Omni Madison Dba Omni Window/Laguna Mad
- Based in
- Fremont
- On San Francisco permits
- May 2007 to Jul 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2010 | Completed final sign-off Aug 2010 | 1563 09th Av | replace 4-front windows; wood to wood clad.Details
replace 4-front windows; wood to wood clad. | $5,300 |
| May 16, 2008 | Completed final sign-off Aug 2008 | 857 Church St | replace 14 windows in existing openings. same size & same location. 6 in front of building. 4 in back of building. 4 in lightwell.Details
replace 14 windows in existing openings. same size & same location. 6 in front of building. 4 in back of building. 4 in lightwell. | $9,000 |
| Mar 26, 2008 | Completed final sign-off Jul 2008 | 3712 Balboa St | vinyl replacement windows. 4 like for like. no new opening. stucco back 1 x 4 foam trim.Details
vinyl replacement windows. 4 like for like. no new opening. stucco back 1 x 4 foam trim. | $4,900 |
| May 29, 2007 | Completed final sign-off Feb 2008 | 2901 Pierce St | demolish 1 story, garage building.Details
demolish 1 story, garage building. |