Neat Builders Inc
- Based in
- Hayward
- On San Francisco permits
- Dec 2019 to Jun 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 600 Alabama St | revision to 2022-0525-4984: work being done in dish washing area not kitchen area as there is no cooking device and there will not be one.Details
revision to 2022-0525-4984: work being done in dish washing area not kitchen area as there is no cooking device and there will not be one. | |
| May 25, 2022 | Completed final sign-off Aug 2022 | 600 Alabama St | property was affected by water damage (2 bathrooms, kitchen and hallway). reinstall demolished tile, drywall repair (less than 50%), reinstall 2 toilets, reslap flooring, install vinyl floor that was damaged. kitchenette cabinets installation, sink installation, adding dedicated electrical line forDetails
property was affected by water damage (2 bathrooms, kitchen and hallway). reinstall demolished tile, drywall repair (less than 50%), reinstall 2 toilets, reslap flooring, install vinyl floor that was damaged. kitchenette cabinets installation, sink installation, adding dedicated electrical line for | $51,450 |
| Feb 10, 2022 | Completed final sign-off Apr 2022 | 90 Ord St | convert walk-in closet into laundry. convert part of bedroom into master bathroom. create opening for closet door in wall.Details
convert walk-in closet into laundry. convert part of bedroom into master bathroom. create opening for closet door in wall. | $63,000 |
| Oct 27, 2021 | Completed final sign-off Jul 2022 | 435 Jersey St | to obtain final inspection for work approved under pa#201912099048. all work is complete.Details
to obtain final inspection for work approved under pa#201912099048. all work is complete. | |
| Mar 16, 2020 | Completed final sign-off Aug 2021 | 2000 Grove St | revision to pa 2017-0621-9914 (soft story) moment frame different manufacturer. new engineer of record for entire retrofit.Details
revision to pa 2017-0621-9914 (soft story) moment frame different manufacturer. new engineer of record for entire retrofit. | |
| Dec 23, 2019 | Completed final sign-off Sep 2021 | 2619 Ortega St | increase headroom space at the ground level floor, electric panel upgrade. reslope and replace the main sewer line, replace foundation, layout changes. bathroom remodel at 2nd fl covent bath tub to shower.Details
increase headroom space at the ground level floor, electric panel upgrade. reslope and replace the main sewer line, replace foundation, layout changes. bathroom remodel at 2nd fl covent bath tub to shower. | $200,000 |
| Dec 9, 2019 | Expired or cancelled expired Oct 2021 | 435 Jersey St | unit 1 kitchen cabinetry replacement wood floor replacement, drywall repairs, paint. unit 2 kitchen cabinets reinstallation, hardwood floor repair, drywll repair, paintDetails
unit 1 kitchen cabinetry replacement wood floor replacement, drywall repairs, paint. unit 2 kitchen cabinets reinstallation, hardwood floor repair, drywll repair, paint | $67,000 |