- 6 permits filed
11 permits since 2000: 9 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 995 Clayton St | kitchen remodel, new cabinets, update electrical and plumbing, new sink, new water lines, new counter tops.Details
kitchen remodel, new cabinets, update electrical and plumbing, new sink, new water lines, new counter tops. | $20,000 |
| Jun 2, 2026 | Completed final sign-off Jun 2026 | 905 Russia Av | waterproof 6ft of foundation.Details
waterproof 6ft of foundation. | $4,000 |
| May 26, 2026 | Completed final sign-off Jun 2026 | 591 Moscow St | waterproof 6ft of foundationDetails
waterproof 6ft of foundation | $4,000 |
| Jan 8, 2026 | Completed final sign-off Feb 2026 | 1030 Balboa St | install 5/8 type fire rated 1 hour drywall on garage ceiling (400sf)Details
install 5/8 type fire rated 1 hour drywall on garage ceiling (400sf) | $2,500 |
| May 1, 2025 | Completed final sign-off Feb 2026 | 414 Waller St | ref 202505015650- reroofing no hot worksDetails
ref 202505015650- reroofing no hot works | $15,000 |
| May 1, 2025 | Completed final sign-off Feb 2026 | 414 Waller St | replace some damaged siding and window trim, street facing. replace window sashes (sash only). partial repair of roofing (leak related). paint and repatch sheetrock (~100.sqft)Details
replace some damaged siding and window trim, street facing. replace window sashes (sash only). partial repair of roofing (leak related). paint and repatch sheetrock (~100.sqft) | $35,000 |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 460 Francisco St | unit 304-breaking out shower pan - re-waterproofing. building a small curb for shower area. sheetrock patch and paint. changing out shower flage drain.Details
unit 304-breaking out shower pan - re-waterproofing. building a small curb for shower area. sheetrock patch and paint. changing out shower flage drain. | $8,000 |
| Jul 26, 2024 | Completed final sign-off Sep 2024 | 919 Grove St | bathroom remodel in kind: demolition of existing tile, re do tile, install new shower valve and tub, new vanity and toilet. no removal of wallsDetails
bathroom remodel in kind: demolition of existing tile, re do tile, install new shower valve and tub, new vanity and toilet. no removal of walls | $20,552 |
| Jul 19, 2024 | In progress filed Jul 2024, not yet issued | 442 Fair Oaks St | revision to pa#202406144486 running a couple of 2x6 to existing structureDetails
revision to pa#202406144486 running a couple of 2x6 to existing structure | $2,500 |
| Jun 14, 2024 | Completed final sign-off Sep 2024 | 442 Fair Oaks St | non street facing: replacing all damaged deck boards and pouring 1 yard of concrete along side of house ( concrete is cracked)Details
non street facing: replacing all damaged deck boards and pouring 1 yard of concrete along side of house ( concrete is cracked) | $5,000 |
| Jun 5, 2024 | Completed final sign-off Oct 2024 | 275 Ashton Av | bathroom remodel at ground floor- like for like: changing shower valve, tiling shower walls and floors. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel at ground floor- like for like: changing shower valve, tiling shower walls and floors. no change to floor layout. no change to wall layout. no structural work. | $18,000 |