Muriel Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Mar 2007
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2007 | Never finaled issued Mar 2007, no final | 450 Urbano Dr | due to fire in residence, the following work will be done: electrical, plumbing, plasting, hardwood floors, painting, & gas.Details
due to fire in residence, the following work will be done: electrical, plumbing, plasting, hardwood floors, painting, & gas. | $60,000 |
| Dec 13, 2006 | Completed final sign-off Apr 2007 | 457 Collingwood St | alter existing staircase to provide headroom replace wall and clg finishes on existing lower floor update electrical in existing lower floor rooms replace existing windows and exterior doors change existing storage room to family roomDetails
alter existing staircase to provide headroom replace wall and clg finishes on existing lower floor update electrical in existing lower floor rooms replace existing windows and exterior doors change existing storage room to family room | $20,000 |
| Nov 27, 2006 | Completed final sign-off Dec 2006 | 450 Monticello St | replace (3) windows in rear of house. same size & location.Details
replace (3) windows in rear of house. same size & location. | $2,000 |
| Oct 31, 2006 | Completed final sign-off Jan 2007 | 450 Monticello St | exploration & repair of dry rot in rear of house. house will look exactly the same after completion.Details
exploration & repair of dry rot in rear of house. house will look exactly the same after completion. | $2,500 |
| Oct 17, 2006 | Completed final sign-off Oct 2006 | 215 29th St | work to comply with 3r-4365 for condo conversion.Details
work to comply with 3r-4365 for condo conversion. | $4,000 |
| Aug 15, 2006 | Completed final sign-off Oct 2006 | 215 29th St | to renew app #200411098874Details
to renew app #200411098874 | $1,000 |
| Mar 4, 2005 | Completed final sign-off Apr 2005 | 135 Corona St | remodel bathroom to studs, replace toilet, tub, sink & tile.Details
remodel bathroom to studs, replace toilet, tub, sink & tile. | $10,000 |
| Jan 14, 2005 | Completed final sign-off May 2005 | 180 Miraloma Dr | remove & replace w/brick to match to existing; the bricks are just the finishing of the stairs. replDetails
remove & replace w/brick to match to existing; the bricks are just the finishing of the stairs. repl | $8,000 |
| Nov 9, 2004 | Expired or cancelled expired Oct 2006 | 215 29th St | dry rot in front stairs back stairs water heater door replace trids holds open siding replace in kinDetails
dry rot in front stairs back stairs water heater door replace trids holds open siding replace in kin | $12,000 |
| Jan 29, 2004 | Completed final sign-off May 2004 | 624 Castro St | remodeling of two kitchens new cabinets, counters, stoves, dishwashers, new lightring, flooring sinDetails
remodeling of two kitchens new cabinets, counters, stoves, dishwashers, new lightring, flooring sin | $21,000 |
| Dec 22, 2003 | Completed final sign-off May 2004 | 624 Castro St | exterior stair replaement (in kind)Details
exterior stair replaement (in kind) | $10,000 |
| Dec 19, 2003 | Completed final sign-off Apr 2004 | 99 Ord St | remodel bathroom-new tub, toilet, fan light,sink tile above bath tub. no structure alterations.Details
remodel bathroom-new tub, toilet, fan light,sink tile above bath tub. no structure alterations. | $10,000 |
| May 23, 2003 | Completed final sign-off Aug 2003 | 2117 Bush St | remodeling of extng kitchen,new cabinets,flooring,countertops,new sink,lighting,replacement ofDetails
remodeling of extng kitchen,new cabinets,flooring,countertops,new sink,lighting,replacement of | $55,000 |
| Dec 13, 2002 | Completed final sign-off May 2003 | 818 Teresita Bl | remodeling upp-fl kitchen & bathrm, new cabinets , sink, stove. refrigerator & kitchen, new sink, tDetails
remodeling upp-fl kitchen & bathrm, new cabinets , sink, stove. refrigerator & kitchen, new sink, t | $28,000 |
| Mar 29, 2002 | Completed final sign-off May 2002 | 215 29th St | remodel bath room, new tub, tile fanDetails
remodel bath room, new tub, tile fan | $8,000 |
| Jun 4, 2001 | Completed final sign-off Jul 2001 | 215 29th St | remodel(e) bath @top fl, new tub/sink/toilet/exhause fan, replace window on side at rear of bldgDetails
remodel(e) bath @top fl, new tub/sink/toilet/exhause fan, replace window on side at rear of bldg | $15,000 |
| Mar 28, 2001 | Completed final sign-off Jul 2001 | 300 Hill St | remodel of bathroom and kitchen in same footprint, no new wallsDetails
remodel of bathroom and kitchen in same footprint, no new walls | $25,000 |
| Jan 17, 2001 | Completed final sign-off Mar 2001 | 15 Quintara St | removal of existing counter tops kitchen, replacement with corion counter tops, upgrade lighting inDetails
removal of existing counter tops kitchen, replacement with corion counter tops, upgrade lighting in | $7,500 |
| Nov 21, 2000 | Completed final sign-off Jan 2001 | 292 Juanita Wy | remodeling of upper bathroom new vanity 2 sinks change of lighting.Details
remodeling of upper bathroom new vanity 2 sinks change of lighting. | $8,000 |