Nova Designs Builds Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jul 2026
- Last 24 months
- 9 permits filed
269 permits since 2000: 201 completed, 4 in progress, 26 never finaled, 38 expired or cancelled.
Of the 26 never-finaled permits, 3 are 5 to 10 years old, 23 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 269.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress issued Jul 2026 | 940 Shotwell St | replace and repair siding in kind in front. repair dryrot at stairs at back less than 50%. all work in kind.Details
replace and repair siding in kind in front. repair dryrot at stairs at back less than 50%. all work in kind. | $3,500 |
| Jul 28, 2026 | Completed final sign-off Aug 2026 | 219 Spruce St | revision to pa # 202312263106 - add guardrail at rear pation at the section where elevation change > 30".Details
revision to pa # 202312263106 - add guardrail at rear pation at the section where elevation change > 30". | $750 |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 219 Spruce St | to obtain final inspection for work approved under pa# 202501218678. all work is complete.Details
to obtain final inspection for work approved under pa# 202501218678. all work is complete. | |
| Jan 30, 2026 | In progress issued Jan 2026 | 3441 Washington St | replace existing woodburning fireplace by gas directvent fireplace in living room. gas vent shall compy with cmc 802.6 and sfmc 802.6.1Details
replace existing woodburning fireplace by gas directvent fireplace in living room. gas vent shall compy with cmc 802.6 and sfmc 802.6.1 | $10,000 |
| Oct 22, 2025 | In progress issued Oct 2025 | 3441 Washington St | rev to pa# 2025-0829-4188: remodel (e) guest bath in basement, remodel kitchen at 1st fl. remodel 2 exisiting bathrooms and add 1 bathroom at 2nd fl. add 4 skylightsDetails
rev to pa# 2025-0829-4188: remodel (e) guest bath in basement, remodel kitchen at 1st fl. remodel 2 exisiting bathrooms and add 1 bathroom at 2nd fl. add 4 skylights | $150,000 |
| Aug 29, 2025 | In progress issued Aug 2025 | 3441 Washington St | remodel kitchen & bathroom in kind (no exterior work)Details
remodel kitchen & bathroom in kind (no exterior work) | $50,000 |
| Jun 27, 2025 | Completed final sign-off Oct 2025 | 3471 Jackson St | remodel 2 existing bathrooms in kind. no structural work.Details
remodel 2 existing bathrooms in kind. no structural work. | $75,000 |
| Jan 21, 2025 | Expired or cancelled expired Aug 2026 | 219 Spruce St | remove kitchen cabinets, tiles, wood floorng, trim to be replaced under pa# 2023-1226-3106Details
remove kitchen cabinets, tiles, wood floorng, trim to be replaced under pa# 2023-1226-3106 | $5,000 |
| Dec 5, 2024 | Completed final sign-off Jul 2025 | 2724 Filbert St | revision to permit 201505075639-s1, relocate entry doors to upper 2 units to conform to historical classification. entry doors to each upper unit to be located at 2/f landing, accessed by recessed exterior stairs (inside building)Details
revision to permit 201505075639-s1, relocate entry doors to upper 2 units to conform to historical classification. entry doors to each upper unit to be located at 2/f landing, accessed by recessed exterior stairs (inside building) | |
| Dec 26, 2023 | Completed final sign-off Aug 2026 | 219 Spruce St | replace (e) wood windows w/ (n) double pane wood & glass doors at front facade. replace primary bedroom windows in-kind. remodel (e) kitchen, family, dining, & powder rm. replace (e) windows & sliding door at rear. (n) hydronic floor heating on all lvls. remodel (e) 4 baths & 2 powder rooms. replaceDetails
replace (e) wood windows w/ (n) double pane wood & glass doors at front facade. replace primary bedroom windows in-kind. remodel (e) kitchen, family, dining, & powder rm. replace (e) windows & sliding door at rear. (n) hydronic floor heating on all lvls. remodel (e) 4 baths & 2 powder rooms. replace | $300,000 |
| Nov 2, 2023 | Completed final sign-off Nov 2024 | 1868 Greenwich St | revision to pa# 201907176164: add two skylights at roof, revise layout at 4/f and 2/f. add powder room at 2/f, no exterior changes.Details
revision to pa# 201907176164: add two skylights at roof, revise layout at 4/f and 2/f. add powder room at 2/f, no exterior changes. | $5,000 |
| Jun 26, 2023 | Completed final sign-off Mar 2026 | 1171 Capitol Av | comply with nov 202301350. create new 1 bedroom adu unit on ground floor at rear of existing garage. add new deck 30" above grade to access rear yard.Details
comply with nov 202301350. create new 1 bedroom adu unit on ground floor at rear of existing garage. add new deck 30" above grade to access rear yard. | $50,000 |
| Feb 23, 2023 | Completed final sign-off Nov 2024 | 1868 Greenwich St | revisions to pa#201907176164. ordinary moment frame to replace special moment frameDetails
revisions to pa#201907176164. ordinary moment frame to replace special moment frame | |
| Oct 11, 2022 | Completed final sign-off Jun 2023 | 675 23rd Av | add 435 sqft living space at 1st floor in garage + infill below 2 story at rear - add rear deck + stairs to yard - remodel kitchen + powder rm - add (1) bathroom + laundry closet at 3rd floor. kitchen, pwder rm & (e) bathroom covered under ref pa# 202209021811.Details
add 435 sqft living space at 1st floor in garage + infill below 2 story at rear - add rear deck + stairs to yard - remodel kitchen + powder rm - add (1) bathroom + laundry closet at 3rd floor. kitchen, pwder rm & (e) bathroom covered under ref pa# 202209021811. | $150,000 |
| Sep 2, 2022 | Completed final sign-off Jun 2023 | 675 23rd Av | remodel one kitchen, one powder room, one bathroom- no structural work- no exterior work.Details
remodel one kitchen, one powder room, one bathroom- no structural work- no exterior work. | $35,000 |
| Jun 21, 2022 | Completed final sign-off May 2023 | 414 Spruce St | remodel (e) kitchen and (e) bathroom at 2nd fl. no structural work, replace cabinets, countertops and tilesDetails
remodel (e) kitchen and (e) bathroom at 2nd fl. no structural work, replace cabinets, countertops and tiles | $35,000 |
| Apr 4, 2022 | Completed final sign-off Nov 2022 | 538 21st Av | work on lower unit (#540) only: replace kitchen cabinets, appliances, remodel bathroom. no structural work. no wall/ framing modificationsDetails
work on lower unit (#540) only: replace kitchen cabinets, appliances, remodel bathroom. no structural work. no wall/ framing modifications | $25,000 |
| Feb 28, 2022 | Completed final sign-off Jun 2022 | 776 27th St | add electric washer and dryer in basement family room.Details
add electric washer and dryer in basement family room. | $800 |
| Feb 3, 2022 | Completed final sign-off Nov 2023 | 2800 Lake St | 1st floor remodel: (e) kitchen, (e) powder room, 2(e) bathrooms on 2nd floor. no structural work.Details
1st floor remodel: (e) kitchen, (e) powder room, 2(e) bathrooms on 2nd floor. no structural work. | $50,000 |
| Feb 3, 2022 | Completed final sign-off Jun 2022 | 776 27th St | remodel existing basement wet bar, replace ikea cabinets with custom. no structural work. all work in kind.Details
remodel existing basement wet bar, replace ikea cabinets with custom. no structural work. all work in kind. | $7,500 |
| Apr 29, 2021 | Completed final sign-off Jun 2021 | 625 Larkin St | remodel (e) kitchen; replace cabinets, countertop, applianece. remodel bathroom replace plumbing fixtures, retile.Details
remodel (e) kitchen; replace cabinets, countertop, applianece. remodel bathroom replace plumbing fixtures, retile. | $5,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 2629 19th St | replace wood siding ~700 sqft in kind at rear. replace 5 aluminum windows with wood windows. 3 are visible from street.Details
replace wood siding ~700 sqft in kind at rear. replace 5 aluminum windows with wood windows. 3 are visible from street. | $5,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2020 | 1973 Filbert St | to obtain final inspection for work approved under pa #201507020532, 201610130241. all work is complete.Details
to obtain final inspection for work approved under pa #201507020532, 201610130241. all work is complete. | |
| Sep 27, 2019 | Expired or cancelled expired Apr 2026 | 2319 Washington St | 1st fl. remove 2nd set of stairs, add mudroom, 2nd fl. remodel kitchen, add closet under stairs, open dining room wall, add closet in bedroom 1, add door to shared bath, 3rd fl. remove closet and study, relocate master bedroom, add master closet & studyDetails
1st fl. remove 2nd set of stairs, add mudroom, 2nd fl. remodel kitchen, add closet under stairs, open dining room wall, add closet in bedroom 1, add door to shared bath, 3rd fl. remove closet and study, relocate master bedroom, add master closet & study | $175,000 |
| Aug 7, 2019 | Completed final sign-off Aug 2019 | 255 Seacliff Av | revision to 201408012761, remove stairs from rear courtyard to rear yardDetails
revision to 201408012761, remove stairs from rear courtyard to rear yard | |
| Jul 17, 2019 | Completed final sign-off Nov 2024 | 1868 Greenwich St | to erect 4 stories, no basement, type v-b, 2-family dwelling residence.Details
to erect 4 stories, no basement, type v-b, 2-family dwelling residence. | $1,700,000 |
| Jul 17, 2019 | Completed final sign-off Nov 2024 | 1868 Greenwich St | demolish 2-story single family dwellingDetails
demolish 2-story single family dwelling | $10,000 |
| Mar 27, 2019 | Completed final sign-off Aug 2019 | 255 Seacliff Av | revision to pa 201408012761. revision of title 24Details
revision to pa 201408012761. revision of title 24 | |
| Jun 4, 2018 | Expired or cancelled cancelled Jan 2026 | 824 Florida St | revisiont o 201503110498 to compky with correction upgrade (e) property line wallsDetails
revisiont o 201503110498 to compky with correction upgrade (e) property line walls | |
| Feb 16, 2018 | Expired or cancelled cancelled Nov 2024 | 3020 Buchanan St | 1 story vertical addition and side additions to (e) 2 story over basement. (e) 5 full baths, 1 kitchen, 1 laundry. (n) 4 full baths, redo kitchen, new 2 half baths, 2 wetbars and redo laundry.Details
1 story vertical addition and side additions to (e) 2 story over basement. (e) 5 full baths, 1 kitchen, 1 laundry. (n) 4 full baths, redo kitchen, new 2 half baths, 2 wetbars and redo laundry. | $950,000 |
| Feb 9, 2018 | Never finaled issued Feb 2018, no final | 255 Seacliff Av | application for board of appeals conditions: 17-144/145/148/150Details
application for board of appeals conditions: 17-144/145/148/150 | |
| Oct 26, 2017 | Expired or cancelled suspend Nov 2025 | 369 Valley St | two story over bsement rear addition to existing earthquake cottages over new basement, basement; 2 bedroom, 2 bathroom, laundry, storage sumppump, 1st floor; master suite, media rm, entry, office, 2ndfl, kitchen, living rm, dining, powder, roof deck. un-permitted rear addition to be demoed.Details
two story over bsement rear addition to existing earthquake cottages over new basement, basement; 2 bedroom, 2 bathroom, laundry, storage sumppump, 1st floor; master suite, media rm, entry, office, 2ndfl, kitchen, living rm, dining, powder, roof deck. un-permitted rear addition to be demoed. | $750,000 |
| Oct 11, 2017 | Completed final sign-off May 2021 | 2643 Greenwich St | (1)story vertical/rear horizontal addition. 1st fl: lower unit(2)bedrm,(2)bath, laundry, storage, garage. 2nd fl: lower unit living, dining, kitchen, family & powder rm. upper unit: entry & elevator for upper unit only. 3rd & 4th fl: upper unit(3)bedrm &(3)bath, laundry on 3rd. living, dining,kitchDetails
(1)story vertical/rear horizontal addition. 1st fl: lower unit(2)bedrm,(2)bath, laundry, storage, garage. 2nd fl: lower unit living, dining, kitchen, family & powder rm. upper unit: entry & elevator for upper unit only. 3rd & 4th fl: upper unit(3)bedrm &(3)bath, laundry on 3rd. living, dining,kitch | $950,000 |
| Jul 27, 2017 | Never finaled issued Aug 2017, no final | 2736 Filbert St | rev to pa#201601137012. remove rear yard stairs from 2/f to rear yard. revise 2nd floor-relocate living room fireplace and kitchen. 3rd floor-revise master suite layout.Details
rev to pa#201601137012. remove rear yard stairs from 2/f to rear yard. revise 2nd floor-relocate living room fireplace and kitchen. 3rd floor-revise master suite layout. | |
| Jul 12, 2017 | Completed final sign-off Dec 2018 | 642 Vermont St | underpin 12'-0" of rear foundation at nw corner. to comply with nov #201790821.Details
underpin 12'-0" of rear foundation at nw corner. to comply with nov #201790821. | $5,000 |
| Jul 7, 2017 | Completed final sign-off Aug 2020 | 2551 Greenwich St | revision to pa #201312063534 - revise to type 5a construction & 13r nfpa sprinkler. add dumbwaiter in lightwell, demo property line window, partial rear deck demo, new rear window sizes, remove skylight.Details
revision to pa #201312063534 - revise to type 5a construction & 13r nfpa sprinkler. add dumbwaiter in lightwell, demo property line window, partial rear deck demo, new rear window sizes, remove skylight. | |
| May 25, 2017 | Completed final sign-off Nov 2018 | 636 Vermont St | revision to pa#201506300373, add lula elevator, revise stairs.Details
revision to pa#201506300373, add lula elevator, revise stairs. | $25,000 |
| Nov 3, 2016 | Completed final sign-off Jan 2017 | 561 Clipper St | revision to pa#201312234899, add steps at entry, minor encoroachment.Details
revision to pa#201312234899, add steps at entry, minor encoroachment. | |
| Oct 13, 2016 | Never finaled issued Oct 2016, no final | 1973 Filbert St | remodel 3/f wet bar, new cabinetes & new countertop; no structural work.Details
remodel 3/f wet bar, new cabinetes & new countertop; no structural work. | $5,000 |
| Sep 27, 2016 | Completed final sign-off Nov 2017 | 440 Utah St | revisions to pa 201502239108: remove guest room @ 1st flr, add 2 fire rated windows at 4th flr north pl wall. these two fire rated windows shall be fixed. see ab-009 under pa#2015/0223/9108.Details
revisions to pa 201502239108: remove guest room @ 1st flr, add 2 fire rated windows at 4th flr north pl wall. these two fire rated windows shall be fixed. see ab-009 under pa#2015/0223/9108. | |
| Sep 20, 2016 | Completed final sign-off Mar 2017 | 2100 Pacific Av | unit 9: removal of non-structural walls to create a new suite and relocate extg gymDetails
unit 9: removal of non-structural walls to create a new suite and relocate extg gym | $25,000 |
| Jul 14, 2016 | Expired or cancelled expired Mar 2019 | 23 Wood St | remove sheetrock for preperation/exploration for pa#201503160905, no strucrucal work, no exterior work under this permit. maintain 1-hour property line rating on south wall.Details
remove sheetrock for preperation/exploration for pa#201503160905, no strucrucal work, no exterior work under this permit. maintain 1-hour property line rating on south wall. | $5,000 |
| Jun 10, 2016 | Completed final sign-off Jul 2016 | 2476 Broadway | revision to pa #201406097868-s: remove windows in rec. room use adjoing room for light & air qualifying @ 1st floor. n/a maher ordinanceDetails
revision to pa #201406097868-s: remove windows in rec. room use adjoing room for light & air qualifying @ 1st floor. n/a maher ordinance | |
| Apr 14, 2016 | Completed final sign-off Mar 2017 | 2456 Filbert St | revision to pa#201407221879, revise roof framing at front roof overhang. no exterior changes. n/a ordinance #155-13Details
revision to pa#201407221879, revise roof framing at front roof overhang. no exterior changes. n/a ordinance #155-13 | |
| Apr 8, 2016 | Completed final sign-off Jul 2016 | 2476 Broadway | to obtain a final inspection for work approved under pa#201406097868,201412153764,201502107877. all work is complete.Details
to obtain a final inspection for work approved under pa#201406097868,201412153764,201502107877. all work is complete. | |
| Mar 10, 2016 | Completed final sign-off Jan 2017 | 561 Clipper St | revision to pa #201312234899 - relocate kitchen from 1st to 3rd floor, revise 2nd floor layout, remove 3rd floor powder room, add 2 fire rated windows at 3rd floor east property line wall. remove skylight.Details
revision to pa #201312234899 - relocate kitchen from 1st to 3rd floor, revise 2nd floor layout, remove 3rd floor powder room, add 2 fire rated windows at 3rd floor east property line wall. remove skylight. | |
| Jan 13, 2016 | Completed final sign-off Jun 2018 | 2736 Filbert St | vertical & horiz addition. 1st fl: expand garage add famil rm,add elevator, relocate bathrm. 2nd fl: relocate kitchen,dinning rm, living rm & powder rm. add elevator. 3rd fl: relocate 3 bedrm+ 2 baths, add 1 bedrm, 1 bath & 1 laundry+elevator. 4th fl: add family rm, wetbar, bathrm & elevatorDetails
vertical & horiz addition. 1st fl: expand garage add famil rm,add elevator, relocate bathrm. 2nd fl: relocate kitchen,dinning rm, living rm & powder rm. add elevator. 3rd fl: relocate 3 bedrm+ 2 baths, add 1 bedrm, 1 bath & 1 laundry+elevator. 4th fl: add family rm, wetbar, bathrm & elevator | $750,000 |
| Dec 10, 2015 | Completed final sign-off May 2016 | 715 Hampshire St | remodel (e) kitchen & (e) bathroom. no structural work.Details
remodel (e) kitchen & (e) bathroom. no structural work. | $20,000 |
| Sep 10, 2015 | Completed final sign-off Jan 2016 | 940 Shotwell St | increase work value for pa#201502178464 at dbi inspector's request - no additional work.Details
increase work value for pa#201502178464 at dbi inspector's request - no additional work. | $30,000 |
| Sep 10, 2015 | Completed final sign-off Jul 2016 | 2476 Broadway | street address correction after approved merger of two units as approved under pa #201406097868 legal street addresses for upper unit shall be 2476 broadway. lower unit shall be 2478 broadway. remove 2474 broadwayDetails
street address correction after approved merger of two units as approved under pa #201406097868 legal street addresses for upper unit shall be 2476 broadway. lower unit shall be 2478 broadway. remove 2474 broadway | |
| Jul 2, 2015 | Never finaled issued Aug 2016, no final | 1973 Filbert St | replace (e) flooring on roof top & terraces with ipe wood, new bbq area & sink, new fire pit, new green roof.Details
replace (e) flooring on roof top & terraces with ipe wood, new bbq area & sink, new fire pit, new green roof. | $50,000 |
| Jun 30, 2015 | Completed final sign-off Nov 2018 | 636 Vermont St | two story horizontal/vertical addition to existing 2 story building, 1st fl; bathroom, rec room, 2nd fl; add master suite, remodel 2 bedrooms, relocate kitchen, dining, living rm to 3rd fl, add 4th fl, family rm, wet bar, add elevator, and add roof deck.Details
two story horizontal/vertical addition to existing 2 story building, 1st fl; bathroom, rec room, 2nd fl; add master suite, remodel 2 bedrooms, relocate kitchen, dining, living rm to 3rd fl, add 4th fl, family rm, wet bar, add elevator, and add roof deck. | $550,000 |
| May 26, 2015 | Completed final sign-off Jan 2017 | 561 Clipper St | revision to pa 2013 1223 4899 - relocate kitchen & living room to 3rd flr, structural revisions. no exterior changesDetails
revision to pa 2013 1223 4899 - relocate kitchen & living room to 3rd flr, structural revisions. no exterior changes | |
| May 7, 2015 | Completed final sign-off Jul 2025 | 2726 Filbert St | remodel/renovation of an existing 3-unit 7,828 sq ft interior. hori/vert additions. the (e) garage will be expanded to incl 3 off street parking with add'l storage reached by lift. proposed type 5a, 4 story over basement. fire sprinkler per nfpa 13/fire alarm per nfpa 72 under sep permits.Details
remodel/renovation of an existing 3-unit 7,828 sq ft interior. hori/vert additions. the (e) garage will be expanded to incl 3 off street parking with add'l storage reached by lift. proposed type 5a, 4 story over basement. fire sprinkler per nfpa 13/fire alarm per nfpa 72 under sep permits. | $2,214,000 |
| Apr 29, 2015 | Completed final sign-off Nov 2015 | 46 Roselyn Tr | construct 1 hour rated separated basement hall/mudroom, bathroom and laundry room to separate garage from living space at basement level and stair way to 2nd story.Details
construct 1 hour rated separated basement hall/mudroom, bathroom and laundry room to separate garage from living space at basement level and stair way to 2nd story. | $22,000 |
| Apr 15, 2015 | Completed final sign-off Jan 2016 | 2250 Vallejo St | new 5' max retaining wall in rear yard. not to exceed 3' above grade. maher - not req'dDetails
new 5' max retaining wall in rear yard. not to exceed 3' above grade. maher - not req'd | $10,000 |
| Mar 16, 2015 | Expired or cancelled expired Feb 2025 | 23 Wood St | revision to appn #200207252319 to affect repair per correction notices issued by district inspector. remodel (e) units add elevator, add roof deck infill 4th floor deck, horriz. extension at street side of 4th floorDetails
revision to appn #200207252319 to affect repair per correction notices issued by district inspector. remodel (e) units add elevator, add roof deck infill 4th floor deck, horriz. extension at street side of 4th floor | $50,000 |
| Mar 11, 2015 | Completed final sign-off Oct 2019 | 824 Florida St | vertical&horizontal addition. add 2 stories. add roof deck. 1&2/fl-3 br & 2 baths, laundry, living, dining & kitchen. 3/fl-rec room & powder room.Details
vertical&horizontal addition. add 2 stories. add roof deck. 1&2/fl-3 br & 2 baths, laundry, living, dining & kitchen. 3/fl-rec room & powder room. | $950,000 |
| Mar 6, 2015 | Expired or cancelled expired Mar 2019 | 23 Wood St | to obtain final inspection for work approved under pa# 200207252319. all work is complete.Details
to obtain final inspection for work approved under pa# 200207252319. all work is complete. | |
| Mar 4, 2015 | Never finaled issued Apr 2016, no final | 19 Wood St | to construct 4 stories, no basement, 2 units residential building.Details
to construct 4 stories, no basement, 2 units residential building. | $850,000 |
| Feb 23, 2015 | Completed final sign-off Nov 2017 | 440 Utah St | horizontal rear addition & 2-story vertical addition to existing 2-story residence. add elevator. add 2 bedrooms & 1 bthroom. add wet bar & rec room.Details
horizontal rear addition & 2-story vertical addition to existing 2-story residence. add elevator. add 2 bedrooms & 1 bthroom. add wet bar & rec room. | $850,000 |
| Feb 19, 2015 | Expired or cancelled expired Feb 2025 | 21 Wood St | to obtain final inspection for work approved under pa#200411108899. all work is complete.Details
to obtain final inspection for work approved under pa#200411108899. all work is complete. | |
| Feb 17, 2015 | Completed final sign-off Jan 2016 | 940 Shotwell St | replace (e) foundation of 940 shotwell bldg. replace post and beam, add shearwalls.Details
replace (e) foundation of 940 shotwell bldg. replace post and beam, add shearwalls. | $15,000 |
| Dec 15, 2014 | Expired or cancelled expired Jul 2016 | 2474 Broadway | remodel street facade + partial side facades. n/a maher ordinance. unit merge under 201406097868sDetails
remodel street facade + partial side facades. n/a maher ordinance. unit merge under 201406097868s | $20,000 |
| Nov 3, 2014 | Completed final sign-off Dec 2014 | 23 Wood St | remove temporary fence on property to comply with nov 201240441 & replace concrete sidewalk in kind.Details
remove temporary fence on property to comply with nov 201240441 & replace concrete sidewalk in kind. | $500 |
| Nov 3, 2014 | Completed final sign-off Nov 2014 | 2807 Clay St | revision to pa 201102049665 for final completion of pa 201102049665 at front replacement of entry door with new wood door with single glass panel and replacement of double-hung windows with wood clad double hung window without og. historical planner approval. no change location.Details
revision to pa 201102049665 for final completion of pa 201102049665 at front replacement of entry door with new wood door with single glass panel and replacement of double-hung windows with wood clad double hung window without og. historical planner approval. no change location. | |
| Oct 24, 2014 | Completed final sign-off Jan 2016 | 2250 Vallejo St | revision to pa#201307252743 relocate approved fire escape from west elevation to east elevation. n/a ordinance #155-13.Details
revision to pa#201307252743 relocate approved fire escape from west elevation to east elevation. n/a ordinance #155-13. | |
| Sep 4, 2014 | Completed final sign-off Feb 2016 | 2250 Vallejo St | provide glass railing detail for approved roof deck. n/a for the maher ordinance #155-13Details
provide glass railing detail for approved roof deck. n/a for the maher ordinance #155-13 | $10,000 |
| Aug 1, 2014 | Completed final sign-off Jun 2018 | 255 Seacliff Av | to demolish 3 stories, single family dwelling building.Details
to demolish 3 stories, single family dwelling building. | $25,000 |
| Aug 1, 2014 | Completed final sign-off Aug 2019 | 255 Seacliff Av | to erect 3 stories, 1 basement, type v-b, single family residential building.Details
to erect 3 stories, 1 basement, type v-b, single family residential building. | $1,800,000 |
| Jul 22, 2014 | Never finaled issued Apr 2015, no final | 2456 Filbert St | full remodel & vertical addition. basement-add 2 car garage, 1st flr-living rm, dining rm, kitchen + pantry, powder rm, family rm, rear yard. 2nd fl -3 bedrms + 2 bathrms, master suite: bed rm, bath rm, closets, laundry. 3rd flr-rec rm w/wet bar, 1/2 bath. roof deck.Details
full remodel & vertical addition. basement-add 2 car garage, 1st flr-living rm, dining rm, kitchen + pantry, powder rm, family rm, rear yard. 2nd fl -3 bedrms + 2 bathrms, master suite: bed rm, bath rm, closets, laundry. 3rd flr-rec rm w/wet bar, 1/2 bath. roof deck. | $1,000,000 |
| Jun 9, 2014 | Expired or cancelled expired Jul 2016 | 2474 Broadway | merge middle & upper unit (2nd, 3rd & 4th floors) ** maher: compliance with ordinance no# 155-13 not required **Details
merge middle & upper unit (2nd, 3rd & 4th floors) ** maher: compliance with ordinance no# 155-13 not required ** | |
| Apr 14, 2014 | Completed final sign-off May 2021 | 2582 Filbert St | erect 3 stories, 1 single family, type 5.Details
erect 3 stories, 1 single family, type 5. | $3,500,000 |
| Mar 14, 2014 | Completed final sign-off Jul 2016 | 2474 Broadway | remodel (e) 3 units, relocate upper unit to lower floor, combine top 2 floors for upper unit, add roof deck, enlarge garage, full seismic upgrade, add residential elevator for upper & lower unit, no access to middle unit, serves 2 units.compliance with ordinance no.155-13 required.Details
remodel (e) 3 units, relocate upper unit to lower floor, combine top 2 floors for upper unit, add roof deck, enlarge garage, full seismic upgrade, add residential elevator for upper & lower unit, no access to middle unit, serves 2 units.compliance with ordinance no.155-13 required. | $1,750,000 |
| Mar 14, 2014 | Completed final sign-off Apr 2014 | 439 Arkansas St | replace (12) windows at front facade and repair dryrot @ (10 sq.ft.) bay windows- replace (e) alu windows with anderson 100 windows. same openings - u-factor 0.40 max.Details
replace (12) windows at front facade and repair dryrot @ (10 sq.ft.) bay windows- replace (e) alu windows with anderson 100 windows. same openings - u-factor 0.40 max. | $5,000 |
| Feb 21, 2014 | Completed final sign-off Feb 2016 | 2250 Vallejo St | revision to app #201307252743. revise stairs @ rear yard - expand roof deck in the required rear setback. infill (e) exterior stairs @ southeast corner of lot.Details
revision to app #201307252743. revise stairs @ rear yard - expand roof deck in the required rear setback. infill (e) exterior stairs @ southeast corner of lot. | $50,000 |
| Dec 23, 2013 | Completed final sign-off Nov 2016 | 561 Clipper St | vertical & horizontal addition to (e) sfd.bsmt: enlarge garage & storage. 1/fl: living rm, dinning rm, kitchen, pantry, powdr rm, family rm. 2/fl: 3 bedrms & 2 bath rms, mstr suite,laundry rm. 3/fl: rec rm & wet bar, half bath. frt & rear roof deck.Details
vertical & horizontal addition to (e) sfd.bsmt: enlarge garage & storage. 1/fl: living rm, dinning rm, kitchen, pantry, powdr rm, family rm. 2/fl: 3 bedrms & 2 bath rms, mstr suite,laundry rm. 3/fl: rec rm & wet bar, half bath. frt & rear roof deck. | $450,000 |
| Dec 6, 2013 | Completed final sign-off Aug 2020 | 2551 Greenwich St | move garage door to front, add door to entry. remodel stairs to upper unit. remodel bathrooms @ 2nd floor. add stairs to new 3rd floor. add 3rd floor to enlarge upper unit. add stairs to new roof deck.Details
move garage door to front, add door to entry. remodel stairs to upper unit. remodel bathrooms @ 2nd floor. add stairs to new 3rd floor. add 3rd floor to enlarge upper unit. add stairs to new roof deck. | $350,000 |
| Nov 6, 2013 | Completed final sign-off Nov 2014 | 2807 Clay St | revision to pa# 201102049965-s1, add grade beams @ foundation due to site conditions, add 30" retaining wall @ rear yard.Details
revision to pa# 201102049965-s1, add grade beams @ foundation due to site conditions, add 30" retaining wall @ rear yard. | $5,000 |
| Aug 15, 2013 | Completed final sign-off Jul 2014 | 776 27th St | rev. to pa#201112120518, interior work only, relocate kitchen & remodel (e) bathroom @ 2/f, revise structural per as-built conditionDetails
rev. to pa#201112120518, interior work only, relocate kitchen & remodel (e) bathroom @ 2/f, revise structural per as-built condition | $35,000 |
| Aug 12, 2013 | Completed final sign-off Sep 2014 | 1973 Filbert St | revision to appl #2012.06.18.2829 - replace (e) retaining wall along west p.l. at rear yard & replace fence.Details
revision to appl #2012.06.18.2829 - replace (e) retaining wall along west p.l. at rear yard & replace fence. | $5,000 |
| Aug 8, 2013 | Completed final sign-off Feb 2016 | 2250 Vallejo St | revision to previously approved 201211093896 & permit 201306280711; shotcrete maybe used in lieu of concrete, see concrete specs on sht s2,3,3'-0" sq.deep pads have been added @ grid line 3 due to existing field conditions. sheet s2 has been revised & revised detail has been added det 4 s3Details
revision to previously approved 201211093896 & permit 201306280711; shotcrete maybe used in lieu of concrete, see concrete specs on sht s2,3,3'-0" sq.deep pads have been added @ grid line 3 due to existing field conditions. sheet s2 has been revised & revised detail has been added det 4 s3 | $1,000 |
| Jul 25, 2013 | Completed final sign-off Feb 2016 | 2250 Vallejo St | revise main stairs, add stair & elevator. convert roof to deck, revise windows. ref 2012-11-09-3896, 2013-05-29-8063 dpw 13ie0099. no basement level - make type i ground level (see ab-005).Details
revise main stairs, add stair & elevator. convert roof to deck, revise windows. ref 2012-11-09-3896, 2013-05-29-8063 dpw 13ie0099. no basement level - make type i ground level (see ab-005). | $250,000 |
| Jun 28, 2013 | Completed final sign-off Feb 2016 | 2250 Vallejo St | revision to pa# 2012-1109-3896-foundation has been changed from framed floor to slab on grade. corresponding details have been revisedDetails
revision to pa# 2012-1109-3896-foundation has been changed from framed floor to slab on grade. corresponding details have been revised | |
| May 29, 2013 | Completed final sign-off Feb 2016 | 2250 Vallejo St | site retaining wall along drivewayDetails
site retaining wall along driveway | $40,000 |
| Mar 15, 2013 | Completed final sign-off Mar 2013 | 2151 Green St | to obtain final inspection for work approved under pa # 201109164837. all work is complete.Details
to obtain final inspection for work approved under pa # 201109164837. all work is complete. | |
| Mar 15, 2013 | Completed final sign-off Mar 2013 | 2151 Green St | to obtain final inspection for work approved under pa # 201109265460. all work is complete.Details
to obtain final inspection for work approved under pa # 201109265460. all work is complete. | |
| Mar 15, 2013 | Completed final sign-off Mar 2013 | 2151 Green St | to obtain final inspection for work approved under pa # 201109305891. all work is complete.Details
to obtain final inspection for work approved under pa # 201109305891. all work is complete. | |
| Mar 15, 2013 | Completed final sign-off Mar 2013 | 2151 Green St | to obtain final inspection for work approved under pa # 200611208121. all work is complete.Details
to obtain final inspection for work approved under pa # 200611208121. all work is complete. | |
| Jan 22, 2013 | Never finaled issued Jan 2013, no final | 414 Spruce St | revision to pa#2010-06-28-5444 revise title 24, change heating system from forced air to radiant heating.Details
revision to pa#2010-06-28-5444 revise title 24, change heating system from forced air to radiant heating. | |
| Nov 9, 2012 | Completed final sign-off Feb 2016 | 2250 Vallejo St | interior alterations, interior seismic upgrade. exterior alteration, add new garage, driveway on west side and east infill below (e) stair overhang. units merged uner pa# 2011/11/17/9172.Details
interior alterations, interior seismic upgrade. exterior alteration, add new garage, driveway on west side and east infill below (e) stair overhang. units merged uner pa# 2011/11/17/9172. | $750,000 |
| Oct 18, 2012 | Completed final sign-off Dec 2012 | 225 Woolsey St | remodel (e) bathroom (n) fixtures & tiles, remodel (e) kitchen, replace (e) cabinets, w/(n) ikea cabinets, (n0 counters, no structural workDetails
remodel (e) bathroom (n) fixtures & tiles, remodel (e) kitchen, replace (e) cabinets, w/(n) ikea cabinets, (n0 counters, no structural work | $7,500 |
| Sep 14, 2012 | Completed final sign-off Jan 2014 | 2157 Green St | for documentation purpose only. revise dbi evaluation of intial project estimate based on reduction of bldg. square footage and type of construction - initial scope of work valued @ $5m for 15,120sf, bap #200702134062 - revised scope of work bpa 201111158909 - 4,577 sf garage 7 storage, 6,045 sfDetails
for documentation purpose only. revise dbi evaluation of intial project estimate based on reduction of bldg. square footage and type of construction - initial scope of work valued @ $5m for 15,120sf, bap #200702134062 - revised scope of work bpa 201111158909 - 4,577 sf garage 7 storage, 6,045 sf | |
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 245 Euclid Av | replace (2) rotted windows sash, same kind & material & look wood casement in front.Details
replace (2) rotted windows sash, same kind & material & look wood casement in front. | $2,000 |
| Aug 23, 2012 | Completed final sign-off Aug 2013 | 71 Clipper St | excavate partial crawl space to add family room, mech room, stairs from 1st to 2nd floor, connect (e) 1st floor room.Details
excavate partial crawl space to add family room, mech room, stairs from 1st to 2nd floor, connect (e) 1st floor room. | $50,000 |
| Jun 18, 2012 | Completed final sign-off Sep 2014 | 1973 Filbert St | erect 3 stories, type 5, 1 dwelling unit residential building.Details
erect 3 stories, type 5, 1 dwelling unit residential building. | $700,000 |
| Jun 18, 2012 | Completed final sign-off Jul 2013 | 1973 Filbert St | demolish type 5, 2 stories, residential single family dwelling unit.Details
demolish type 5, 2 stories, residential single family dwelling unit. | $20,000 |
| Jun 8, 2012 | Completed final sign-off Jun 2014 | 507 Mississippi St | revisions to pa# 2006-0607-3373-s/r2 & 2011-0726-1027: remove middle wall at garage, relocate powder room at 2nd floor & add pantry at 2nd floorDetails
revisions to pa# 2006-0607-3373-s/r2 & 2011-0726-1027: remove middle wall at garage, relocate powder room at 2nd floor & add pantry at 2nd floor | |
| Jun 8, 2012 | Completed final sign-off Aug 2013 | 71 Clipper St | remodel kitchen, bathroom, laundry area & family room at 2nd floorDetails
remodel kitchen, bathroom, laundry area & family room at 2nd floor | $35,000 |
| May 9, 2012 | Completed final sign-off Nov 2012 | 2278 Bush St | remodel (e) kitchen & 2 bathrooms, relocate washer & dryer, no structural work.Details
remodel (e) kitchen & 2 bathrooms, relocate washer & dryer, no structural work. | $30,000 |