Nor Cal Quake Construction Inc.
- Based in
- Santa Clarita
- On San Francisco permits
- Jul 2013 to Sep 2015
- Last 24 months
- 0 permits filed
8 permits since 2000: 2 completed, 6 never finaled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2015 | Never finaled issued Sep 2015, no final | 990 Ashbury St | voluntary foundation sill plate anchorage to existing foundationDetails
voluntary foundation sill plate anchorage to existing foundation | $5,800 |
| Sep 17, 2015 | Completed final sign-off Oct 2015 | 69 Telegraph Pl | voluntary foundation sill plate anchorage to existing foundationDetails
voluntary foundation sill plate anchorage to existing foundation | $7,700 |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 3214 Jackson St | voluntary foundation sill plate anchorage. n/a for maher.Details
voluntary foundation sill plate anchorage. n/a for maher. | $11,100 |
| Sep 3, 2015 | Completed final sign-off Sep 2015 | 3872 19th St | voluntary foundation sill plate anchorage. n/a for maher.Details
voluntary foundation sill plate anchorage. n/a for maher. | $6,500 |
| May 7, 2015 | Never finaled issued May 2015, no final | 145 Mallorca Wy | voluntary bolting surface of exterior walls to exist foundation, installing steel frame at garage opening. no exterior change. maher n/a.Details
voluntary bolting surface of exterior walls to exist foundation, installing steel frame at garage opening. no exterior change. maher n/a. | $39,400 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 630 Saint Francis Bl | voluntary structural strengthening. bolting down extg walls mud sill plate to extg concrete foundation in subbasement area.Details
voluntary structural strengthening. bolting down extg walls mud sill plate to extg concrete foundation in subbasement area. | $14,500 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 348 Lombard St | voluntary structural strengthening. bolting down extg walls mud sill plate to extg concrete foundation in basement/ crawl space area.Details
voluntary structural strengthening. bolting down extg walls mud sill plate to extg concrete foundation in basement/ crawl space area. | $13,000 |
| Jul 22, 2013 | Never finaled issued Jul 2013, no final | 2225 Bay St | add steel frame to (e) front wall opening for structural improvements per plan.Details
add steel frame to (e) front wall opening for structural improvements per plan. | $19,500 |