N N N Construction Services
- Based in
- Millbrae
- On San Francisco permits
- Oct 2021 to Jan 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2025 | Completed final sign-off Jan 2025 | 1050 Fell St | repair dry rot, stray treds, boards, with exterior grade screws at rear, less than 50 percent repair in kind.Details
repair dry rot, stray treds, boards, with exterior grade screws at rear, less than 50 percent repair in kind. | $3,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2023 | 870 Greenwich St | 1 kitchen and 1 bathroom remodel in kind.Details
1 kitchen and 1 bathroom remodel in kind. | $50,000 |
| May 9, 2023 | Completed final sign-off Aug 2023 | 3130 Webster St | unit# 12: paint walls. bath: install vanity, bathtub, shower valves. kitchen: cabinets, countertop; kitchen remodel. light fixtures.Details
unit# 12: paint walls. bath: install vanity, bathtub, shower valves. kitchen: cabinets, countertop; kitchen remodel. light fixtures. | $20,000 |
| Apr 6, 2023 | Completed final sign-off Aug 2023 | 3130 Webster St | replace kitchen cabinets, counter sink faucets, replace bathroom, bathroom shower , toilet vanity, install new light fixtures. (unit#7). no removal of wallsDetails
replace kitchen cabinets, counter sink faucets, replace bathroom, bathroom shower , toilet vanity, install new light fixtures. (unit#7). no removal of walls | $30,000 |
| Feb 15, 2023 | Completed final sign-off Mar 2023 | 2332 Steiner St | to comply with nov# 202303086: back deck - replace a few boards, dryrot, and railing.Details
to comply with nov# 202303086: back deck - replace a few boards, dryrot, and railing. | $1,500 |
| Feb 8, 2022 | Never finaled issued Feb 2022, no final | 1948 Divisadero St | kitchen renovation - cabinets & counter. bathroom renovation - new tiles, vanity & sink.Details
kitchen renovation - cabinets & counter. bathroom renovation - new tiles, vanity & sink. | $40,000 |
| Oct 5, 2021 | Never finaled issued Oct 2021, no final | 1930 Taraval St | apt 1: to comply with 202182132 & 202182133: bath tub was leaking: replace tile/floor due to water damange. replace tub, waterproofing & sheetrock. all work in-kind: no layout changes or wall modifications.Details
apt 1: to comply with 202182132 & 202182133: bath tub was leaking: replace tile/floor due to water damange. replace tub, waterproofing & sheetrock. all work in-kind: no layout changes or wall modifications. | $3,500 |