Msa Framing
- Based in
- San Rafael
- On San Francisco permits
- Aug 2025 to Sep 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 2 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 23 Grant Av | 6/f: demo small sections and partition wall. new partition wall with counter and cabinets. refinish existing flooring. replace sink and toilet. new outlets, new book shelfs, new office desks, new cabinets and paint the place. electrical deferred - electric sheets reference onlyDetails
6/f: demo small sections and partition wall. new partition wall with counter and cabinets. refinish existing flooring. replace sink and toilet. new outlets, new book shelfs, new office desks, new cabinets and paint the place. electrical deferred - electric sheets reference only | $50,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 2438 Clay St | new ceiling trim, demolition 13 location for new ceiling chandeiliers, new blocking for electrical box backing. drywall patch, paint touchup.Details
new ceiling trim, demolition 13 location for new ceiling chandeiliers, new blocking for electrical box backing. drywall patch, paint touchup. | $25,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 3404 Clay St | general dryrot repairs@ rear stairs in kind, less than 50%, and at window/door openings as needed for inkind replacement 10 new windows replace (e) openings (4 front, 4 rear, 2 garage lv). 1 patio door (e) opening.Details
general dryrot repairs@ rear stairs in kind, less than 50%, and at window/door openings as needed for inkind replacement 10 new windows replace (e) openings (4 front, 4 rear, 2 garage lv). 1 patio door (e) opening. | $30,000 |
| Apr 24, 2026 | In progress issued Jun 2026 | 3294 Clay St | unit 6: additional work to the permit 202510207713. reconfigure existing kitchen roof to a single slope and 2 replacement casement double panel windows.Details
unit 6: additional work to the permit 202510207713. reconfigure existing kitchen roof to a single slope and 2 replacement casement double panel windows. | $25,000 |
| Feb 12, 2026 | Completed final sign-off Aug 2026 | 3294 Clay St | unit# 6: revision to pa# 2025-1020-7713: new kitchen cabinetsDetails
unit# 6: revision to pa# 2025-1020-7713: new kitchen cabinets | $5,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 2440 Clay St | blow in insulation to insulation ref pa 202508132938Details
blow in insulation to insulation ref pa 202508132938 | $4,000 |
| Oct 20, 2025 | Completed final sign-off Aug 2026 | 3294 Clay St | unit #6: refinish floors, replace (e) windows retrofit street facing, plumbing, electrical, hvac, carpentry, exterior 2 deck including railings. 2 bathroom replace in-kind. hvac: 2 fans, electrical heater, exterior dormer.Details
unit #6: refinish floors, replace (e) windows retrofit street facing, plumbing, electrical, hvac, carpentry, exterior 2 deck including railings. 2 bathroom replace in-kind. hvac: 2 fans, electrical heater, exterior dormer. | $250,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 2440 Clay St | reconfigure 3 bathrooms, kitchen , 1 door ways, remove (e) north side kitchen wall, replace knob and tubeDetails
reconfigure 3 bathrooms, kitchen , 1 door ways, remove (e) north side kitchen wall, replace knob and tube | $150,000 |