Monolith Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Apr 2026
- Last 24 months
- 1 permit filed
20 permits since 2000: 15 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2026 | In progress issued May 2026 | 349 07th Av | recommencement and completion of work approved under pa 202207208940Details
recommencement and completion of work approved under pa 202207208940 | $80,000 |
| Jul 21, 2023 | Completed final sign-off Nov 2023 | 850 Grant Av | to comply with bid nov#20o2308482 dated 5/23/2023, restore decorative sheet metal piece @ face of wall above 3/f front of building.Details
to comply with bid nov#20o2308482 dated 5/23/2023, restore decorative sheet metal piece @ face of wall above 3/f front of building. | $7,000 |
| Apr 18, 2023 | Never finaled issued Apr 2023, no final | 349 07th Av | to obtain final inspection for work approved under pa# 202101052118 and 8613860. all work is complete.Details
to obtain final inspection for work approved under pa# 202101052118 and 8613860. all work is complete. | |
| Jul 20, 2022 | Never finaled issued Mar 2023, no final | 349 07th Av | add an adu per ordinance 162-62 on 1st fl. add living room,kitchen, dining area,,one bedroom,one office & two 3 fixture bathrooms.Details
add an adu per ordinance 162-62 on 1st fl. add living room,kitchen, dining area,,one bedroom,one office & two 3 fixture bathrooms. | $65,000 |
| Aug 13, 2021 | Completed final sign-off Dec 2022 | 46 Iris Av | interior remodel convert e bath into 2 new smaller baths on 3rd fl. no structural workDetails
interior remodel convert e bath into 2 new smaller baths on 3rd fl. no structural work | $12,000 |
| Mar 2, 2021 | Never finaled issued Mar 2021, no final | 349 07th Av | to obtain final inspection for work approved under permit application # 8613860. all work is completed.Details
to obtain final inspection for work approved under permit application # 8613860. all work is completed. | |
| Feb 12, 2021 | Completed final sign-off Feb 2022 | 46 Iris Av | remove non-bearing walls between dining room and kitchen at unit 1 on second floor.Details
remove non-bearing walls between dining room and kitchen at unit 1 on second floor. | $10,000 |
| Feb 5, 2021 | Completed final sign-off Apr 2022 | 46 Iris Av | to remodel a bathroom and a kitchen in 2nd fl unit 46. no new wall and no exisitng wall relocation. new lighting shall comply w/ cec 150.0 (k)3 & (k)sDetails
to remodel a bathroom and a kitchen in 2nd fl unit 46. no new wall and no exisitng wall relocation. new lighting shall comply w/ cec 150.0 (k)3 & (k)s | $25,000 |
| Jan 5, 2021 | Never finaled issued Mar 2021, no final | 349 07th Av | revision to pa# 8613860. document as-built stucco finish exterior wall at front facade on 2nd & 3rd fl. document as-built bedroom & storage on 3rd fl.Details
revision to pa# 8613860. document as-built stucco finish exterior wall at front facade on 2nd & 3rd fl. document as-built bedroom & storage on 3rd fl. | |
| Sep 27, 2013 | Completed final sign-off Mar 2014 | 133 Ofarrell St | erect 1 non-electric, wall, single faced sign.Details
erect 1 non-electric, wall, single faced sign. | $1,500 |
| Sep 27, 2013 | Completed final sign-off Mar 2014 | 133 Ofarrell St | erect 1 electric, projecting, double faced sign.Details
erect 1 electric, projecting, double faced sign. | $3,000 |
| Jul 9, 2013 | Completed final sign-off Dec 2013 | 133 Ofarrell St | new storefront doors + awning + windows.Details
new storefront doors + awning + windows. | $10,000 |
| May 16, 2012 | Completed final sign-off Jun 2012 | 90 Charter Oak Av | revision to appl #2011.01.03.7743 - revised disabled access checklist, revised form c: disable access 20% & unreasonable hardship form - revise layout to unisex bathroom.Details
revision to appl #2011.01.03.7743 - revised disabled access checklist, revised form c: disable access 20% & unreasonable hardship form - revise layout to unisex bathroom. | |
| Jan 3, 2011 | Completed final sign-off Jun 2012 | 90 Charter Oak Av | restore existing office space by replacing all fire damaged, walls, ceiling gyp bd and finishes. modify e toilet room for ada access, patch exterior wall damaged by fireDetails
restore existing office space by replacing all fire damaged, walls, ceiling gyp bd and finishes. modify e toilet room for ada access, patch exterior wall damaged by fire | $4,000 |
| Jul 6, 2010 | Completed final sign-off Jul 2010 | 691 Ofarrell St | to comply with his nov# 201053768 dated 6.29.10 of item# 2, to replace one stringer of the stairs at front lobby not visible from the street. between 1st and 2nd floor. work is less than 50%.Details
to comply with his nov# 201053768 dated 6.29.10 of item# 2, to replace one stringer of the stairs at front lobby not visible from the street. between 1st and 2nd floor. work is less than 50%. | $800 |
| Jul 6, 2010 | Completed final sign-off Jul 2010 | 1870 Washington St | to complywith his nov# 201050929 dated 6/10/2010 item# 2. replace roted wood of the stairs on 4tyh floor at rear. work is less than 50%.Details
to complywith his nov# 201050929 dated 6/10/2010 item# 2. replace roted wood of the stairs on 4tyh floor at rear. work is less than 50%. | $1,000 |
| Jan 5, 2010 | Completed final sign-off Apr 2010 | 239 Powell St | remodel existing safe. work to include new cabinetry, lighting, equipment. sprinkler and hoodunder separate permit.Details
remodel existing safe. work to include new cabinetry, lighting, equipment. sprinkler and hoodunder separate permit. | $44,000 |
| Dec 24, 2008 | Completed final sign-off Feb 2009 | 522 Ellington Av | to comply with n.o.v. 200885644. add 1/2 bathroom @ ground floor only. ground floor approved under appl. 200711027210.Details
to comply with n.o.v. 200885644. add 1/2 bathroom @ ground floor only. ground floor approved under appl. 200711027210. | $3,800 |
| Aug 22, 2008 | Completed final sign-off Feb 2009 | 647 San Jose Av | at unit #647, @ 3rd fl: kitchen & bathroom remodel, and add half bathroom, no structure change.Details
at unit #647, @ 3rd fl: kitchen & bathroom remodel, and add half bathroom, no structure change. | $15,000 |
| May 23, 2008 | Completed final sign-off Dec 2008 | 182 Cayuga Av | ground fl remodel: add one storage, one family rm, one guest rm and a bathrm.Details
ground fl remodel: add one storage, one family rm, one guest rm and a bathrm. | $35,000 |