Nor-Cal Scaffolding Inc.
- Based in
- Richmond
- On San Francisco permits
- Sep 2021 to Sep 2021
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2021 | Never finaled issued Feb 2022, no final | 57 Post St | in-kind facade masonry repairs of east elevation of historic mechanics institute. full assessment of necessary repair extents via scaffold removal of loose materials, followed by in-kind repair of deteriorated plaster parge coat,loose bride tie backs and lintels. e windows painted in place.Details
in-kind facade masonry repairs of east elevation of historic mechanics institute. full assessment of necessary repair extents via scaffold removal of loose materials, followed by in-kind repair of deteriorated plaster parge coat,loose bride tie backs and lintels. e windows painted in place. | $750,000 |