footing detail, staircase landings, and shear design, to accomodate actual site conditionsDetails
revision to pa 202607165134 follwing on-site inspection with sfdbi, revision to footing detail, staircase landings, and shear design, to accomodate actual site conditions | |
| Jul 16, 2026 | In progress issued Jul 2026 | 927 Vallejo St | demolish existing back stairs/secondary egress and build new back stairs/secondary egress to comply with nov complaint 202657906 and nov 201711592 (not visible from the street)Details
demolish existing back stairs/secondary egress and build new back stairs/secondary egress to comply with nov complaint 202657906 and nov 201711592 (not visible from the street) | $38,789 |
| May 7, 2026 | In progress issued May 2026 | 290 Avila St | remove (e) brick in backyard. digout and prepare substrate 8-10" and grade, replace (e) gas line to (e) bbq island and extend for (n) fire pit. trench for new water line for (n) 3/4" mht hose bib, sperad layer of 3/4" open graded aggregate, compact,and arrange geogird for stabilization. fill with 6Details
remove (e) brick in backyard. digout and prepare substrate 8-10" and grade, replace (e) gas line to (e) bbq island and extend for (n) fire pit. trench for new water line for (n) 3/4" mht hose bib, sperad layer of 3/4" open graded aggregate, compact,and arrange geogird for stabilization. fill with 6 | $38,728 |
| Apr 20, 2026 | In progress issued May 2026 | 476 38th Av | demo (e) deck and underlaying concrete. layout for new 4x4 posts and footings. excavate and place rebar/concrete for new footings. install weed barier. construct new deck-finish layer is composite timber tech products. 42" guardrail along all open edges.Details
demo (e) deck and underlaying concrete. layout for new 4x4 posts and footings. excavate and place rebar/concrete for new footings. install weed barier. construct new deck-finish layer is composite timber tech products. 42" guardrail along all open edges. | $48,738 |
| Jan 14, 2026 | In progress issued Jan 2026 | 476 38th Av | demolish the existing powder room to enlarge and renovate the kitchen. perform structural modification to create an open connection between the kitchen and dining room. provide a new powder room within the existing sunroom.Details
demolish the existing powder room to enlarge and renovate the kitchen. perform structural modification to create an open connection between the kitchen and dining room. provide a new powder room within the existing sunroom. | $78,342 |
| Nov 6, 2025 | In progress issued Nov 2025 | 96 Crestline Dr | repair exterior deck & stairs (less than 50%) at rear.Details
repair exterior deck & stairs (less than 50%) at rear. | $14,309 |
| Oct 30, 2025 | Completed final sign-off Mar 2026 | 6035 Geary Bl | remodel kitchen including four windows in light well, non street facing. remodel bathroom, like for like, using existing tub. replace window for bathroom, non street facing. replace subpanel. plumbing and electrical. remodel in-kind. u factor less than 0.30.Details
remodel kitchen including four windows in light well, non street facing. remodel bathroom, like for like, using existing tub. replace window for bathroom, non street facing. replace subpanel. plumbing and electrical. remodel in-kind. u factor less than 0.30. | $59,872 |
| Oct 7, 2025 | Completed final sign-off Feb 2026 | 2083 28th Av | existing bay window,remove (e)stucco to investigate water intrusion & replace like for like.Details
existing bay window,remove (e)stucco to investigate water intrusion & replace like for like. | $15,000 |
| Oct 1, 2025 | In progress filed Oct 2025, not yet issued | 2548 Hyde St | renovation of (e) bathroom in kind. new plumbing and electrical. new fixtures. new tile, vanity, mirror.Details
renovation of (e) bathroom in kind. new plumbing and electrical. new fixtures. new tile, vanity, mirror. | $48,728 |
| Oct 1, 2025 | Completed final sign-off Sep 2026 | 2548 Hyde St | renovation of existing bathroom, new plumbing and electrical, new fixtures, tiles, vanity, mirrors. like for like remodel.Details
renovation of existing bathroom, new plumbing and electrical, new fixtures, tiles, vanity, mirrors. like for like remodel. | $48,728 |
| Jan 22, 2025 | Completed final sign-off Aug 2025 | 2044 Jefferson St | in kind renovations following a flood. renovate one bathroom as per plan on the upper floor.Details
in kind renovations following a flood. renovate one bathroom as per plan on the upper floor. | $101,283 |
| May 22, 2024 | Completed final sign-off May 2025 | 1255 California St | unit #204: remodel existing condomoinium new flooring, kitchen, 2 full baths, new electric fire placeDetails
unit #204: remodel existing condomoinium new flooring, kitchen, 2 full baths, new electric fire place | $178,000 |
| Mar 1, 2023 | Completed final sign-off Apr 2023 | 766 Hayes St | to comply with nov# 202070301, repair stairs 50% or less.Details
to comply with nov# 202070301, repair stairs 50% or less. | $8,670 |