N B C Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Apr 2025
- Last 24 months
- 2 permits filed
8 permits since 2000: 5 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2025 | Completed final sign-off Nov 2025 | 1199 09th Av | barrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden.Details
barrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden. | $500,000 |
| Mar 26, 2025 | In progress issued Apr 2025 | 435 Martin Luther King Jr Dr | mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical workDetails
mitigate ada barriers at existing restrooms serving the golden gate park botanical garden. renovate & modify (e) pathway & interior restrooms & storeroom. new sinks, toilets, stalls, lighting, gate, new plumbing finishes and electrical work | $200,000 |
| Jun 28, 2023 | Completed final sign-off Jan 2024 | 1199 09th Av | revision to pa 2021-0216-4716 and 2021-0216-4730 to show revised accessible path of travel per mod. and gate replacement.Details
revision to pa 2021-0216-4716 and 2021-0216-4730 to show revised accessible path of travel per mod. and gate replacement. | |
| Jun 10, 2020 | Completed final sign-off Jan 2022 | 1 Harding Rd | replace (e), deteriorating dock with (n) accessible dock. install (n) accessible parking stall & path leading to (n) dock. install concrete pads and retaining walls for accessory storage. reconfigure (e) electrical & install (n) light pole. planting,rrigation & associated landscape improvements.Details
replace (e), deteriorating dock with (n) accessible dock. install (n) accessible parking stall & path leading to (n) dock. install concrete pads and retaining walls for accessory storage. reconfigure (e) electrical & install (n) light pole. planting,rrigation & associated landscape improvements. | $500,000 |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 1 Marina Green Dr | structural reinforcement of building. (e) structure is falling apartDetails
structural reinforcement of building. (e) structure is falling apart | $250,000 |
| Dec 12, 2017 | Completed final sign-off Oct 2018 | 320 Bowling Green Dr | work on bowling greens adjacent to the sf lawn bowling club house. work includes: replace extg wood retaining wall with concrete wall. repave nearby path and repair irrigation. n/a maherDetails
work on bowling greens adjacent to the sf lawn bowling club house. work includes: replace extg wood retaining wall with concrete wall. repave nearby path and repair irrigation. n/a maher | $120,000 |
| Oct 7, 2014 | Completed final sign-off Feb 2015 | 678 Clipper St | unit 2: opening modification on rear facade.Details
unit 2: opening modification on rear facade. | $10,000 |
| Sep 26, 2014 | Never finaled issued Sep 2014, no final | 678 Clipper St | #2 - remodel kitchen cabinet & change countertop. n owalls moved, removed or added, all layouts to remain unchanged. no flooring work.Details
#2 - remodel kitchen cabinet & change countertop. n owalls moved, removed or added, all layouts to remain unchanged. no flooring work. | $1,000 |