N I R West Coast Inc
- Based in
- Vacaville
- On San Francisco permits
- Dec 2013 to Dec 2024
- Last 24 months
- 1 permit filed
12 permits since 2000: 9 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2024 | In progress issued Dec 2024 | 38 Fountain St | re-roof (no hotworks)Details
re-roof (no hotworks) | $20,700 |
| Aug 20, 2020 | Completed final sign-off Oct 2020 | 2000 Kirkham St | reroofing - remove existing 2 layers built up asphalt and ply sheets. overlay lower front entry roof. install and mechanically attach class a base sheet. install tpo system over all roof surfaces.Details
reroofing - remove existing 2 layers built up asphalt and ply sheets. overlay lower front entry roof. install and mechanically attach class a base sheet. install tpo system over all roof surfaces. | $28,000 |
| May 26, 2020 | Completed final sign-off Oct 2020 | 253 Sussex St | reroofing.Details
reroofing. | $23,560 |
| Oct 4, 2018 | Never finaled issued Oct 2018, no final | 2130 Harrison St | remove all the walk pads from (e) roof membranes surfaces. conduct on-site roof moisture survey. afterwards, install walking pads in same location.Details
remove all the walk pads from (e) roof membranes surfaces. conduct on-site roof moisture survey. afterwards, install walking pads in same location. | $61,425 |
| Sep 7, 2018 | Completed final sign-off Oct 2018 | 109 Willard North St | re-roofingDetails
re-roofing | $12,340 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 1015 Folsom St | reroofing.Details
reroofing. | $27,000 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 245 11th St | reroofingDetails
reroofing | $53,425 |
| May 25, 2016 | Completed final sign-off Jun 2016 | 2750 Lake St | reroofingDetails
reroofing | $18,060 |
| Nov 9, 2015 | Completed final sign-off Jan 2016 | 2925 Rivera St | reroofingDetails
reroofing | $10,750 |
| Sep 29, 2015 | Completed final sign-off Oct 2015 | 267 Topaz Wy | reroofingDetails
reroofing | $9,830 |
| Jan 16, 2014 | Completed final sign-off Jan 2014 | 32 Cross St | re-roofingDetails
re-roofing | $9,650 |
| Dec 31, 2013 | Completed final sign-off Aug 2014 | 1321 Revere Av | reroofingDetails
reroofing | $15,000 |