Np Construction
- Based in
- Petaluma
- On San Francisco permits
- Mar 2013 to Aug 2021
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2021 | Completed final sign-off Dec 2021 | 2751 Buchanan St | revision to 202107084009 roof beam post tube relocatedDetails
revision to 202107084009 roof beam post tube relocated | $7,500 |
| Jul 8, 2021 | Completed final sign-off Dec 2021 | 2751 Buchanan St | topo level - remodeling (e) master bathroom & master bedroom closet. replace (e) lighting for led and replace (e) plumbing to new california codeDetails
topo level - remodeling (e) master bathroom & master bedroom closet. replace (e) lighting for led and replace (e) plumbing to new california code | $50,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2021 | 898 Francisco St | kitchen remodeling on existing kitchen. replace existing ceiling lights led. replace 4 existing windows at rear, same size, and in same location. marvin-double-paned (alum-clad wood). no removing walls.Details
kitchen remodeling on existing kitchen. replace existing ceiling lights led. replace 4 existing windows at rear, same size, and in same location. marvin-double-paned (alum-clad wood). no removing walls. | $100,000 |
| Aug 15, 2016 | Completed final sign-off Feb 2017 | 126 Miraloma Dr | remodel 3rd floor bath, new tile, replace (e) fixtures.Details
remodel 3rd floor bath, new tile, replace (e) fixtures. | $7,000 |
| May 23, 2016 | Completed final sign-off Feb 2017 | 126 Miraloma Dr | demo kitchen/master bath, install new fixtures, cabinets, finishes, construct approx. 10 ln. ft. non bearing/non rated partition.Details
demo kitchen/master bath, install new fixtures, cabinets, finishes, construct approx. 10 ln. ft. non bearing/non rated partition. | $65,000 |
| Mar 23, 2016 | Completed final sign-off Apr 2016 | 1021 Lake St | repair to railing & treds of exterior stairs - rear of bldg, less than 50%Details
repair to railing & treds of exterior stairs - rear of bldg, less than 50% | $8,500 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 1021 Lake St | interior remodel (3rd floor) - remodel kitchen, bath & laundry, add new bath.Details
interior remodel (3rd floor) - remodel kitchen, bath & laundry, add new bath. | $115,000 |
| Oct 18, 2013 | Completed final sign-off Jan 2014 | 1101 De Haro St | replace existing windows per double glazing visable to street side on front of building. new window to be alumin framed.repair dryrot faming below window. new window is same size and location. min u factor .40Details
replace existing windows per double glazing visable to street side on front of building. new window to be alumin framed.repair dryrot faming below window. new window is same size and location. min u factor .40 | $5,500 |
| Mar 14, 2013 | Completed final sign-off Apr 2013 | 1701 Jackson St | bathroom - remodeling/new cabinets/ new shower doors/ new tile/new plumbing fixtures/ new counter topsDetails
bathroom - remodeling/new cabinets/ new shower doors/ new tile/new plumbing fixtures/ new counter tops | $25,000 |