Nice & Better Builder
- Based in
- Concord
- On San Francisco permits
- Apr 2012 to Apr 2015
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 2247 20th Av | replace kitchen cabinets, sink, and electric outlet, no change on walls.Details
replace kitchen cabinets, sink, and electric outlet, no change on walls. | $5,000 |
| Feb 5, 2015 | Completed final sign-off Jul 2015 | 2247 20th Av | interior remodel, enlarge laundry area at ground level, remodel existing bathroom & install new bathroom at second level.Details
interior remodel, enlarge laundry area at ground level, remodel existing bathroom & install new bathroom at second level. | $27,000 |
| Feb 12, 2013 | Completed final sign-off May 2013 | 2329 Lincoln Wy | alteration to existing ground floor per plan: 1. enlarge existing bedroom, 2. replace existing lighting. 3. provide 5/8" gypboard for property line wall, 1 - hr rated wall & replace damaged interior gypboard. 4. provide r-13 insulation. 5. new window and patio door.Details
alteration to existing ground floor per plan: 1. enlarge existing bedroom, 2. replace existing lighting. 3. provide 5/8" gypboard for property line wall, 1 - hr rated wall & replace damaged interior gypboard. 4. provide r-13 insulation. 5. new window and patio door. | $18,000 |
| May 3, 2012 | Completed final sign-off Dec 2012 | 1870 15th Av | remodel 2nd floor-1 full bathroom, 1 powder room, 1 kitchen, 3 bedrooms & 1 living room. replace window, sheetrock & insulation. no change in wall locations & no structural work. replace 4 windows & siding in kind at the rear of houseDetails
remodel 2nd floor-1 full bathroom, 1 powder room, 1 kitchen, 3 bedrooms & 1 living room. replace window, sheetrock & insulation. no change in wall locations & no structural work. replace 4 windows & siding in kind at the rear of house | $110,000 |
| May 2, 2012 | Completed final sign-off Sep 2012 | 2329 Lincoln Wy | to add 16sf 1st floor bathroom and remodel.Details
to add 16sf 1st floor bathroom and remodel. | $10,000 |
| Apr 24, 2012 | Completed final sign-off Aug 2012 | 1927 44th Av | upgrade main floor: kitchen , bathroom and replace rear side window total of three windows. not visible from street. no change on walls and openings.Details
upgrade main floor: kitchen , bathroom and replace rear side window total of three windows. not visible from street. no change on walls and openings. | $20,000 |
| Apr 19, 2012 | Completed final sign-off Aug 2012 | 1927 44th Av | to add 2 bed room, one full bathrooms,one laundry/hall on extg ground floor per plan.Details
to add 2 bed room, one full bathrooms,one laundry/hall on extg ground floor per plan. | $35,000 |