O Valley Construction
- Based in
- San Leandro
- On San Francisco permits
- Jan 2013 to Oct 2025
- Last 24 months
- 1 permit filed
9 permits since 2000: 6 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2025 | Completed final sign-off Feb 2026 | 770 Le Conte Av | remove all existing siding trim aorund windows and doors. install flashing through all windows and doors, install new double building paper over existing siding, install new stucco with staple at 8inch on center. install 7/8 stucco 3 phase, scratch brown and finish. street visible. 3 side of houseDetails
remove all existing siding trim aorund windows and doors. install flashing through all windows and doors, install new double building paper over existing siding, install new stucco with staple at 8inch on center. install 7/8 stucco 3 phase, scratch brown and finish. street visible. 3 side of house | $12,000 |
| May 23, 2016 | Completed final sign-off May 2016 | 910 Rhode Island St | to obtain final inspection for work approved under pa #201407312681, #201401236895, #201401146193. all work is complete.Details
to obtain final inspection for work approved under pa #201407312681, #201401236895, #201401146193. all work is complete. | |
| Jul 31, 2014 | Expired or cancelled expired May 2016 | 912 Rhode Island St | change front facade alternation to separater permit. work included new windows, new stucco, remodel existing bay to replace a new bay with cedar siding and enlarge (e) entry per plan.Details
change front facade alternation to separater permit. work included new windows, new stucco, remodel existing bay to replace a new bay with cedar siding and enlarge (e) entry per plan. | $15,000 |
| Jan 23, 2014 | Expired or cancelled expired May 2016 | 910 Rhode Island St | modify (e) rear stair with new 1 hour rated p.l wall.Details
modify (e) rear stair with new 1 hour rated p.l wall. | $9,000 |
| Jan 14, 2014 | Expired or cancelled expired May 2016 | 910 Rhode Island St | revision to app#201302079667 and 201302079670. change window openings at rear for both units. relocate laundry at lower unit 912. new concrete wall at garage level and storn wall per plans. new light fixutres and outlets.Details
revision to app#201302079667 and 201302079670. change window openings at rear for both units. relocate laundry at lower unit 912. new concrete wall at garage level and storn wall per plans. new light fixutres and outlets. | $5,000 |
| Sep 19, 2013 | Completed final sign-off May 2016 | 910 Rhode Island St | revision to appl #2013.01.25.8795 - foundation replacement in the garage.Details
revision to appl #2013.01.25.8795 - foundation replacement in the garage. | $30,000 |
| Feb 7, 2013 | Completed final sign-off May 2016 | 910 Rhode Island St | for both units #910 & 912 - alternate existing floor layout included removing & constructing interior walls, new light fixture & outlets, new bathroom. remodel (e) kitchen & bathroom for unit #912 only.Details
for both units #910 & 912 - alternate existing floor layout included removing & constructing interior walls, new light fixture & outlets, new bathroom. remodel (e) kitchen & bathroom for unit #912 only. | $48,000 |
| Feb 7, 2013 | Completed final sign-off May 2016 | 910 Rhode Island St | for unit 910 (3rd fl). alternate (e) floor lay out inclued removing & constructing interior walls. remodel (e) kitchen & bathrooms. raise roof line at dining room area & align new ceiling with (e) ceiling height. work only at the rear half of building. replace wd shingle w/ stucco. replace windows.Details
for unit 910 (3rd fl). alternate (e) floor lay out inclued removing & constructing interior walls. remodel (e) kitchen & bathrooms. raise roof line at dining room area & align new ceiling with (e) ceiling height. work only at the rear half of building. replace wd shingle w/ stucco. replace windows. | $30,000 |
| Jan 25, 2013 | Completed final sign-off May 2016 | 910 Rhode Island St | garage column removal, related beam & foundation. lateral strenghtening of the garage. no habitable space on 1st floor. new rear yard retaining wall.Details
garage column removal, related beam & foundation. lateral strenghtening of the garage. no habitable space on 1st floor. new rear yard retaining wall. | $25,000 |