Nrci Telecom
- Based in
- Applegate
- On San Francisco permits
- Aug 2025 to Mar 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2026 | Completed final sign-off Jun 2026 | 1625 Post St | revision to pa # 2025-0821-3599: install (1) omnion outdoor plants, remove (8) 170 ah batteries and relocate (12) 170 ah batteries.Details
revision to pa # 2025-0821-3599: install (1) omnion outdoor plants, remove (8) 170 ah batteries and relocate (12) 170 ah batteries. | |
| Dec 3, 2025 | Completed final sign-off Jun 2026 | 1745 Market St | at&t: modification of an (e) unmanned wireless facility. remove/replace (3) antennas, (1) distribution shell in pp. install converters, rectifiers, (3) 50amp, (1) 15amp dc breakers in pp. remove (20) 160ah batteries and install (20) 210amp batteries in (e) pp and battery rack....Details
at&t: modification of an (e) unmanned wireless facility. remove/replace (3) antennas, (1) distribution shell in pp. install converters, rectifiers, (3) 50amp, (1) 15amp dc breakers in pp. remove (20) 160ah batteries and install (20) 210amp batteries in (e) pp and battery rack.... | $80,300 |
| Aug 21, 2025 | Completed final sign-off Jun 2026 | 1625 Post St | at&t modification of e) wireless facility:r/r 3 antennas, install 3 rru's, 1 dc trunk, 1 dc-9, rf stripping, barricade & signage, remove 32 batteries, install 20 new 210aa, r/r 12 rectifiers, remove 2 power plants, install 1 netsure conversion power plant, install 12 58v converters, 1) 15 amp & 6 dcDetails
at&t modification of e) wireless facility:r/r 3 antennas, install 3 rru's, 1 dc trunk, 1 dc-9, rf stripping, barricade & signage, remove 32 batteries, install 20 new 210aa, r/r 12 rectifiers, remove 2 power plants, install 1 netsure conversion power plant, install 12 58v converters, 1) 15 amp & 6 dc | $55,000 |