O' Flynn Construction Co
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to May 2015
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2015 | Completed final sign-off Aug 2015 | 150 Page St | bathroom remodel, unit 210. tile replacement, new vanity sink, toilet no walls removed.Details
bathroom remodel, unit 210. tile replacement, new vanity sink, toilet no walls removed. | $4,000 |
| Jan 23, 2012 | Completed final sign-off Apr 2012 | 3899 Jackson St | revision to app#201104184311 to upgrade foundation and additional shearwall. remove 2 windows on ground floor and door facing backyard and replace with one glass sliding door to accomodate shearwal at both side.Details
revision to app#201104184311 to upgrade foundation and additional shearwall. remove 2 windows on ground floor and door facing backyard and replace with one glass sliding door to accomodate shearwal at both side. | $25,000 |
| Apr 18, 2011 | Completed final sign-off Apr 2012 | 3899 Jackson St | kitchen remodel in an(e) single fam. res. no flr. area is being added. the remodel includes alterations of (e) exterior windows and doors structural alterations for vertical loads. heating system, plumbing and electrical system alterations.Details
kitchen remodel in an(e) single fam. res. no flr. area is being added. the remodel includes alterations of (e) exterior windows and doors structural alterations for vertical loads. heating system, plumbing and electrical system alterations. | $45,000 |
| Nov 30, 2010 | Never finaled issued Dec 2010, no final | 2015 Pacific Av | remove fire escape gooseneck at roof to allow for new deck railing and for child safety reasons, new means of egress is being provided with new deck and only 1 is required as new deckDetails
remove fire escape gooseneck at roof to allow for new deck railing and for child safety reasons, new means of egress is being provided with new deck and only 1 is required as new deck | |
| Oct 8, 2010 | Completed final sign-off Dec 2010 | 33 05th Av | deck repair: repair deck boards, stairs & railing & any damaged supports (less than 50%).Details
deck repair: repair deck boards, stairs & railing & any damaged supports (less than 50%). | $4,000 |
| May 6, 2009 | Completed final sign-off Aug 2009 | 1746 Green St | replace rotten wood on deck at rear of building. repair with ply wood in kind. less than 50%.Details
replace rotten wood on deck at rear of building. repair with ply wood in kind. less than 50%. | $2,500 |