O'donnell Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Jan 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 7700 Geary Bl | roof gooseneck. fire escape at rear of building. rusted and broken; replaced less than 5% partially. comply with #202429562 item #2Details
roof gooseneck. fire escape at rear of building. rusted and broken; replaced less than 5% partially. comply with #202429562 item #2 | $600 |
| Aug 22, 2024 | In progress issued Sep 2024 | 600 Page St | cutout existing sheetrock to install breaker panel of approx. dimension 4"x12" relocated from closet of same interior wall located in living room. (e) wall is a non-rated partition wall with no cutting of stud required. replace water heater storage tank.Details
cutout existing sheetrock to install breaker panel of approx. dimension 4"x12" relocated from closet of same interior wall located in living room. (e) wall is a non-rated partition wall with no cutting of stud required. replace water heater storage tank. | $3,000 |
| Jan 3, 2017 | Completed final sign-off Jan 2017 | 801 Cole St | replace some 2x6 redwood decking & facia board; less than 50%.Details
replace some 2x6 redwood decking & facia board; less than 50%. | $2,200 |
| Jun 30, 2016 | Completed final sign-off Nov 2016 | 1845 Cabrillo St | add additional rail to stairs 4" or less add 2x6 pt to landing. less than 50%Details
add additional rail to stairs 4" or less add 2x6 pt to landing. less than 50% | $300 |
| Sep 22, 2006 | Completed final sign-off Feb 2007 | 1704 Broderick St | replace 5ft upper & lower cabinets in kitchen. replace 5ft granite counter & stainless steel sink.Details
replace 5ft upper & lower cabinets in kitchen. replace 5ft granite counter & stainless steel sink. | $5,800 |
| Mar 11, 2004 | Completed final sign-off Mar 2005 | 2655 Polk St | replace copper pipe,remove some plaster,replace with 5/8 rock for bath/kitchen @#102 to 602,Details
replace copper pipe,remove some plaster,replace with 5/8 rock for bath/kitchen @#102 to 602, | $26,000 |