Nobel Construction*See Notes*
- Based in
- San Mateo
- On San Francisco permits
- Oct 2015 to Jun 2020
- Last 24 months
- 0 permits filed
13 permits since 2000: 8 completed, 5 never finaled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2020 | Completed final sign-off Aug 2020 | 162 Buena Vista Tr | replace (e) front window inserts with double glazed inserts and retrofit installation of front windows in-kind. max u-factor 0.32 or better.Details
replace (e) front window inserts with double glazed inserts and retrofit installation of front windows in-kind. max u-factor 0.32 or better. | $3,500 |
| Apr 19, 2019 | Never finaled issued Apr 2019, no final | 3330 Folsom St | repair dry rotted plywood. repair of ruffter dry rotted.Details
repair dry rotted plywood. repair of ruffter dry rotted. | $1,500 |
| Apr 19, 2019 | Completed final sign-off May 2019 | 3330 Folsom St | re-roofing. ref. to building app#201904198519Details
re-roofing. ref. to building app#201904198519 | $4,500 |
| Dec 28, 2018 | Completed final sign-off Jul 2019 | 524 Clipper St | dry rot repair on front porch deck board, softly railing, installation of handrail on downstairs heading stairway @ front porch repair in kindDetails
dry rot repair on front porch deck board, softly railing, installation of handrail on downstairs heading stairway @ front porch repair in kind | $1,500 |
| Dec 28, 2018 | Never finaled issued Dec 2018, no final | 447 Visitacion Av | to comply with nov# 201892791, repair windows , cink, bathrub, eleiminate cockaroach&rodent infestation. damaged ceilings , locate & repair water damage, finalll repair sink counter , maintain (e) fire ratingDetails
to comply with nov# 201892791, repair windows , cink, bathrub, eleiminate cockaroach&rodent infestation. damaged ceilings , locate & repair water damage, finalll repair sink counter , maintain (e) fire rating | $1,000 |
| Aug 29, 2018 | Completed final sign-off Sep 2019 | 1210 Polk St | upgrade entrance door to meet ada. new 3 compartment pot sink. new hand sink. new quarry tile floor w/quarry tile cove (kitchen area) this bld is a residential hotel. units may not be converted, demolished or have their use changed without complying with chapter 41 sf admin codeDetails
upgrade entrance door to meet ada. new 3 compartment pot sink. new hand sink. new quarry tile floor w/quarry tile cove (kitchen area) this bld is a residential hotel. units may not be converted, demolished or have their use changed without complying with chapter 41 sf admin code | $10,000 |
| Apr 26, 2018 | Never finaled issued Apr 2018, no final | 1762 La Salle Av | remove wood lath & cement finish walls - 1st floor only. replace with 5/8" sheet rock with r-13 batt insulation - first floor only. electrical l& plumbing interior /kitchen + bathroom remodel - 1st floor only.Details
remove wood lath & cement finish walls - 1st floor only. replace with 5/8" sheet rock with r-13 batt insulation - first floor only. electrical l& plumbing interior /kitchen + bathroom remodel - 1st floor only. | $8,000 |
| Feb 14, 2018 | Completed final sign-off Jan 2020 | 1771 La Salle Av | remodel kitchen and bathroom in kind. repair and / or remove and replace damaged lath & plaster/sheetrock walls & ceilings. work at unit #1773 (lower; street level unit) onlyDetails
remodel kitchen and bathroom in kind. repair and / or remove and replace damaged lath & plaster/sheetrock walls & ceilings. work at unit #1773 (lower; street level unit) only | $10,000 |
| Sep 18, 2017 | Completed final sign-off May 2019 | 930 Geary St | rollup garage door. replacing equipment/appliances/furniture, and installing electrical outlets. n/a for maherDetails
rollup garage door. replacing equipment/appliances/furniture, and installing electrical outlets. n/a for maher | $3,500 |
| Feb 4, 2016 | Completed final sign-off Feb 2016 | 937 Geary St | removal of bar kitchen fixtures.Details
removal of bar kitchen fixtures. | $700 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 2314 25th Av | repave 100 sf driveway; no change to existing curb cut or landscape areas at front of houseDetails
repave 100 sf driveway; no change to existing curb cut or landscape areas at front of house | $4,500 |
| Dec 29, 2015 | Never finaled issued Dec 2015, no final | 444 Haight St | replace mudsill on the side. replace supporting outside deck post, mudsill rebolting to (e) bolts.Details
replace mudsill on the side. replace supporting outside deck post, mudsill rebolting to (e) bolts. | $1,200 |
| Oct 8, 2015 | Completed final sign-off Oct 2015 | 1478 Shafter Av | repair in kind. remove dryrotted wood from certain areas on roof and roof support. frame and create a 6" curb on the surface of newly replaced skylights. install base coat and new roofing membrane over fiber glass base and correct roofing slope at various locations. remove and replace tiles at edgeDetails
repair in kind. remove dryrotted wood from certain areas on roof and roof support. frame and create a 6" curb on the surface of newly replaced skylights. install base coat and new roofing membrane over fiber glass base and correct roofing slope at various locations. remove and replace tiles at edge | $6,000 |