Mount Street Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2021 to Aug 2025
- Last 24 months
- 3 permits filed
10 permits since 2000: 7 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2025 | In progress issued Dec 2025 | 943 Sanchez St | units 943 and 945- construct 3 stop elevator at north lightwell. construct deck and firewall at south light well. replace rear deck rail; and stair to grade. interior remodel at both units include (e) kitchen , 2 full bathrooms, and powder room at each unit. (n) skylight at upper unitDetails
units 943 and 945- construct 3 stop elevator at north lightwell. construct deck and firewall at south light well. replace rear deck rail; and stair to grade. interior remodel at both units include (e) kitchen , 2 full bathrooms, and powder room at each unit. (n) skylight at upper unit | $700,000 |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 5 Las Villas Ct | like for like bathroom remodel.Details
like for like bathroom remodel. | $20,000 |
| May 28, 2025 | Completed final sign-off Aug 2025 | 378 Chestnut St | 2 bathroom remodels like for likeDetails
2 bathroom remodels like for like | $60,000 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 3192 Sacramento St | remodel bathroom & laundry hook ups, new wiring in bathroomDetails
remodel bathroom & laundry hook ups, new wiring in bathroom | $55,000 |
| Feb 16, 2023 | Never finaled issued Mar 2023, no final | 7 Edna St | exploritory work to determine the following: orientation size and spacing of ceiling framing at garage level. exisint foundation size and embedded depth at existing grade level. thickness of slab on grade at garage level. if any excavation, to be less than 50 cubic yardsDetails
exploritory work to determine the following: orientation size and spacing of ceiling framing at garage level. exisint foundation size and embedded depth at existing grade level. thickness of slab on grade at garage level. if any excavation, to be less than 50 cubic yards | $3,000 |
| Nov 23, 2022 | Never finaled issued Nov 2022, no final | 2101 Baker St | unit #3: remodel bathroom- toilet same location, sink same and replace tub with shower stall. non structural.Details
unit #3: remodel bathroom- toilet same location, sink same and replace tub with shower stall. non structural. | $15,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 1070 Green St | unit 103: remodel bathroom remove and replace sink countertop, tiolet, and tub/ shower valve, new fan and light switches, tile walls in tub/ shower and floor throughout bathroom.Details
unit 103: remodel bathroom remove and replace sink countertop, tiolet, and tub/ shower valve, new fan and light switches, tile walls in tub/ shower and floor throughout bathroom. | $5,000 |
| May 17, 2022 | Completed final sign-off Nov 2023 | 1516 Guerrero St | commencement of work not started under previously approved permit appication pa# 201604144784.Details
commencement of work not started under previously approved permit appication pa# 201604144784. | $25,000 |
| Dec 21, 2021 | Completed final sign-off May 2022 | 540 Clement St | tenant improvement to e bar. demo and replace e bar seating, fixtures and finishes. add new bar framing, casework, equip, fixtures and finishes. new wall and ceiling finishes and new flooring throughout. accessibility uprgrades to entry and toilet room. comply with nov 202185187Details
tenant improvement to e bar. demo and replace e bar seating, fixtures and finishes. add new bar framing, casework, equip, fixtures and finishes. new wall and ceiling finishes and new flooring throughout. accessibility uprgrades to entry and toilet room. comply with nov 202185187 | $122,000 |
| Dec 3, 2021 | Completed final sign-off Mar 2022 | 1290 09th Av | renovate front service counterDetails
renovate front service counter | $8,000 |