13 permits since 2000: 5 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 88 King St | unit 612 remodeling 2 bathrooms. bathroom 1: tub to standup shower conversion. and bedroom floors carpet to lvp. paint room, change toilet and new powered medicine cabinet wall mounted. bathroom 2: like for like . placing new tiles, keeping the tub but replacing plumbing fixtures same location.Details
unit 612 remodeling 2 bathrooms. bathroom 1: tub to standup shower conversion. and bedroom floors carpet to lvp. paint room, change toilet and new powered medicine cabinet wall mounted. bathroom 2: like for like . placing new tiles, keeping the tub but replacing plumbing fixtures same location. | $55,000 |
| Jul 28, 2026 | In progress filed Jul 2026, not yet issued | 31 Gaviota Wy | remodel a bathroom upstairs in kind except tub to shower pan with curb conversion. no drains to be moved only new diverter box for new shower fixtures. adding a heated towel rack. approx. 42 sq ft. add new exhaust fan.Details
remodel a bathroom upstairs in kind except tub to shower pan with curb conversion. no drains to be moved only new diverter box for new shower fixtures. adding a heated towel rack. approx. 42 sq ft. add new exhaust fan. | $32,000 |
| Feb 20, 2026 | Completed final sign-off Apr 2026 | 17 Warren Dr | work is seperate from 202511109313: remodel of bathroom 2nd flr hallway before master bedroom. remodel stand up shower like for like, changing counter top, sink, ceiling fan, lights,vanity lights, replacing toilet, new drywall and purple xp drywall. denshield wall board water proofing.Details
work is seperate from 202511109313: remodel of bathroom 2nd flr hallway before master bedroom. remodel stand up shower like for like, changing counter top, sink, ceiling fan, lights,vanity lights, replacing toilet, new drywall and purple xp drywall. denshield wall board water proofing. | $22,000 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 17 Warren Dr | remodeling existing bathroom like for like with exception to transforming existing tub to a standup shower format. installing a new fan with a light on ceiling. installing one new outlet for use in toilet area.Details
remodeling existing bathroom like for like with exception to transforming existing tub to a standup shower format. installing a new fan with a light on ceiling. installing one new outlet for use in toilet area. | $24,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 445 Francisco St | unit 103: remodeling of bathroom including tiles, replacing of plumbing, and electrical fixtures, drywall and and painting, tub to be replaced with shower.Details
unit 103: remodeling of bathroom including tiles, replacing of plumbing, and electrical fixtures, drywall and and painting, tub to be replaced with shower. | $24,000 |
| Aug 8, 2025 | Expired or cancelled withdrawn Aug 2025 | 445 Francisco St | bathroom like for like tub to stand up shower conversiom. replace (e) ceiling fan w/ new unit and recessed lights. install new recessed waterproof ceiling light and shower pan area. new toilet, vanity cab, vanity mirror, vanity lights, new tiles on 42 sq. ft. floors & new tiles behind vanity 48 sq.Details
bathroom like for like tub to stand up shower conversiom. replace (e) ceiling fan w/ new unit and recessed lights. install new recessed waterproof ceiling light and shower pan area. new toilet, vanity cab, vanity mirror, vanity lights, new tiles on 42 sq. ft. floors & new tiles behind vanity 48 sq. | $24,000 |
| Jun 20, 2025 | In progress issued Jun 2025 | 281 Chenery St | seismic upgrade for backyard structure. the criple walls studs ate to tall(78")as max to apply standard s1&s2 residential plan requires a max height of 72". as such, i hired a professional engineer (pe) to draw up recommeded plan of action for contractor to apply & that with theDetails
seismic upgrade for backyard structure. the criple walls studs ate to tall(78")as max to apply standard s1&s2 residential plan requires a max height of 72". as such, i hired a professional engineer (pe) to draw up recommeded plan of action for contractor to apply & that with the | $17,000 |
| May 14, 2025 | Completed final sign-off May 2025 | 2865 Jackson St | removal of (e) slab on front 3 steps (entry level) with new tiles of same material . to abate nov 202537487Details
removal of (e) slab on front 3 steps (entry level) with new tiles of same material . to abate nov 202537487 | $3,000 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 307 Banks St | converting tub bathroom into standup shower. install tile floor, install new niche and curb, install new toilet vanity and vanity light and new mirror. install wall mount cabinets for storage above toilet. install new radiant heating on floor. install new shower wall valves and waterproofing surrounDetails
converting tub bathroom into standup shower. install tile floor, install new niche and curb, install new toilet vanity and vanity light and new mirror. install wall mount cabinets for storage above toilet. install new radiant heating on floor. install new shower wall valves and waterproofing surroun | $22,000 |
| Jan 21, 2025 | In progress issued Jan 2025 | 77 Norton St | install 5 new windows to replace (e) windows. reduce size of bathroom windows, new siding to match (e). install new low-e block frame windows. additional work to pa 202410092678. all windows not street visible.Details
install 5 new windows to replace (e) windows. reduce size of bathroom windows, new siding to match (e). install new low-e block frame windows. additional work to pa 202410092678. all windows not street visible. | $1,000 |
| Oct 9, 2024 | Completed final sign-off Nov 2024 | 2185 Bush St | unit #316: remodel (e) bathroom (45 sq ft) w/ new floor and wall tiles, new shower valve fixtures w/ diverter, new toilet, new vanity w/ countertop and vanity light; new fan light w/ new sensor switches and new gfci outlet on (e) gfci line. tub to remain. all drains remain. vanity plumbing remains.Details
unit #316: remodel (e) bathroom (45 sq ft) w/ new floor and wall tiles, new shower valve fixtures w/ diverter, new toilet, new vanity w/ countertop and vanity light; new fan light w/ new sensor switches and new gfci outlet on (e) gfci line. tub to remain. all drains remain. vanity plumbing remains. | $16,500 |
| Oct 9, 2024 | In progress issued Oct 2024 | 77 Norton St | demo: remove tub, all 3 sides of tiled walls, remove and replace (e) toilet and sink. build back: install new backerboard, install new schluter kerdi board shower niche, install schluter kerdi shower curb and shower kit w/ drain cover on (e) drain location. not moving drains for sink vanity of newDetails
demo: remove tub, all 3 sides of tiled walls, remove and replace (e) toilet and sink. build back: install new backerboard, install new schluter kerdi board shower niche, install schluter kerdi shower curb and shower kit w/ drain cover on (e) drain location. not moving drains for sink vanity of new | $8,000 |
| Mar 20, 2024 | In progress issued Mar 2024 | 7515 Geary Bl | installing: new floor tiles, new shoer wall tiles, new led vanity mirror, new bench in shower enclosure, new fan, new recessed outlets behind vanity mirror. handicap grab bars. replacing (e) toilet, vanity cab, vanity mirror receptical switches and (e) gfci outlets, tiles, floor and wall. showerDetails
installing: new floor tiles, new shoer wall tiles, new led vanity mirror, new bench in shower enclosure, new fan, new recessed outlets behind vanity mirror. handicap grab bars. replacing (e) toilet, vanity cab, vanity mirror receptical switches and (e) gfci outlets, tiles, floor and wall. shower | $25,000 |