N B A Systems
- Based in
- Oakland
- On San Francisco permits
- Mar 2002 to May 2009
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2009 | Completed final sign-off Jun 2009 | 745 Fulton St | renew pa# 2008/07/09/6276 to obtain final inspection. all work has been completed.Details
renew pa# 2008/07/09/6276 to obtain final inspection. all work has been completed. | |
| Jul 9, 2008 | Never finaled issued Jul 2008, no final | 745 Fulton St | replace handrail @ front stairs way in kind. 34" to 38" above tread.Details
replace handrail @ front stairs way in kind. 34" to 38" above tread. | $7,000 |
| Mar 20, 2002 | Completed final sign-off May 2002 | 765 Fulton St | replace support beam under balcony.in-kind or better redwood or pressure treated. connected via boltDetails
replace support beam under balcony.in-kind or better redwood or pressure treated. connected via bolt | $900 |