New California Bathroom Corp
- Based in
- Temecula
- On San Francisco permits
- Jun 2025 to May 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | Completed final sign-off Jun 2026 | 161 Sweeny St | shower remodel and smaller window replacement inside bathroom.Details
shower remodel and smaller window replacement inside bathroom. | $28,000 |
| Dec 17, 2025 | In progress issued Dec 2025 | 21 Westwood Dr | bathroom remodel in kind. remove and replace shower system only. install acrylic walls and fabricated shower pan. install new shower system and update valve. no electrical or mechanical.Details
bathroom remodel in kind. remove and replace shower system only. install acrylic walls and fabricated shower pan. install new shower system and update valve. no electrical or mechanical. | $3,500 |
| Oct 14, 2025 | Completed final sign-off Nov 2025 | 180 07th St | unit#306: remove and replace tub/shower. install new acrylic shower walls and shower pan. install new shower system and update valve. change fan and add extra switch.Details
unit#306: remove and replace tub/shower. install new acrylic shower walls and shower pan. install new shower system and update valve. change fan and add extra switch. | $3,500 |
| Jun 17, 2025 | In progress issued Jun 2025 | 160 Stoneridge Ln | remove and replace tub/shower combo. install new acrylic walls and shower pan. install new valve and shower systems.Details
remove and replace tub/shower combo. install new acrylic walls and shower pan. install new valve and shower systems. | $10,000 |