Nelson Contracting
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Feb 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Sep 2026 | 561 Connecticut St | complete kitchen remodel: all new cabinets/appliances (no walls removed). 2 complete bathroom remodel, all in-kind, no walls removed. add 1 new bathroom @ 2/f (add forced vents to all baths). refinished floors, painting throughout entire interior.Details
complete kitchen remodel: all new cabinets/appliances (no walls removed). 2 complete bathroom remodel, all in-kind, no walls removed. add 1 new bathroom @ 2/f (add forced vents to all baths). refinished floors, painting throughout entire interior. | $250,000 |
| Jul 10, 2025 | Completed final sign-off Apr 2026 | 246 Romain St | 1/f garage level - recess (e) garage door and add new man door. new bathroom with new fixtures. new kitchenette with new fixtures and appliances. replace (e) 1/f fiberglass windows at rear of house. no work on basement, 2/f or roof. no structural work.Details
1/f garage level - recess (e) garage door and add new man door. new bathroom with new fixtures. new kitchenette with new fixtures and appliances. replace (e) 1/f fiberglass windows at rear of house. no work on basement, 2/f or roof. no structural work. | $130,635 |
| Feb 28, 2025 | Completed final sign-off May 2025 | 286 Romain St | basic kitchen remodel - complete demo new/upgrade electrical and plumbing as needed new cabinets, countertops, appliances keep within (e) footprintDetails
basic kitchen remodel - complete demo new/upgrade electrical and plumbing as needed new cabinets, countertops, appliances keep within (e) footprint | $50,000 |
| Sep 10, 2024 | In progress issued Oct 2024 | 62 Martha Av | front facade restoration w/ removal of (2) 2nd flr bays. replace w/ 3 panel wood windows (casement end/ fixed middle). replace (e) 2nd flr wood siding w/ hardi board siding repair exterior sheathing as required.Details
front facade restoration w/ removal of (2) 2nd flr bays. replace w/ 3 panel wood windows (casement end/ fixed middle). replace (e) 2nd flr wood siding w/ hardi board siding repair exterior sheathing as required. | $43,000 |
| Jul 8, 2024 | Completed final sign-off Sep 2024 | 235 Romain St | bathroom remodel: new bathtub, tile, cabinet, lighting, plumbing, replace existing window with fire rated at prop. line. no walls to be removed. not visible from the street.Details
bathroom remodel: new bathtub, tile, cabinet, lighting, plumbing, replace existing window with fire rated at prop. line. no walls to be removed. not visible from the street. | $47,000 |
| Jul 8, 2024 | Completed final sign-off Sep 2024 | 1200 18th St | apt c: primary bathroom remodel: include new shower pan, lighting, cabinets and tile. no wall removals.Details
apt c: primary bathroom remodel: include new shower pan, lighting, cabinets and tile. no wall removals. | $45,000 |
| Jan 8, 2024 | Completed final sign-off Feb 2025 | 62 Martha Av | replace (e) dry rot damaged cantilevered girder supporting 2nd flr overhang at front & replace front rim joists, replace post support & upgrade connection to (e) conc. pier.Details
replace (e) dry rot damaged cantilevered girder supporting 2nd flr overhang at front & replace front rim joists, replace post support & upgrade connection to (e) conc. pier. | $18,000 |
| Jul 12, 2023 | Completed final sign-off Jan 2024 | 246 Romain St | kitchen remodel- like in kind. same locationDetails
kitchen remodel- like in kind. same location | $40,000 |
| Jul 11, 2023 | Completed final sign-off May 2024 | 752 Clayton St | remodel 2 bathrooms and 1 kitchen. all in kind.Details
remodel 2 bathrooms and 1 kitchen. all in kind. | $70,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 1207 De Haro St | remove front roof deck and repair fron window per order of abatement 201967331a.Details
remove front roof deck and repair fron window per order of abatement 201967331a. | $3,500 |
| Aug 4, 2021 | Completed final sign-off Feb 2023 | 546 Arkansas St | addition of (1) master bedroom, master bathroom and architectural walk in closet at ground floor within (e) boundary of the bldg, interior remodel within (e) boundary of the bldgDetails
addition of (1) master bedroom, master bathroom and architectural walk in closet at ground floor within (e) boundary of the bldg, interior remodel within (e) boundary of the bldg | $100,000 |
| May 7, 2021 | Completed final sign-off Feb 2023 | 546 Arkansas St | exploratory demo at garage flooring at south foundation. exploratory demo at ceilings at floor 2. for engineer and future construction remodel. replace finishes in kind.Details
exploratory demo at garage flooring at south foundation. exploratory demo at ceilings at floor 2. for engineer and future construction remodel. replace finishes in kind. | $3,000 |
| Dec 8, 2020 | Completed final sign-off May 2021 | 1111 Carolina St | 2 bathroom remodels in like kind; add forced ventilaiton. kitchen remode - in like kind. no walls to be removedDetails
2 bathroom remodels in like kind; add forced ventilaiton. kitchen remode - in like kind. no walls to be removed | $30,000 |
| Aug 10, 2020 | Completed final sign-off Sep 2020 | 752 Clayton St | repair front stairs. work required less than 50%.Details
repair front stairs. work required less than 50%. | $9,000 |
| Aug 10, 2020 | Never finaled issued Aug 2020, no final | 752 Clayton St | replace upper 3 windows front with like kind. same glass coverage. to remain alike. windows to contain dgee lucs & true divided lights to match google 2019 photo.Details
replace upper 3 windows front with like kind. same glass coverage. to remain alike. windows to contain dgee lucs & true divided lights to match google 2019 photo. | $10,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2020 | 62 Chenery St | repair concrete stairs @ entry. install railingDetails
repair concrete stairs @ entry. install railing | $8,600 |
| Jul 30, 2019 | Completed final sign-off Apr 2021 | 238 Mississippi St | remodel both dwelling units (upper & lower): relocate kitchens & 2(n) baths in each unit. enclose exterior space at 1/f underneath (e) habitable space. replace windows at front facade w/(n) alum clad wood windows at (e) openingDetails
remodel both dwelling units (upper & lower): relocate kitchens & 2(n) baths in each unit. enclose exterior space at 1/f underneath (e) habitable space. replace windows at front facade w/(n) alum clad wood windows at (e) opening | $120,000 |
| Apr 30, 2019 | Completed final sign-off Sep 2019 | 754 Clayton St | complete bathroom remodel. no wall removalsDetails
complete bathroom remodel. no wall removals | $40,000 |
| Aug 31, 2018 | Completed final sign-off Feb 2020 | 1200 18th St | add private elevator, rebuild stairs, remodel bathroom. no exterior work. no additional condidioned floor areaDetails
add private elevator, rebuild stairs, remodel bathroom. no exterior work. no additional condidioned floor area | $60,000 |
| Jun 11, 2018 | Completed final sign-off Oct 2018 | 62 Chenery St | standard bathroom remodel - remove claw foot tub, add shower pan & forced ventilation 3' clr of property line, no walls removed 8'x10' footprintDetails
standard bathroom remodel - remove claw foot tub, add shower pan & forced ventilation 3' clr of property line, no walls removed 8'x10' footprint | $25,000 |
| Jun 11, 2018 | Completed final sign-off Oct 2018 | 83 Meadowbrook Dr | standard kitchen remodel - no walls removed, remove/replace cabinets w/new appliances, 10'x16' footprintDetails
standard kitchen remodel - no walls removed, remove/replace cabinets w/new appliances, 10'x16' footprint | $30,000 |
| Oct 31, 2017 | Completed final sign-off Jun 2018 | 379 Capp St | interior remodel of (e) 1 story portion of residence: kitchen, bath remodel, replacement of exterior doors and windows, rebuild e wood deck and structural footings and posts. new tankless heater and radiant floor heating.Details
interior remodel of (e) 1 story portion of residence: kitchen, bath remodel, replacement of exterior doors and windows, rebuild e wood deck and structural footings and posts. new tankless heater and radiant floor heating. | $100,000 |
| Sep 8, 2017 | Completed final sign-off Jan 2018 | 2628 Sutter St | revision to pa #2017-0731-3368 - add property line footing. new 36" ftg, 3'/2x7" psl beamDetails
revision to pa #2017-0731-3368 - add property line footing. new 36" ftg, 3'/2x7" psl beam | $3,900 |
| Jul 31, 2017 | Completed final sign-off Jan 2018 | 2628 Sutter St | to comply nov#201653811, install new foundation and footing at rear of house, new beams, floor joist, 2 windows, 1 door @ rear of house. remodel kitchen and move (e) bathroom to new location, all new led lighting in construction area.Details
to comply nov#201653811, install new foundation and footing at rear of house, new beams, floor joist, 2 windows, 1 door @ rear of house. remodel kitchen and move (e) bathroom to new location, all new led lighting in construction area. | $130,000 |
| Jul 5, 2017 | Completed final sign-off Mar 2018 | 379 Capp St | demolition of interior space only. remove lath and plaster and/or drywall, for visual inspection for architect and engineer as needed. future inteiror remodel. exploratory only to maintain fire rated areas.Details
demolition of interior space only. remove lath and plaster and/or drywall, for visual inspection for architect and engineer as needed. future inteiror remodel. exploratory only to maintain fire rated areas. | $2,000 |
| Mar 14, 2017 | Completed final sign-off Sep 2017 | 187 Robinhood Dr | master bedroom remodel -relocat alll water fixtures, add new shower panDetails
master bedroom remodel -relocat alll water fixtures, add new shower pan | $30,000 |
| Mar 14, 2017 | Completed final sign-off Jul 2017 | 4 Southern Heights Av | top floor living room -replace 2 slidings w/ new ones at rear of house; remove/replace (e) fireplace w/ new gas applicance(firebox) direct vent gas fireplace; refinish harwood floors,Details
top floor living room -replace 2 slidings w/ new ones at rear of house; remove/replace (e) fireplace w/ new gas applicance(firebox) direct vent gas fireplace; refinish harwood floors, | $30,000 |
| Sep 23, 2016 | Completed final sign-off Jan 2017 | 481 14th Av | bathroom remodel, remove tub, replace with shower pan, all new tile, new led lightng and forced ventilation. no changes to wall locations.Details
bathroom remodel, remove tub, replace with shower pan, all new tile, new led lightng and forced ventilation. no changes to wall locations. | $14,800 |
| Sep 23, 2016 | Completed final sign-off Jan 2017 | 488 Gellert Dr | kitchen remodel, remove (e) cabinets, replace with new and add all new appliances. all new led lighting, including under cab lights. connect to (e) hood vnting. no changes to wall locations.Details
kitchen remodel, remove (e) cabinets, replace with new and add all new appliances. all new led lighting, including under cab lights. connect to (e) hood vnting. no changes to wall locations. | $35,000 |
| May 25, 2016 | Completed final sign-off Sep 2016 | 740 Arkansas St | kitchen remodel, replace (e) cabinets w/new, install new appliances, add new gas line for exterior bbq, no wall removal.Details
kitchen remodel, replace (e) cabinets w/new, install new appliances, add new gas line for exterior bbq, no wall removal. | $20,000 |
| Apr 12, 2016 | Completed final sign-off May 2016 | 62 Chenery St | 1/2 bath remodel - 2 new led, new forced ventilation with humid stat. kitchen remodel - new cabinets, remove walls, new insulation, 3 new led lights, new gas shut off. new /replace existing federal pacific panel.Details
1/2 bath remodel - 2 new led, new forced ventilation with humid stat. kitchen remodel - new cabinets, remove walls, new insulation, 3 new led lights, new gas shut off. new /replace existing federal pacific panel. | $30,000 |
| Apr 12, 2016 | Completed final sign-off Jul 2016 | 895 Rhode Island St | bathroom remodel, new shower valve, sink and toilet (no pan or tub) to include led can lights & forced ventilation, with humid stat. kitchen remodel, new led can lights, gfi, new cabinets, move gas line for stove and add shut off. new gas line to new fireplace in living room and direct vent.Details
bathroom remodel, new shower valve, sink and toilet (no pan or tub) to include led can lights & forced ventilation, with humid stat. kitchen remodel, new led can lights, gfi, new cabinets, move gas line for stove and add shut off. new gas line to new fireplace in living room and direct vent. | $32,000 |
| Feb 29, 2016 | Completed final sign-off May 2016 | 1068 Carolina St | replace existing stairs and handrailing in kind (front) - 36" handrail in height; spacing not to exceed 4" picketsDetails
replace existing stairs and handrailing in kind (front) - 36" handrail in height; spacing not to exceed 4" pickets | $3,500 |
| Feb 5, 2016 | Completed final sign-off Feb 2017 | 131 Bella Vista Wy | convert (e) non-conditioned space at ground floor into habitable space, (n) bedroom, (n) bath, (n) den, (n) interior stairs connecting g/f with upper floor. (n) deck & stairs at rear yard, less than 10' above deck.Details
convert (e) non-conditioned space at ground floor into habitable space, (n) bedroom, (n) bath, (n) den, (n) interior stairs connecting g/f with upper floor. (n) deck & stairs at rear yard, less than 10' above deck. | $50,000 |
| Nov 13, 2015 | Completed final sign-off Feb 2016 | 4545 Lincoln Wy | enlarge and remodel (e) bathroom by relocating non-structural closet wallDetails
enlarge and remodel (e) bathroom by relocating non-structural closet wall | $15,208 |
| Aug 20, 2015 | Completed final sign-off Nov 2015 | 141 San Carlos St | complete kitchen and bathroom remodel. all new plumb & elect. to comply with title 24. new bathtub, cabinets 7 countertops. refinish floors. no showe panDetails
complete kitchen and bathroom remodel. all new plumb & elect. to comply with title 24. new bathtub, cabinets 7 countertops. refinish floors. no showe pan | $60,000 |
| Jul 29, 2015 | Completed final sign-off Dec 2015 | 191 Collingwood St | rev to 201507161700 - add new laundry appliances to (e) hall closet.Details
rev to 201507161700 - add new laundry appliances to (e) hall closet. | $4,000 |
| Jul 16, 2015 | Completed final sign-off Dec 2015 | 191 Collingwood St | kitchen remodel - remove all lath and plaster, new insulation, new plumbing as necessary. existing lights to remain, ceiling to remain, new appliances, relocate and extend store gas line. new cabinets and countertops, new electrical to code.Details
kitchen remodel - remove all lath and plaster, new insulation, new plumbing as necessary. existing lights to remain, ceiling to remain, new appliances, relocate and extend store gas line. new cabinets and countertops, new electrical to code. | $30,000 |
| Mar 30, 2015 | Completed final sign-off Jun 2015 | 128 Noe St | complete kitchen & bathroom remodel, no wall removals, all appliances to remain in (e) location, new shower pan in bathroom . to comply with cec 150.0 (k) 3.5Details
complete kitchen & bathroom remodel, no wall removals, all appliances to remain in (e) location, new shower pan in bathroom . to comply with cec 150.0 (k) 3.5 | $80,000 |
| Nov 18, 2014 | Completed final sign-off Dec 2014 | 101 Mateo St | kitchen remodel, replace existing cabinets, countertop and appliances, add dishwasher, no wall removals.Details
kitchen remodel, replace existing cabinets, countertop and appliances, add dishwasher, no wall removals. | $10,000 |
| Sep 3, 2014 | Completed final sign-off Nov 2014 | 3065 26th Av | complete kitchen remodel, remove wall, add beam, new cabinets, drywall, electrical, minor plumbing, all new 4" led can lights, gfi, dedicated as required.Details
complete kitchen remodel, remove wall, add beam, new cabinets, drywall, electrical, minor plumbing, all new 4" led can lights, gfi, dedicated as required. | $30,000 |
| Jul 25, 2014 | Completed final sign-off Sep 2014 | 900 Minnesota St | in unit 116, floor "1" modify area under stair, mezzanine: extend portion of (e) guardwall, add bookcase @ (e) guardwall. sprinklers deferred maher n/aDetails
in unit 116, floor "1" modify area under stair, mezzanine: extend portion of (e) guardwall, add bookcase @ (e) guardwall. sprinklers deferred maher n/a | $7,000 |
| Jul 15, 2014 | Completed final sign-off Nov 2014 | 171 Melrose Av | one bathroom remodel. new electrical 4" led lights, exhaust fan. new plumbing with tub. no showerpan. no removal of walls.Details
one bathroom remodel. new electrical 4" led lights, exhaust fan. new plumbing with tub. no showerpan. no removal of walls. | $19,000 |
| Jan 10, 2014 | Completed final sign-off Mar 2014 | 1113 Carolina St | remodel kitchen - new cabinets, new appliances, electrical and plumbing as needed. to comply with cec150(k) 8Details
remodel kitchen - new cabinets, new appliances, electrical and plumbing as needed. to comply with cec150(k) 8 | $10,000 |
| Jan 6, 2014 | Completed final sign-off Dec 2014 | 5151 Diamond Heights Bl | revision to pa# 201311061238. 1st fl: add bathroom, 2nd fl: add frieplace at living room. 3rd fl: extend walking closet, create storage room at back of garage. replace shed roof w/roof deck at master bedroom & replace window w/sliding door.Details
revision to pa# 201311061238. 1st fl: add bathroom, 2nd fl: add frieplace at living room. 3rd fl: extend walking closet, create storage room at back of garage. replace shed roof w/roof deck at master bedroom & replace window w/sliding door. | $34,000 |
| Nov 6, 2013 | Never finaled issued Nov 2013, no final | 5151 Diamond Heights Bl | full kitchen remodel, 2 full bathroom remodel, 2 shower pans, one 1/2 bath remodel, new can lights throughout, all title 24 compliance, remove and replace decorative appliance with newDetails
full kitchen remodel, 2 full bathroom remodel, 2 shower pans, one 1/2 bath remodel, new can lights throughout, all title 24 compliance, remove and replace decorative appliance with new | $60,000 |
| Oct 24, 2013 | Completed final sign-off Dec 2013 | 1111 Carolina St | repair (e) deck with new trex transcend decking, roof deck, less than 50%. comply with fs-01 for allowable material for roof deckDetails
repair (e) deck with new trex transcend decking, roof deck, less than 50%. comply with fs-01 for allowable material for roof deck | $4,500 |
| Oct 7, 2013 | Completed final sign-off May 2014 | 679 Connecticut St | add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair.Details
add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair. | $63,500 |
| Aug 19, 2013 | Completed final sign-off Dec 2013 | 171 Melrose Av | 1)kitchen remodel. 2)open extg wall between kitchen and living room.Details
1)kitchen remodel. 2)open extg wall between kitchen and living room. | $5,000 |
| Aug 8, 2013 | Completed final sign-off Oct 2013 | 379 Capp St | complete remodel of bathroom, add shower pan, add high efficiency lighting, new fan in ceiling, add plumbing and electrical in large hallway closet for washer/dryer, remove no walls. - 1st floorDetails
complete remodel of bathroom, add shower pan, add high efficiency lighting, new fan in ceiling, add plumbing and electrical in large hallway closet for washer/dryer, remove no walls. - 1st floor | $20,000 |
| Mar 15, 2013 | Completed final sign-off Apr 2013 | 377 Capp St | remodel 8'x7' bathroom - new electrical & plumbing all new fixtures, drywall, tile, shower pan, paint.Details
remodel 8'x7' bathroom - new electrical & plumbing all new fixtures, drywall, tile, shower pan, paint. | $20,000 |
| Aug 8, 2012 | Completed final sign-off Nov 2012 | 2358 28th Av | complete kitchen remodel. complete bathroom remodelDetails
complete kitchen remodel. complete bathroom remodel | $50,000 |
| May 9, 2011 | Completed final sign-off Jul 2013 | 1015 Carolina St | remove and rebuild existing exterior stair in the existing configuration build 1 hour rated fire wall at property line along rebuilt stairs.Details
remove and rebuild existing exterior stair in the existing configuration build 1 hour rated fire wall at property line along rebuilt stairs. | $10,000 |
| Apr 8, 2011 | Completed final sign-off Apr 2011 | 2533 Greenwich St | replace 2x6 roof decking with 5/4 ipe wood existing. 365 square feet.Details
replace 2x6 roof decking with 5/4 ipe wood existing. 365 square feet. | $4,200 |
| Sep 13, 2010 | Never finaled issued Sep 2010, no final | 233 Corbett Av | bath room remodel on the housekeeping unit # 233a. no wall removal, work on housingkeeping area 233aDetails
bath room remodel on the housekeeping unit # 233a. no wall removal, work on housingkeeping area 233a | $5,000 |
| Sep 10, 2009 | Completed final sign-off Apr 2010 | 317 Connecticut St | revision to p.a. 200906110299. modify (e) toilet to h.c. toilet per building inspector's request.Details
revision to p.a. 200906110299. modify (e) toilet to h.c. toilet per building inspector's request. | $25,000 |
| Jun 11, 2009 | Completed final sign-off Apr 2010 | 317 Connecticut St | existing retail (shoe store vacant space) to be converted into retail grocery store with accessary use (prep area) with hood.Details
existing retail (shoe store vacant space) to be converted into retail grocery store with accessary use (prep area) with hood. | $40,000 |
| Feb 12, 2008 | Completed final sign-off Mar 2008 | 578 Waller St | non structural kitchen remodel: replace existing cabinets and floors. replace countertops. replace range, microwave and refrig. relocate sink and dishwasher, new sink in bathroom. min 50% of kitchen light wattage must be fluorescent, provide fluorescent light or occupancy sensor in bath.Details
non structural kitchen remodel: replace existing cabinets and floors. replace countertops. replace range, microwave and refrig. relocate sink and dishwasher, new sink in bathroom. min 50% of kitchen light wattage must be fluorescent, provide fluorescent light or occupancy sensor in bath. | $20,000 |