Mone Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Apr 2019
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2019 | Completed final sign-off May 2019 | 862 Wisconsin St | comply with nov 201836691. removal of kitchen to revert to last approved use as shown in pa 201401075764. remove shower on first floor living space. remove wet bar in rear cottage.Details
comply with nov 201836691. removal of kitchen to revert to last approved use as shown in pa 201401075764. remove shower on first floor living space. remove wet bar in rear cottage. | $600 |
| Nov 29, 2018 | Completed final sign-off Aug 2019 | 910 Valencia St | adding dressing rooms and storage room for (e) retail at 1st flr. installation of lighting fixtures. barrier removal for interior ramp, restroom & front entry. ref pa's 201806010810 and 201806010827.Details
adding dressing rooms and storage room for (e) retail at 1st flr. installation of lighting fixtures. barrier removal for interior ramp, restroom & front entry. ref pa's 201806010810 and 201806010827. | $8,000 |
| Sep 5, 2018 | Completed final sign-off Mar 2019 | 1909 Vallejo St | revision of pa# 201808157409, windows to side of building will be finished in wood. vinyl, 7 windows. repair of roof drain of rear of building window replacements. reinstall back yard lights and outlets not visible to from the street.Details
revision of pa# 201808157409, windows to side of building will be finished in wood. vinyl, 7 windows. repair of roof drain of rear of building window replacements. reinstall back yard lights and outlets not visible to from the street. | $3,000 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 1909 Vallejo St | repair of existing roof deck at rear < 50%. replacement of 5 wood casement windows at side. repair of dry rot & stucco finish around lower level front window - replacement of (e) vinyl slider to be under separate permit. no other work. u factor max. .32Details
repair of existing roof deck at rear < 50%. replacement of 5 wood casement windows at side. repair of dry rot & stucco finish around lower level front window - replacement of (e) vinyl slider to be under separate permit. no other work. u factor max. .32 | $10,000 |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 1909 Vallejo St | repair in kind, stucco, any dry rot found mainly to the rear of building approx. 150 sf.Details
repair in kind, stucco, any dry rot found mainly to the rear of building approx. 150 sf. | $8,000 |
| Jan 26, 2018 | Completed final sign-off Oct 2018 | 1909 Vallejo St | repair of fence to front of house, in-kind, same height, approx. 66 sf. repair siding due to dry rot to side of building. approx 90 sf. repair to be in-kind, approx. 9" width board.Details
repair of fence to front of house, in-kind, same height, approx. 66 sf. repair siding due to dry rot to side of building. approx 90 sf. repair to be in-kind, approx. 9" width board. | $3,500 |
| Dec 14, 2017 | Completed final sign-off Oct 2018 | 2520 Clay St | repair of siding and any dry rot to front of building, approx. 200 sq. ft.Details
repair of siding and any dry rot to front of building, approx. 200 sq. ft. | $2,600 |