North Bay Area Corporation
- Based in
- Santa Rosa
- On San Francisco permits
- Sep 2014 to Sep 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2014 | Completed final sign-off Jan 2015 | 3883 23rd St | mold removal work: work include remove and replace existing attic insulation, cut four small holes to investigate, two holes at ceiling and two holes at walls, dimension of holes shall not exceed 6". no other work besidesthe specified work.Details
mold removal work: work include remove and replace existing attic insulation, cut four small holes to investigate, two holes at ceiling and two holes at walls, dimension of holes shall not exceed 6". no other work besidesthe specified work. | $2,000 |