Momsen Construction Dev Inc
- Based in
- Lafayette
- On San Francisco permits
- Feb 2000 to Feb 2014
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2014 | Completed final sign-off Mar 2014 | 1100 California St | revision to pa#2013-02-26-0916. equivalent facilitation hardship per ab-12 use of power door operators in lieu of level landings @ doors. compliance w/ ordinance no. 155-13 not required. excavation <50 cu.yd.Details
revision to pa#2013-02-26-0916. equivalent facilitation hardship per ab-12 use of power door operators in lieu of level landings @ doors. compliance w/ ordinance no. 155-13 not required. excavation <50 cu.yd. | $8,000 |
| Jan 7, 2014 | Completed final sign-off Apr 2014 | 1051 Taylor St | mechanical work only. ref arch application #201310018190. n/a for the maher ordinance no. 155-13Details
mechanical work only. ref arch application #201310018190. n/a for the maher ordinance no. 155-13 | $20,000 |
| Oct 1, 2013 | Completed final sign-off Apr 2014 | 1051 Taylor St | kitchen remodel in chapter house, grace cathedral, mechanical work on sep permit, ul300 suppression system for type 1 hood, vif; fa sprinklers on sep permit. jjcDetails
kitchen remodel in chapter house, grace cathedral, mechanical work on sep permit, ul300 suppression system for type 1 hood, vif; fa sprinklers on sep permit. jjc | $478,000 |
| Jun 12, 2013 | Completed final sign-off Jul 2013 | 1100 California St | saw cut stairs, remve approx 1000ft of stair for investigative reasons, depht of rebar & existing water proof conditions, investigate for dry rot, existing & egress wil not be effected under this scope of workDetails
saw cut stairs, remve approx 1000ft of stair for investigative reasons, depht of rebar & existing water proof conditions, investigate for dry rot, existing & egress wil not be effected under this scope of work | $4,000 |
| Mar 11, 2013 | Completed final sign-off May 2013 | 1100 California St | barrier removeal - elevator access. increase cab size, ajust signage & buttons, adust controls & alarms.Details
barrier removeal - elevator access. increase cab size, ajust signage & buttons, adust controls & alarms. | $10,080 |
| Feb 26, 2013 | Completed final sign-off Mar 2014 | 1100 California St | water proofing repair and related code compliance work handrails lighting under seperate permit. concrete steps.Details
water proofing repair and related code compliance work handrails lighting under seperate permit. concrete steps. | $1,250,000 |
| Jun 25, 2012 | Completed final sign-off Sep 2012 | 1100 California St | all work is interior no exterior work. 1. adjust 2 door swings interior 2. install grab bars/ adjust accessories in restrooms 3. adjust interior signage for ada compliance. 4. emergency evacuation signageDetails
all work is interior no exterior work. 1. adjust 2 door swings interior 2. install grab bars/ adjust accessories in restrooms 3. adjust interior signage for ada compliance. 4. emergency evacuation signage | $8,500 |
| Feb 26, 2010 | Completed final sign-off Oct 2010 | 1100 California St | structural roof repairs, new roofing (to match existing). ada access improvements: (n) ramp to restroom & 1-h/c restroom.Details
structural roof repairs, new roofing (to match existing). ada access improvements: (n) ramp to restroom & 1-h/c restroom. | $225,000 |
| May 23, 2007 | Completed final sign-off Dec 2007 | 1100 California St | install ada access ramp/comply with title 24 requirements. barrier romovalwork onlyl.Details
install ada access ramp/comply with title 24 requirements. barrier romovalwork onlyl. | $15,000 |
| Oct 2, 2006 | Expired or cancelled expired Feb 2009 | 1112 Jones St | this application removes the adjustment of doors, # 5 (cover sheet). this is an administrative amendment to application # 200606143973. this amendment is to adjust the p.a. requirements, meeting the 20% rule 1134 b.2.1.Details
this application removes the adjustment of doors, # 5 (cover sheet). this is an administrative amendment to application # 200606143973. this amendment is to adjust the p.a. requirements, meeting the 20% rule 1134 b.2.1. | |
| Jun 16, 2006 | Never finaled issued Jun 2006, no final | 1112 Jones St | re-roofing. 2 part unmodified urethane. 60 mils new concrete. 40 miles recoat type b. 60 mils epdm waterproof barrer. standing seam 16 oz lead coated copper. match prosile on cathdral. replace (e) lead roof with lead coated copper. (all non-structural work)Details
re-roofing. 2 part unmodified urethane. 60 mils new concrete. 40 miles recoat type b. 60 mils epdm waterproof barrer. standing seam 16 oz lead coated copper. match prosile on cathdral. replace (e) lead roof with lead coated copper. (all non-structural work) | $50,000 |
| Jun 14, 2006 | Completed final sign-off Nov 2006 | 1112 Jones St | structural roof repairs. new roofing (to match existing). ada upgrade.Details
structural roof repairs. new roofing (to match existing). ada upgrade. | $99,230 |
| Feb 23, 2000 | Completed final sign-off Jul 2001 | 1100 California St | replace damaged sheet metal & concrete roof, clean, repair & seal ext wall surfaceDetails
replace damaged sheet metal & concrete roof, clean, repair & seal ext wall surface | $1,000,000 |