New High Protection Roofing
- Based in
- Pacifica
- On San Francisco permits
- Feb 2000 to Jun 2026
- Last 24 months
- 48 permits filed
636 permits since 2000: 570 completed, 3 in progress, 45 never finaled, 18 expired or cancelled.
Of the 45 never-finaled permits, 6 are 3 to 5 years old, 15 are 5 to 10 years old, 24 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 636.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | Completed final sign-off Jul 2026 | 1947 46th Av | reroofing in kind: flat roof, no hot works. tear off (e) roofing and install one base- sa base, sa modified bitumen 1,000 sq ft. no work to (e) roof structural sheathing. no structural work.Details
reroofing in kind: flat roof, no hot works. tear off (e) roofing and install one base- sa base, sa modified bitumen 1,000 sq ft. no work to (e) roof structural sheathing. no structural work. | $12,000 |
| Jun 16, 2026 | Completed final sign-off Jul 2026 | 3333 Jackson St | reroofing in kind: flat roof (upper and rear lower), no hot works. tear off (e) roofing & install one base- sa base, sa modified bitumen. 2,200 sq ft. no work to (e) roof structural sheathing. no structural work. no work to (e) rear deck.Details
reroofing in kind: flat roof (upper and rear lower), no hot works. tear off (e) roofing & install one base- sa base, sa modified bitumen. 2,200 sq ft. no work to (e) roof structural sheathing. no structural work. no work to (e) rear deck. | $20,000 |
| May 19, 2026 | Completed final sign-off May 2026 | 700 Naples St | reroofing no hot worksDetails
reroofing no hot works | $16,000 |
| Apr 14, 2026 | Completed final sign-off Apr 2026 | 2639 45th Av | reroofing- no torch downDetails
reroofing- no torch down | $14,000 |
| Mar 3, 2026 | Completed final sign-off Mar 2026 | 182 Graystone Tr | reroofing no hot worksDetails
reroofing no hot works | $16,000 |
| Feb 18, 2026 | Completed final sign-off Feb 2026 | 1911 20th Av | reroofing: flat roof only. flat 28 asphalt and paper, 80 torch down, modified bitumen granulate.Details
reroofing: flat roof only. flat 28 asphalt and paper, 80 torch down, modified bitumen granulate. | $12,300 |
| Feb 18, 2026 | Completed final sign-off Mar 2026 | 438 Yale St | reroofing: flat roof; tear off and install 1 base sa base, sa modified bitumen. no hot works.Details
reroofing: flat roof; tear off and install 1 base sa base, sa modified bitumen. no hot works. | $20,000 |
| Jan 23, 2026 | Completed final sign-off Feb 2026 | 677 Huron Av | reroofing no hot works, 1400 sq ft.Details
reroofing no hot works, 1400 sq ft. | $12,500 |
| Jan 23, 2026 | Completed final sign-off Mar 2026 | 163 Staples Av | reroofing, no hot works, 1800 sq ft.Details
reroofing, no hot works, 1800 sq ft. | $16,500 |
| Jan 23, 2026 | Completed final sign-off Feb 2026 | 1138 Treat Av | reroofing no hot works, 2000 sq ft.Details
reroofing no hot works, 2000 sq ft. | $19,500 |
| Jan 15, 2026 | Completed final sign-off Feb 2026 | 125 Staples Av | re-roofing no hot worksDetails
re-roofing no hot works | $21,000 |
| Jan 12, 2026 | Completed final sign-off Feb 2026 | 1767 21st Av | reroofing: flat roof (no hot works) 1300 sq ft. tear off, install 1 base sa base sa modified bitumen.Details
reroofing: flat roof (no hot works) 1300 sq ft. tear off, install 1 base sa base sa modified bitumen. | $12,000 |
| Nov 13, 2025 | Completed final sign-off Feb 2026 | 622 Precita Av | re-roofing. no hot works.Details
re-roofing. no hot works. | $14,000 |
| Oct 29, 2025 | Completed final sign-off Nov 2025 | 1162 Geneva Av | reroof (no hotworks)Details
reroof (no hotworks) | $22,000 |
| Oct 16, 2025 | Completed final sign-off Oct 2025 | 146 Beverly St | reroofing: 1500 sq ft, tear off, install 1 base 30lbs. install compsition shingles. no hot works.Details
reroofing: 1500 sq ft, tear off, install 1 base 30lbs. install compsition shingles. no hot works. | $20,000 |
| Sep 24, 2025 | Completed final sign-off Oct 2025 | 2038 Powell St | reroofing: flat roof 1600 sq ft. tear off & install 1 base sa base sa modified bitumen. no hot works.Details
reroofing: flat roof 1600 sq ft. tear off & install 1 base sa base sa modified bitumen. no hot works. | $14,000 |
| Sep 22, 2025 | Completed final sign-off Oct 2025 | 2 Hernandez Av | re-roofing flat roof 1,400 sq ft, no hotworks, tear off, install 1 base sa base sa modified bitumen.Details
re-roofing flat roof 1,400 sq ft, no hotworks, tear off, install 1 base sa base sa modified bitumen. | $11,500 |
| Sep 18, 2025 | Completed final sign-off Sep 2025 | 2844 Harrison St | re roofing: no hot works.Details
re roofing: no hot works. | $18,000 |
| Sep 2, 2025 | Completed final sign-off Sep 2025 | 222 South Hill Bl | reroofing: install 1 base 30lbs, install composition shingles (no hot works), 1800 square ftDetails
reroofing: install 1 base 30lbs, install composition shingles (no hot works), 1800 square ft | $16,000 |
| Sep 2, 2025 | Completed final sign-off Sep 2025 | 123 Staples Av | reroofing: install 1 base 30lbs install compositon shingles (no hot works), 1400 square ftDetails
reroofing: install 1 base 30lbs install compositon shingles (no hot works), 1400 square ft | $14,000 |
| Aug 28, 2025 | Completed final sign-off Sep 2025 | 158 Judson Av | reroofing: flat roof 1100 sq ft(no hotworks).tear off install 1 baseDetails
reroofing: flat roof 1100 sq ft(no hotworks).tear off install 1 base | $11,500 |
| Aug 28, 2025 | Completed final sign-off Sep 2025 | 21 Elsie St | re-roofing: tear off-no hotworks.install 1 base 30lbs,install compostition shingles 40 year guarantee.Details
re-roofing: tear off-no hotworks.install 1 base 30lbs,install compostition shingles 40 year guarantee. | $17,000 |
| Aug 19, 2025 | Completed final sign-off Sep 2025 | 2750 Divisadero St | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $20,000 |
| Aug 5, 2025 | Completed final sign-off Aug 2025 | 150 Jordan Av | re-roofing: tear off 1 base cintetic, install composition shingles, 30 yrs guarantee. no hot workDetails
re-roofing: tear off 1 base cintetic, install composition shingles, 30 yrs guarantee. no hot work | $22,000 |
| Jul 14, 2025 | Completed final sign-off Jul 2025 | 226 12th Av | re-roofing (no hotworks).Details
re-roofing (no hotworks). | $16,000 |
| Jul 10, 2025 | Completed final sign-off Jul 2025 | 1455 Powell St | re-roof. no hot works. flat roof 2,200 sq. ft. tear off, install (1) base. sa base, sa modified bitumen.Details
re-roof. no hot works. flat roof 2,200 sq. ft. tear off, install (1) base. sa base, sa modified bitumen. | $20,000 |
| Jul 8, 2025 | Completed final sign-off Jul 2025 | 126 Bridgeview Dr | re-roofing flat roof 1,600 sq ft. tear off, install 1 base sa base sa modified bitumen. no hot works.Details
re-roofing flat roof 1,600 sq ft. tear off, install 1 base sa base sa modified bitumen. no hot works. | $14,000 |
| Jun 18, 2025 | Completed final sign-off Jul 2025 | 3021 Anza St | reroofing; flat roof 800 sq ft. no hot works; tear off, install 1 base; sa base sa modified bitumenDetails
reroofing; flat roof 800 sq ft. no hot works; tear off, install 1 base; sa base sa modified bitumen | $7,500 |
| Jun 12, 2025 | Completed final sign-off Jun 2025 | 1700 31st Av | re-roofing not hotworks. flat roof 1,400 sq ft. tear off install 1 base sa base sa modified bitumen.Details
re-roofing not hotworks. flat roof 1,400 sq ft. tear off install 1 base sa base sa modified bitumen. | $12,300 |
| Jun 10, 2025 | Completed final sign-off Jun 2025 | 543 Elizabeth St | re-roofing no hot works.Details
re-roofing no hot works. | $12,000 |
| Jun 5, 2025 | Completed final sign-off Jun 2025 | 19 Barcelona Av | re roofing flat roof 2,000 sq ft. (no hot work). tear off install 1 base sa base sa modified bitumen.Details
re roofing flat roof 2,000 sq ft. (no hot work). tear off install 1 base sa base sa modified bitumen. | $18,000 |
| May 21, 2025 | Completed final sign-off Jun 2025 | 1090 Ingerson Av | reroofing with hot worksDetails
reroofing with hot works | $11,000 |
| May 5, 2025 | Completed final sign-off May 2025 | 123 Ord St | reroofing (w/ torch)Details
reroofing (w/ torch) | $8,500 |
| Mar 18, 2025 | Completed final sign-off Mar 2025 | 1473 Florida St | re-roofing with hot work. no work to (e) roof structural sheathing.Details
re-roofing with hot work. no work to (e) roof structural sheathing. | $16,000 |
| Mar 11, 2025 | Completed final sign-off Mar 2025 | 1425 11th Av | re-roofing with hot work.Details
re-roofing with hot work. | $21,000 |
| Feb 25, 2025 | Completed final sign-off Mar 2025 | 4168 Folsom St | re-roofingDetails
re-roofing | $12,000 |
| Feb 25, 2025 | Completed final sign-off Mar 2025 | 2125 Hayes St | re-roofing - torch downDetails
re-roofing - torch down | $22,000 |
| Feb 11, 2025 | Completed final sign-off Feb 2025 | 537 Persia Av | reroofing flat roof 1700 sqft install 1 base 28 lbs 1 torch base 80 lbs 1 gta bitumen 180 lbs torchDetails
reroofing flat roof 1700 sqft install 1 base 28 lbs 1 torch base 80 lbs 1 gta bitumen 180 lbs torch | $15,000 |
| Jan 21, 2025 | Completed final sign-off Jan 2025 | 20 Naglee Av | reroof- torch downDetails
reroof- torch down | $13,500 |
| Jan 21, 2025 | Completed final sign-off Feb 2025 | 131 Beverly St | reroof- torch downDetails
reroof- torch down | $17,000 |
| Jan 14, 2025 | Completed final sign-off Feb 2025 | 611 Miramar Av | reroofing, no torch down.Details
reroofing, no torch down. | $16,000 |
| Dec 16, 2024 | In progress issued Dec 2024 | 5 Juri St | reroofing- flat roof 16 sq ft. install vetumen 180 lbs torch overlayDetails
reroofing- flat roof 16 sq ft. install vetumen 180 lbs torch overlay | $12,000 |
| Dec 3, 2024 | Completed final sign-off Dec 2024 | 182 Valmar Tr | reroof (torch down)Details
reroof (torch down) | $11,000 |
| Dec 3, 2024 | Completed final sign-off Dec 2024 | 211 Cortland Av | reroofing (torch down)Details
reroofing (torch down) | $13,500 |
| Dec 3, 2024 | Completed final sign-off Jan 2025 | 350 Laguna Honda Bl | reroofing - overlay shingles install safeguard 30 underlayment paper. flat roof. install 2 coats of acrylic paint. no hot workDetails
reroofing - overlay shingles install safeguard 30 underlayment paper. flat roof. install 2 coats of acrylic paint. no hot work | $14,000 |
| Nov 8, 2024 | Completed final sign-off Nov 2024 | 2539 14th Av | re-roof with torch down, hot works.Details
re-roof with torch down, hot works. | $15,000 |
| Nov 5, 2024 | Completed final sign-off Nov 2024 | 1638 30th Av | re-roofing flat roof 128lbs tear off. 1 layer gta bitumen 180lbs 1400sqft. roof (torch work)Details
re-roofing flat roof 128lbs tear off. 1 layer gta bitumen 180lbs 1400sqft. roof (torch work) | $12,000 |
| Nov 5, 2024 | Completed final sign-off Apr 2025 | 1915 Mcallister St | reroofing. over lay, install gta 180lb grey color (torch work)Details
reroofing. over lay, install gta 180lb grey color (torch work) | $40,000 |
| Oct 4, 2024 | Completed final sign-off Oct 2024 | 2169 26th Av | re-roofing, flat roof, modified bitumen, about 18 squares.Details
re-roofing, flat roof, modified bitumen, about 18 squares. | $20,000 |
| Oct 1, 2024 | Completed final sign-off Oct 2024 | 33 Redondo St | reroofingDetails
reroofing | $9,500 |
| Sep 24, 2024 | Completed final sign-off Oct 2024 | 806 28th Av | re-roofingDetails
re-roofing | $12,000 |
| Sep 6, 2024 | Completed final sign-off Sep 2024 | 2473 San Bruno Av | re-roofingDetails
re-roofing | $14,000 |
| Sep 3, 2024 | Completed final sign-off Sep 2024 | 359 Vernon St | re-roofingDetails
re-roofing | $12,000 |
| Aug 27, 2024 | Completed final sign-off Sep 2024 | 7700 Geary Bl | reroofingDetails
reroofing | $50,000 |
| Aug 26, 2024 | Completed final sign-off Apr 2025 | 26 Elsie St | reroofingDetails
reroofing | $10,000 |
| Aug 22, 2024 | Completed final sign-off Sep 2024 | 304 Brazil Av | re-roofingDetails
re-roofing | $11,000 |
| Aug 9, 2024 | Completed final sign-off Aug 2024 | 166 London St | removal of existing flat roofing material and replace with fiberglas base layer and bitumen surface layer (about 1,600 sq. feet) above a sfr.Details
removal of existing flat roofing material and replace with fiberglas base layer and bitumen surface layer (about 1,600 sq. feet) above a sfr. | $14,000 |
| Aug 1, 2024 | Completed final sign-off Aug 2024 | 1603 Ingalls St | reroofingDetails
reroofing | $10,000 |
| Jul 29, 2024 | Completed final sign-off Aug 2024 | 100 Lomita Av | reroofDetails
reroof | $14,000 |
| Jul 1, 2024 | Completed final sign-off Jul 2024 | 718 37th Av | reroofingDetails
reroofing | $12,000 |
| Jun 20, 2024 | Completed final sign-off Jun 2024 | 2431 45th Av | re-roofingDetails
re-roofing | $12,000 |
| Jun 11, 2024 | In progress issued Jun 2024 | 31 Raymond Av | reroofingDetails
reroofing | $12,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2024 | 1344 Guerrero St | reroofingDetails
reroofing | $18,000 |
| Apr 24, 2024 | Completed final sign-off Jun 2024 | 2537 15th Av | reroofingDetails
reroofing | $13,000 |
| Apr 16, 2024 | Completed final sign-off Jun 2024 | 1544 35th Av | reroofingDetails
reroofing | $12,000 |
| Mar 25, 2024 | Completed final sign-off Apr 2024 | 614 Sanchez St | reroofing to tear off (1) base 28lbs and torch base 80lbs to replace appx 1000sf of roofing.Details
reroofing to tear off (1) base 28lbs and torch base 80lbs to replace appx 1000sf of roofing. | $11,000 |
| Mar 18, 2024 | Completed final sign-off Mar 2024 | 2435 45th Av | re-roofingDetails
re-roofing | $12,500 |
| Feb 7, 2024 | Completed final sign-off Feb 2024 | 679 14th Av | reroofingDetails
reroofing | $17,000 |
| Dec 29, 2023 | In progress issued Dec 2023 | 4225 Balboa St | reroofingDetails
reroofing | $14,000 |
| Nov 9, 2023 | Completed final sign-off Nov 2023 | 542 Yale St | reroofingDetails
reroofing | $16,000 |
| Oct 30, 2023 | Completed final sign-off Nov 2023 | 419 Campbell Av | reroofingDetails
reroofing | $10,000 |
| Oct 30, 2023 | Completed final sign-off Nov 2023 | 39 Richland Av | reroofingDetails
reroofing | $16,000 |
| Oct 12, 2023 | Completed final sign-off Oct 2023 | 2032 Judah St | reroofingDetails
reroofing | $16,000 |
| Oct 12, 2023 | Completed final sign-off Oct 2023 | 300 Campbell Av | reroofingDetails
reroofing | $12,000 |
| Oct 5, 2023 | Completed final sign-off Oct 2023 | 638 Vienna St | reroofingDetails
reroofing | $13,000 |
| Sep 22, 2023 | Completed final sign-off Sep 2023 | 1882 41st Av | reroofingDetails
reroofing | $8,000 |
| Sep 21, 2023 | Completed final sign-off Sep 2023 | 510 Myra Wy | reroofingDetails
reroofing | $11,000 |
| Sep 21, 2023 | Completed final sign-off Oct 2023 | 1727 Revere Av | reroofingDetails
reroofing | $12,000 |
| Sep 14, 2023 | Completed final sign-off Oct 2023 | 422 Lisbon St | reroofingDetails
reroofing | $8,000 |
| Aug 24, 2023 | Completed final sign-off Sep 2023 | 131 Benton Av | reroofingDetails
reroofing | $12,000 |
| Aug 8, 2023 | Completed final sign-off Aug 2023 | 761 47th Av | reroofingDetails
reroofing | $14,000 |
| Aug 1, 2023 | Completed final sign-off Sep 2023 | 1420 47th Av | reroofingDetails
reroofing | $8,000 |
| Jul 10, 2023 | Completed final sign-off Aug 2023 | 320 Baltimore Wy | reroofingDetails
reroofing | $11,000 |
| Jun 15, 2023 | Completed final sign-off Jul 2023 | 871 41st Av | re-roofing.Details
re-roofing. | $9,000 |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 337 07th Av | reroofing.Details
reroofing. | $16,000 |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 3527 Kirkham St | reroofingDetails
reroofing | $16,000 |
| Jun 6, 2023 | Completed final sign-off Aug 2023 | 2818 Ingalls St | reroofingDetails
reroofing | $13,000 |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 2536 23rd Av | reroofing.Details
reroofing. | $13,000 |
| May 25, 2023 | Completed final sign-off Jun 2023 | 409 Arkansas St | reroofingDetails
reroofing | $15,000 |
| May 25, 2023 | Completed final sign-off Jun 2023 | 2621 Judah St | reroofingDetails
reroofing | $18,000 |
| May 16, 2023 | Completed final sign-off Jun 2023 | 210 Evelyn Wy | reroofingDetails
reroofing | $14,000 |
| May 2, 2023 | Completed final sign-off May 2023 | 175 Haight St | flat roof tear off install 1 b ase fiberglass 28lbs unstall 6ta tolrch bitumen 180 lbsDetails
flat roof tear off install 1 b ase fiberglass 28lbs unstall 6ta tolrch bitumen 180 lbs | $16,000 |
| Apr 27, 2023 | Completed final sign-off May 2023 | 2468 Filbert St | reroofingDetails
reroofing | $25,000 |
| Apr 10, 2023 | Completed final sign-off May 2023 | 1178 Geneva Av | reroofing cool roof , crrc#0646-0030Details
reroofing cool roof , crrc#0646-0030 | $14,000 |
| Mar 30, 2023 | Completed final sign-off Apr 2023 | 1746 Revere Av | reroofingDetails
reroofing | $12,000 |
| Mar 30, 2023 | Completed final sign-off May 2023 | 372 Capitol Av | reroofing. flat roof, install 6 ta torch 180#, install 1-base fiberglass 28#Details
reroofing. flat roof, install 6 ta torch 180#, install 1-base fiberglass 28# | $12,000 |
| Mar 30, 2023 | Completed final sign-off May 2023 | 35 Goettingen St | reroofingDetails
reroofing | $12,000 |
| Mar 30, 2023 | Never finaled issued Mar 2023, no final | 3524 Kirkham St | reroofing. flat roof, torch 1,500 sq. ft., install 6 ta torch 180#, install 1-base fiberglass 28#Details
reroofing. flat roof, torch 1,500 sq. ft., install 6 ta torch 180#, install 1-base fiberglass 28# | $12,000 |
| Mar 3, 2023 | Completed final sign-off Apr 2023 | 161 Teresita Bl | reroofingDetails
reroofing | $15,000 |
| Mar 3, 2023 | Completed final sign-off Mar 2023 | 433 39th Av | reroofingDetails
reroofing | $13,000 |